HomeMy WebLinkAbout2009 08 24 Consent 202 Water Treatment Plant #2 UpgradeCOMMISSION AGENDA
ITEM 202
CONSENT
X
August 24, 2009
Meeting
INFORMATIONAL
I PUBLIC HEARING
REGULAR
MGI~ ~~ /DEPT 0 %/~
REQUEST: Utility Department Requesting Approval to enter into a contract for the
upgrade of the electrical wiring and equipment at Water Treatment Plant #2.
PURPOSE: The purpose of this Board item is to request authorization to enter into a
contractual agreement with Thompson Electric Company for $336,933.00 plus a
10% contingency.
CONSIDERATIONS:
This project is needed to upgrade the electrical wiring, components and controls
at Water Treatment Plant #2 at 700 Sheoah Boulevard. These upgrades are needed to
ensure reliability of the electrical system. This plant was originally placed in service in
1974 with additions and upgrades in 1985. Currently, some wiring has corrosion due to
chlorine gas that was once stored inside the facility and the controls have surpassed their
useful life.
These upgrades will also allow improved use of the SCADA system for remote
monitoring the plant functions and equipment. The design life of the upgrades should
extend the life expectancy of the plant electrical system for another twenty-five years.
Sealed bids were opened on July 24, 2009 under ITB018/09 KL. There were five
bids received. An additive alternate bid item was included for recommended electrical
work in the chemical feed building. The low bidder including the additive alternate item
was Thompson Electric Company of Winter Park with a total bid of $336,933.00. The
engineer's opinion of probably cost was $339,911.
Consent Agenda Item 202
August 24, 2009
Page 2
The bid by Thompson Electric Company meets the requirements delineated in
the ITB. Thompson Electric Company has previously preformed satisfactory work for the
City. The recommendation from CPH Engineers, Inc is attached.
FUNDING:
The funding for this project is budgeted in the current fiscal year under the
line code 3600-65000-30028. The amount budgeted for this project is $300,000.
$75,000 will be transferred from the SR 46 Alternative Water Study to cover the
additional project costs needed for contingency and construction administration
services.
RECOMMENDATION:
It is recommended that authorization be given to enter into a contractual
agreement with Thompson Florida Industrial Electric, Inc in the amount of
$336,933.00 plus 10% contingency payable from Utility Enterprise Fund 3600-
65000-30028.
IMPLEMENTATION SCHEDULE:
The scope of work will be completed within 240 days of approval.
ATTACHMENTS:
1. Agreement Form
2. CPH Engineers, Inc. Recommendation
3. Bid Tab ITB 018/09 KL
COMMISSION ACTION:
ATTACHMENT NO. 1
July 31, 2009
Mr. Kipton Lockcuff, P.E., Director
Public Works Department
City of Winter Springs
1126 E. SR 434
Winter Springs, FL 32708
Re: Water Treatment Plant No.
Engineer's Bid Review
CPH Project No. W04130
Dear Mr. Lockcuff:
2 -Electrical System Improvements
1117 East Robinson Street
Orlando, Florida 32801
Phone: 407.425.0452
Fax: 407.648.1036
www.cphengineers.com
After the bid opening, we were provided with copies of the bid packages from the City for all of
the bidders on the above referenced project. Five (5) bids were received. In order of increasing
total bid price, we have ranked the three lowest bidders using a combined total for the Base Bid
and Additive Alternate No. 1. The Engineer's Opinion of Probable Construction Cost was
$339,910.96.
Rank Bidder Total Bid
1 Thom son Electric Com an $336,933.00
2 Control En ineerin Grou ,Inc. $345,600.00
3 Chinchor Electric, Inc. $357,025.00
In an effort to review previous related work, CPH Engineers has contacted three references
each provided by the three lowest bidders. We also reviewed the bid packages for
responsiveness according to the contract documents. We are attaching, for the City's use, a
copy of the reference checklists and a copy of the information checklists. From the information
provided, we believe that Thompson Electric Company has the experience and resources to
construct the "WTP No. 2 Electrical System Improvements" project.
Based on our review of the available data (bid package, previous work, and bid bond), we have no
objection to the City proceeding with the award of the bid to Thompson Electric Company in the
amount of $336,933.00.
Please note that we have not reviewed any financial data other than bonding capability, as we are
not accounting professionals. The bonds and insurance as required by the specifications will be
reviewed by the City prior to execution of the agreement between the two parties.
Please contact us if additional information is needed concerning the above.
Sincerely,
CPH NGINEERS
~ .S
colt A. Breitenstein, P.E.
Project Manager
J:\W04130\Documents\Letter\BID RECOMMENDATION LETTER.doc
Engineers • Surveyors • Architects (AA26000926) • Planners • Landscape Architects • Environmental Scientists • Construction Management • Design/Build
REFERENCE CHECKLIST
CITY OF WINTER SPRINGS
WATER TREATMENT PLANT NO. 2 ELECTRICAL SYSTEM IMPROVEMENTS
Item Reference for: Thom son Electric Com an
No. 1 No. 2 No. 3
Project Name Lake Groves WTP Lake Groves WWTP Wekiva WTP & WWTP
Owner
Contact Sunshine Building & Construction/John Bush Utilities Inc /Bryan Gongre Utilities Inc /Bryan Gongre
Address
Phone Number 407-339-6721 407-869-1919, ext. 226 407-869-1919, ext. 226
Ori final Contract
Change Orders
Final Contract $1, 164,683 $887,971 $763,538
Com leted on Schedule/Date 2007 2009 2007
.5 MGD -Installed under Siemens; all Ele ctrical control upgrade. Had to make switch
Project Description Pumps, conduits, generator, etc. electrical NCC's, PLC for reuse over while sta in on line.
Comments 1. How was their quality of work? 1. How was their quality of work? 1. How was their quality of work?
.• Great • Excellent :• Excellent
2. Did the Contractor do most of the work or 2. Did the Contractor do most of the work or 2. Did the Contractor do most of the work or
did they subcontract a lot of it? did they subcontract a lot of it? did they subcontract a lot of it?
Did all :• Did all • Did all
3. Was the job finished on schedule? 3. Was the job finished on schedule? 3. Was the job finished on schedule?
Yes Yes •:• Yes
4. Were they generally cooperative? 4. Were they generally cooperative? 4. Were they generally cooperative?
:• Yes Yes :• Yes
5. Did they constantly request "extras" to the 5. Did they constantly request "extras" to the 5. Did they constantly request "extras" to the
contract? contract? contract?
'• Owner requested •:• Reasonable :• No
6. Were there any financial claims for unpaid 6. Were there any financial claims for unpaid 6. Were there any financial claims for unpaid
bills through the subcontractors? bills through the subcontractors? bills through the subcontractors?
N/A :• N/A •:• N/A
7. Were pay request in accordance with work 7. Were pay request in accordance with 7. Were pay request in accordance with
completed? work completed? work completed?
Yes Yes Yes
8. Who was the Superintendent and did he do 8. Who was the Superintendent and did he 8. Who was the Superintendent and did he
a good job? do a good job? do a good job?
• Harold; yes :• GC was FL Environmental; Mark/yes Didn't remember -they were GC
9. What is the overall evaluation of the 9. What is the overall evaluation of the 9. What is the overall evaluation of the
company? company? company?
•:• A+ They use them exclusively on all their :• Excellent Excellent
jobs
REFERENCE CHECKLIST
CITY OF WINTER SPRINGS
WATER TREATMENT PLANT NO. 2 ELECTRICAL SYSTEM IMPROVEMENTS
Item Reference for: Control En ineerin Grou ,Inc.
No. 1 No. 2 No. 3
Project Name Umatilla Health Clinic Renovations Forest City Elementary School Addition Tavares Middle School Class Additions
Owner Lake County Development Seminole County School Board Volusia County School Board
Contact R.D. Michaels, Inc -Chris Barnes R.E. Harris Corp -Keith Lust PPI Construction Mgmt -Glenn Mullins
Address
Phone Number 407-831-1110 407-681-0004 407-359-1660, ext. 239
Ori final Contract
Change Orders
Final Contract $531,068 $1.2 Million $569,300
Com leted on Schedule/Date 02/2008 12/07 06/2006
Project Description 4,000-5,000 SF Bldg -Remodel/Addition
inclusive of chiller system, panels w/separate Complete electrical system for 2-story building
High and low voltage electrical installation
plus renovations on single story
meters, etc.
Comments 1. How was their quality of work? 1. How was their quality of work? 1. How was their quality of work?
• Good :• Good :• OK
2. Did the Contractor do most of the work or 2. Did the Contractor do most of the work or 2. Did the Contractor do most of the work or
did they subcontract a lot of it? did they subcontract a lot of it? did they subcontract a lot of it?
Low voltage, fire alarm, lightning protection • Fire alarm; data • Did all
3. Was the job finished on schedule? 3. Was the job finished on schedule? 3. Was the job finished on schedule?
Yes •:• Yes • Yes
4. Were they generally cooperative? 4. Were they generally cooperative? 4. Were they generally cooperative?
Yes :• Yes Yes
5. Did they constantly request "extras" to the 5. Did they constantly request "extras" to the 5. Did they constantly request "extras" to the
contract? contract? contract?
•:• Reasonable, but slow to process • Reasonable •:• Owner requested; however, C.O.'s were
6. Were there any financial claims for unpaid 6. Were there any financial claims for unpaid high and were negotiated
bills through the subcontractors? bills through the subcontractors? 6. Were there any financial claims for unpaid
:• No No bills through the subcontractors?
7. Were pay request in accordance with work 7. Were pay request in accordance with s N/A
completed? work completed? 7. Were pay request in accordance with
'• yes :• Yes work completed?
8. Who was the Superintendent and did he do 8. Who was the Superintendent and did he :• Yes
a good job? do a good job? 8. Who was the Superintendent and did he
:• Field Supervisor was good, but Project :• Didn't remember do a good job?
Management was not very responsive 9. What is the overall evaluation of the • Didn't remember
9. What is the overall evaluation of the company? 9. What is the overall evaluation of the
company? Good. Would use again company?
If bid price was good, would use again; :• 7 or 8 on a scale of 1-10. Noted they
however, would prefer a "stronger seem better at specialty control work (low
contractor" voltage vs high voltage)
REFERENCE CHECKLIST
CITY OF WINTER SPRINGS
WATER TREATMENT PLANT NO. 2 ELECTRICAL SYSTEM IMPROVEMENTS
Item Reference for: Chinchor Electric, Inc.
No. 1 No. 2 No. 3
Project Name Compressor Drives Glen Abbey Phase I David Hanson WWTP in Bushnell
Owner Cisco Foods Volusia County Indian River Industrial Center
Contact Allen Burgess Ted Trimmell Steven Ray
Address
Phone Number 407-877-1458 386-804-7790 904-262-2000, ext. 17
Ori final Contract
Change Orders
Final Contract $500,000 $896,000 $348,993
Com leted on Schedule/Date 2008 Fall 2006 2008
Project Description Installation of compressor/variable drives; New electrical room; diesel generator and tank Control centers, wiring, instrumentation, 6
condenser drives; eva oration blowers and um s, Crom tanks
Comments 1. How was their quality of work? 1. How was their quality of work? 1. How was their quality of work?
d• Good :• Good :• Good
2. Did they Contractor do most of the work or 2. Did they Contractor do most of the work or 2. Did they Contractor do most of the work or
did the subcontract a lot of it? did the subcontract a lot of it? did the subcontract a lot of it?
Did all .• A/C, Process control panel, diesel Subbed lightning protection
3. Was the job finished on schedule? generator and diesel fuel tanks 3. Was the job finished on schedule?
• Yes 3. Was the job finished on schedule? • yes
4. Were they generally cooperative? :• No, but no liquidated damages charged 4. Were they generally cooperative?
.• Yes -very 4. Were they generally cooperative? •:• Yes
5. Did they constantly request "extras" to the :• yes 5. Did they constantly request "extras" to the
contract? 5. Did they constantly request "extras" to the contract?
:• No contract? •:• Owner requested
6. Were there any financial claims for unpaid s• Reasonable 6. Were there any financial claims for unpaid
bills through the subcontractors? 6. Were there any financial claims for unpaid bills through the subcontractors?
N/A bills through the subcontractors? •3 No
7. Were pay request in accordance with work • Yes (sub required money up front) 7. Were pay request in accordance with
completed? 7. Were pay request in accordance with work completed?
• Yes work completed? • Yes
8. Who was the Superintendent and did he do :• Yes 8. Who was the Superintendent and did he
a good job? 8. Who was the Superintendent and did he do a good job?
• Sean and John; yes do a good job? .~ Tim Chinchor
9. What is the overall evaluation of the David (not there any more); yes 9. What is the overall evaluation of the
company? 9. What is the overall evaluation of the company?
• Good. Would use again. company? .• Good. Have used on otherjobs
• Good
Information for: Thompson Electric Company
Ch
kli
t Submittals Received with Bid m
nt
C
ec
s
Yes
No
Incomplet
N/A o
me
s
Responsive Items per Contract Documents (1)
Bid Form Section 00410
1 Recei t of Addendum 1.02, A.2 X
2 Bid Amounts with Units Prices 1.03 X
3 Si natures for Bindin Bid 1.06 X
Instructions to Bidders Section 00200
1.05.6.1 .b Notarized Power-Of-Attorne X
1.05.6.1.c Bid Securi "Bid Bond Form" 00420 X
1.05.B.1.d Florida Trench Safe Act Statement Section 00430 X
1.05.6.1.e Qualification and Licensin in the State of Florida and Locali of Pro~ect X
In Addition (1 ): List of Recent Jobs References X
NOTE:
(1) Submittal of all Responsive items is required with the bid.
Information for: Control Engineering Group
Ch
kli
t Submittals Received with Bid t
C
ec
s
Yes
No
Incomplete
N/A ommen
s
Responsive Items per Contract Documents (1)
Bid Form Section 00410
1 Recei t of Addendum 1.02, A.2 X
2 Bid Amounts with Units Prices 1.03 X
3 Si natures for Bindin Bid 1.06 X
Instructions to Bidders Section 00200
1.05. B.1 .b Notarized Power-Of-Attorne X
1.05.B.1.c Bid Securi "Bid Bond Form" 00420 X
1.05. B.1 .d Florida Trench Safet Act Statement Section 00430 X
1.05.B.1.e Qualification and Licensin in the State of Florida and Localit of Pro~ect X
In Addition (1): List of Recent Jobs References X
NOTE:
(1) Submittal of all Responsive items is required with the bid.
Information for: Chinchor Electric Company
Ch
kli
t Submittals Received with Bid C
t
ec
s
Yes
No
Incomplete
N/A ommen
s
Responsive Items per Contract Documents (1)
Bid Form Section 00410
1 Recei t of Addendum 1.02, A.2 X
2 Bid Amounts with Units Prices 1.03 X
3 Si natures for Bindin Bid 1.06 X
Instructions to Bidders Section 00200
1.05.B.1.b Notarized Power-Of-Attorne X
1.05.6.1.c Bid Securit "Bid Bond Form" 00420 X
1.05.6.1.d Florida Trench Safet Act Statement Section 00430 X
1.05.B.1.e Qualification and Licensin in the State of Florida and Localit of Pro~ect X
In Addition (1): List of Recent Jobs References X
NOTE:
(1) Submittal of all Responsive items is required with the bid.
ATTACHMENT NO. 2
CITY OF WINTER SPRINGS. FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2799
Telephone (407) 327-1800
Utility /Public Works
Department
THIS AGREEMENT MADE THIS DAY OF 2009
between the CITY OF WINTER SPRINGS, a Florida municipal corporation (herein referred to as
OWNER) and , a corporation authorized and duly licensed to do
business in the State of Florida (herein referred to as CONTRACTOR), as follows:
DESCRIPTION OF WORK -CONTRACTOR shall perform the work, in accordance with
the Contract Documents for the construction of the Winter Springs Water Treatment
Plant No. 2 -Electrical System Improvements.
2. CONTRACT DOCUMENTS -The Contract Documents consist of this Agreement; all
Technical, General and Supplementary Conditions; the Drawings as listed on the Bid
Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued
after execution of this Agreement. These form the Contract and are incorporated into this
Contract by this reference.
3. ORDER OF PRECEDENCE - In case of any inconsistency in any of the documents
bearing on the Agreement between the OWNER and the CONTRACTOR, the
inconsistency shall be resolved by giving precedence in the following order:
a. Contractor's Bid (Proposal), Agreement, and Addenda
b. Change Orders
c. Special Conditions
d. General Conditions
e. Drawings
Any inconsistency in the work description shall be clarified by the OWNER and
performed by the CONTRACTOR.
4. AGREEMENT INTERPRETATION - At its discretion, during the course of the work,
should any errors, ambiguities, or discrepancies be found in the Agreement or
specifications, the OWNER at its sole discretion will interpret the intent of the Agreement
and work descriptions and the CONTRACTOR hereby agrees to abide by the OWNER's
interpretation and agrees to carry out the work in accordance with the decision of the
OWNER. When the material, article, or equipment is designated by a brand name and
more than one brand name is listed, it will be understood that the work is based on one
brand name only. The CONTRACTOR will be responsible for all coordination necessary
00520-1
to accommodate the material, article, or equipment being provided without additional
cost to the OWNER. A substitute material, article, or equipment is allowed if it is
reasonably equivalent to the brand name specified. The OWNER has full discretion to
decide whether a substitute is reasonably equivalent. CONTRACTOR must notify the
OWNER prior to use of the substitute for a specified brand name and allow the OWNER
to make a determination before CONTRACTOR uses the substitute.
5. CONTRACT TIME -The CONTRACTOR shall begin work within 10 days after the
issuance of a written Notice to Proceed and shall complete the work of the Winter
Springs Water Treatment Plant No. 2 Electrical System Improvements within 240
calendar days from the date of the Notice to Proceed. Extensions, if any, are authorized
by OWNER, and may only be granted in writing.
6. LIQUIDATED DAMAGES -OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in Paragraph 3 above, plus any
extensions thereof allowed in accordance with the General Conditions. They also
recognize the delays, expense, and difficulties involved in proving in a legal or arbitration
preceding the actual loss suffered by OWNER if the Work is not substantially complete
on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR
agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall
pay OWNER $500.00 for each day that expires after the time specified in Paragraph 5
for final completion until the work is finally complete, and that OWNER has paid to
CONTRACTOR the consideration of Ten ($10.00) Dollars as consideration for this
provision.
7. CONTRACT PRICE. UNIT PRICE CONTRACT - The OWNER will pay the
CONTRACTOR in current funds for the performance of the work, subject to additions
and deductions by Change Order, the Total Contract Price of
.Payments will be made to the CONTRACTOR for
actual quantities installed on the basis of the Schedule of Unit Prices included as a part
of the Bid, which shall be as fully a part of the Contract as if attached or repeated herein.
8. TERMINATION: DEFAULT BY CONTRACTOR AND OWNER'S REMEDIES -The
OWNER reserves the right to revoke and terminate this Agreement and rescind all rights
and privileges associated with this Agreement, without penalty, in the following
circumstances, each of which shall represent a default and breach of this Agreement:
a. CONTRACTOR defaults in the performance of any material covenant or
condition of this Agreement and does not cure such other default within seven (7)
calendar days after written notice from the OWNER specifying the default
complained of, unless, however, the nature of the default is such that it cannot, in the
exercise of reasonable diligence, be remedied within seven (7) calendar days, in
which case the CONTRACTOR shall have such time as is reasonably necessary to
remedy the default, provided the CONTRACTOR promptly takes and diligently
pursues such actions as are necessary therefore; or
b. CONTRACTOR is adjudicated bankrupt or makes any assignment for the benefit
of creditors or CONTRACTOR becomes insolvent, or is unable or unwilling to pay its
debts; or
00520-2
c. CONTRACTOR has acted negligently, as defined by general and applicable law,
in performing the Work hereunder; or
d. CONTRACTOR has committed any act of fraud upon the OWNER; or
e. CONTRACTOR has made a material misrepresentation of fact to the OWNER
while performing its obligations under this Agreement; or
f. CONTRACTOR is experiencing a labor dispute, which threatens to have a
substantial, adverse impact upon performance of this Agreement without prejudice to
any other right, or remedy OWNER may have under this Agreement.
Notwithstanding the aforementioned, in the event of a default by CONTRACTOR, the
OWNER shall have the right to exercise any other remedy the OWNER may have by
operation of law, without limitation, and without any further demand or notice. In the
event of such termination, OWNER shall be liable only for the payment of all unpaid
charges, determined in accordance with the provisions of this Agreement, for Work
properly performed prior to the effective date of termination
9. FORCE MAJEURE -Any delay or failure of either party in the performance of its
required obligations hereunder shall be excused if and to the extent caused by acts of
God; fire; flood; windstorm; explosion; riot; war; sabotage; strikes (except involving
CONTRACTOR's labor force); extraordinary breakdown of or damage to OWNER 's
affiliates' generating plants, their equipment, or facilities; court injunction or order; federal
and/or state law or regulation; order by any regulatory agency; or cause or causes
beyond the reasonable control of the party affected; provided that prompt notice of such
delay is given by such party to the other and each of the parties hereunto shall be
diligent in attempting to remove such cause or causes. If any circumstance of Force
Majeure remains in effect for sixty days, either party may terminate this Agreement.
10. SEVERABILITY - In the event any portion or part thereof of this Agreement is deemed
invalid, against public policy, void, or otherwise unenforceable by a court of law, the
parties, at the sole discretion and option of the OWNER, shall negotiate an equitable
adjustment in the affected provision of this Agreement. The validity and enforceability of
the remaining parts of this Agreement shall otherwise be fully enforceable
11. PROGRESS PAYMENTS -OWNER shall make progress payments on account of the
contract price to CONTRACTOR, on the basis of application for payments submitted to
the OWNER or OWNER's Project Manager, by CONTRACTOR as the work progresses,
and in accordance with the Contract Documents.
Progress payments may be withheld if:
a. Work is found defective and not remedied;
b. Contractor does not make prompt and proper payments to subcontractors;
c. Contractor does not make prompts and proper payments for labor, materials, or
equipment furnished him;
d. Another Contractor is damaged by an act for which Contractor is responsible;
00520-3
e. Claims or liens are filed on the job; or
f. In the opinion of the City of Winter Springs, Contractor's work is not progressing
satisfactorily.
12. FINAL PAYMENT -OWNER shall withhold up to 10% of the Contract Price throughout
the project. The OWNER shall release 50% of the amount withheld upon issuance of
the Substantial Completion Certificate. The remaining 50% of the amount withheld shall
be released with the Final Payment after the issuance of the Final Completion
Certificate. OWNER shall make final payment to CONTRACTOR within thirty (30) days
after the work is fully and properly completed, if the contract has been fully and timely
performed, but subject to the condition that final payment shall not be due until
CONTRACTOR has delivered to OWNER a complete release of liens arising out the
contract, or receipt releases of lien fully covering all labor, materials and equipment for
which a lien could be filed, or in the alternative a bond satisfactory to OWNER
indemnifying him against such claims.
By making payments OWNER does not waive claims including but not limited to those
relating to:
a. Faulty work appearing after substantial completion has been granted;
b. Work that does not comply with the Contract Documents:
c. Outstanding claims of liens; or
d. Failure of Contractor to comply with any special guarantees required by the Contract
Documents.
13. DESIGNATION OF PROJECT MANAGER OR ARCHITECT OR LANDSCAPE
ARCHITECT: DUTIES AND AUTHORITY -The duties and authority of the OWNER are
as follows:
a. General Administration of Contract. The primary function of the OWNER is to
provide the general administration of the contract. In performance of these duties,
Kipton Lockcuff or his authorized representative is the OWNER's Project Manager
during the entire period of construction. The OWNER (CITY) may change the
Project Manager during the term of this contract.
b. Inspections, Opinions, and Progress Reports. The OWNER shall be kept
familiar with the progress and quality of the work by CONTRACTOR and may make
periodic visits to the work site. The OWNER will not be responsible for the means of
construction, or for the sequences, methods, and procedures used therein, or for the
CONTRACTOR's failure to perform the work in accordance with the Contract
Documents.
c. Access to Worksite for Inspections. The OWNER shall be given free access
to the worksite at all times during work preparation and progress. The Project
Manager is not obligated to make exhaustive or continuous on site inspections to
00520-4
perform his duties of checking and reporting on work progress, and any such
inspections shall not waive Owner's claim regarding defective work by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER
will be the initial interpreter of the contract document requirements, and make
decisions on claims and disputes between Contractor and Owner.
e. Refection and Stoppage of Work. The OWNER shall have authority to reject
work which in its opinion does not conform to the Contract Documents, and in this
connection may stop the work or a portion thereof, when necessary.
f. Pavment Certificates. The OWNER will determine the amounts owing to
CONTRACTOR as the work progresses, based on CONTRACTOR's applications
and OWNER's inspections and observations, and will issue certificates for progress
payments and final payments in accordance with the terms of the Contract
Documents.
14. PROGRESS MEETING -OWNER'S Project Manager may hold periodic progress
meetings on a monthly basis, or more frequently if required by the OWNER, during the
term of work entered into under this Agreement. CONTRACTOR's Project Manager and
all other appropriate personnel shall attend such meetings as designated by the
OWNER'S Project Manager.
15. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in
connection with the project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be
solely responsible for all construction under this contract, including the techniques,
sequences, procedures and means, for the coordination of all work. CONTRACTOR
shall supervise and direct the work, and give it all attention necessary for such
proper supervision and direction.
b. Discipline and Employment. CONTRACTOR shall maintain at all times strict
discipline among his employees, and he agrees not to employ for work on the project
any person unfit or without sufficient skill to perform the job for which he was
employed.
c. Furnishing of Labor, Materials, etc. CONTRACTOR shall provide and pay for
all labor, materials and equipment, including tools, construction equipment and
machinery, utilities, including water, transportation, and all other facilities and work
necessary for the proper completion of work on the project in accordance with the
Contract Documents.
d. Pavment of Taxes: Procurement of Licenses and Permits. CONTRACTOR
shall secure all licenses and permits necessary for proper completion of the work,
paying the fees thereof. CONTRACTOR warrants that it (and subcontractors or
tradesmen, if authorized in the Contract Documents) hold or will secure all trade or
professional licenses required by law for CONTRACTOR to undertake the contract
work.
00520-5
e. CONTRACTOR will provide written guarantee for work and materials for one (1)
calendar year after acceptance by OWNER.
16. ASSIGNMENT -CONTRACTOR shall not assign or subcontract this Agreement, or any
rights or any monies due or to become due hereunder without the prior, written consent
of the OWNER.
a. If upon receiving written approval from OWNER, any part of this Agreement is
subcontracted by CONTRACTOR, CONTRACTOR shall be fully responsible to
OWNER for all acts and/or omissions performed by the subcontractor as if no
subcontract had been made.
b. If OWNER determines that any subcontractor is not performing in accordance
with this Agreement, OWNER shall so notify CONTRACTOR who shall take
immediate steps to remedy the situation.
c. If CONTRACTOR, prior to the commencement of any Work subcontracts any
part of this Agreement by the subcontractor, CONTRACTOR shall require the
subcontractor to provide OWNER and its affiliates with insurance coverage as set
forth by the OWNER.
17. THIRD PARTY RIGHTS -Nothing in this Agreement shall be construed to give any
rights or benefits to anyone other than OWNER and CONTRACTOR.
18. PROHIBITION AGAINST CONTINGENT FEES -CONTRACTOR warrants that it has
not employed or retained any company or person, other than a bona fide employee
working solely for the CONTRACTOR, to solicit or secure this Agreement, and that it has
not paid or agreed to pay any person, company, corporation, individual, or firm, other
than a bona fide employee working solely for the CONTRACTOR, any fee, commission,
percentage, gift, or other consideration contingent upon or resulting from the award or
making of this Agreement.
19. NO JOINT VENTURE -Nothing herein shall be deemed to create a joint venture or
principal-agent relationship between the parties and neither party is authorized to, nor
shall either party act toward third persons or the public in any manner which would
indicate any such relationship with the other party.
20. INDEMNIFICATION -CONTRACTOR shall indemnify and hold harmless the City, its
officers, employees, and city attorneys (individually and in their official capacity, from
liability, losses, damages, and costs, including, but not limited to, reasonable attorney's
fees, to the extent caused by the negligence, recklessness or intentional wrongful
misconduct of CONTRACTOR and persons employed or utilized by CONTRACTOR in
the performance of this Agreement.
The indemnification provided above shall obligate the CONTRACTOR to defend at its
own expense or to provide for such defense, at the option of the OWNER, as the case
may be, of any and all claims of liability and all suits and actions of every name and
description that may be brought against the OWNER or its officers, employees, and city
attorneys which may covered by this indemnification. In all events the OWNER and its
00520-6
officers, employees, and city attorneys shall be permitted to choose legal counsel of its
sole choice, the fees for which shall be reasonable and subject to and included with this
indemnification provided herein.
21. SAFETY -CONTRACTOR shall be solely and absolutely responsible and assume all
liability for the safety and supervision of its principals, employees, contractors, and
agents while performing work provided hereunder.
22. CORPORATE REPRESENTATIONS BY CONTRACTOR -CONTRACTOR hereby
represents and warrants to the OWNER the following:
a. CONTRACTOR is duly registered and licensed to do business in the State of
Florida and is in good standing under the laws of Florida, and is duly qualified and
authorized to carry on the functions and operations set forth in this Agreement.
b. The undersigned signatory for CONTRACTOR has the power, authority, and the
legal right to enter into and perform the obligations set forth in this Agreement and
all applicable exhibits thereto, and the execution, delivery, and performance hereof
by CONTRACTOR has been duly authorized by the board of directors and/or
president of CONTRACTOR. In support of said representation, CONTRACTOR
agrees to provide a copy to the OWNER of a corporate certificate of good standing
provided by the State of Florida prior to the execution of this Agreement.
c. CONTRACTOR is duly licensed under all local, state and federal laws to provide
the work stated in paragraph 1.0 herein. In support of said representation,
CONTRACTOR agrees to provide a copy of all said licenses to the OWNER prior to
the execution of this Agreement.
23. BOND -CONTRACTOR shall supply a materials, performance and payment bond(s) in
accordance with Florida law and to the satisfaction of OWNER, in an amount specified in
the Contract Documents.
24. INSURANCE -During the term of this Agreement, CONTRACTOR shall be responsible
for providing the types of insurance and limits of liability as set forth below.
a. The CONTRACTOR shall maintain comprehensive general liability insurance in
the minimum amount of $2,000,000 as the combined single limit for each occurrence
to protect the CONTRACTOR from claims of property damages which may arise
from any Work performed under this Agreement whether such Work are performed
by the CONTRACTOR or by anyone directly employed by or contracting with the
CONTRACTOR.
b. The CONTRACTOR shall maintain comprehensive automobile liability insurance
in the minimum amount of $1,000,000 combined single limit bodily injury and
minimum $1,000,000 property damage as the combined single limit for each
occurrence to protect the CONTRACTOR from claims for damages for bodily injury,
including wrongful death, as well as from claims from property damage, which may
arise from the ownership, use, or maintenance of owned and non-owned
automobiles, including rented automobiles whether such operations be by the
CONTRACTOR or by anyone directly or indirectly employed by the CONTRACTOR.
00520-7
c. The CONTRACTOR shall maintain, during the life of this Agreement, adequate
Workers' Compensation Insurance in at least such amounts as are required by law
and Employer's Liability Insurance in the minimum amount of $2,000,000 for all of its
employees performing Work for the OWNER pursuant to this Agreement.
Special Requirements. Current, valid insurance policies meeting the requirements
herein identified shall be maintained during the term of this Agreement. A copy of a
current Certificate of Insurance shall be provided to the OWNER by CONTRACTOR
upon the Effective Date of this Contract which satisfied the insurance requirements of
this paragraph 24. Renewal certificates shall be sent to the OWNER 30 days prior to any
expiration date. There shall also be a 30-day advance written notification to the OWNER
in the event of cancellation or modification of any stipulated insurance coverage. The
OWNER shall be an additional named insured on all stipulated insurance policies
as its interest may appear, from time to time.
Independent Associates and Consultants. All independent contractors or agents
employed by CONTRACTOR to perform any Work hereunder shall fully comply with the
insurance provisions contained in these paragraphs for sections 21 and 24.
25. MEDIATION/VENUE -The parties agree that should any dispute arise between them
regarding the terms or performance of this Agreement, both parties will participate in
mediation. The parties agree to equally share the cost of the mediator. Should the
parties fail to resolve their differences through mediation, then any cause of action filed
hereunder shall be filed in the Circuit or County Court for Seminole County, Florida.
26. GOVERNING LAW & VENUE -This Agreement is made and shall be interpreted,
construed, governed, and enforced in accordance with the laws of the State of Florida.
Venue for any state action or litigation shall be Seminole County, Florida. Venue for any
federal action or litigation shall be Orlando, Florida.
27. ATTORNEY'S FEES -Should either party bring an action to enforce any of the terms of
this Agreement, the prevailing party shall be entitled, to the extent permitted by law, to
recover from the non-prevailing party the costs and expenses of such action including,
but not limited to, reasonable attorney's fees, whether at settlement, trial or on appeal.
28. NOTICES -Any notice or approval under this Contract shall be sent, postage prepaid, to
the applicable party at the address shown on the first page of this Contract.
29. WORK IS A PRIVATE UNDERTAKING -With regard to any and all Work performed
hereunder, it is specifically understood and agreed to by and between the parties hereto
that the contractual relationship between the OWNER and CONTRACTOR is such that
the CONTRACTOR is an independent contractor and not an agent of the OWNER. The
CONTRACTOR, its contractors, partners, agents, and their employees are independent
contractors and not employees of the OWNER. Nothing in this Agreement shall be
interpreted to establish any relationship other than that of an independent contractor,
between the OWNER, on one hand, and the CONTRACTOR, its contractors, partners,
employees, or agents, during or after the performance of the Work under this
Agreement.
30. DOCUMENTS -Public Records: It is hereby specifically agreed that any record,
document, computerized information and program, audio or video tape, photograph, or
00520-8
other writing of the CONTRACTOR and its independent contractors and associates
related, directly or indirectly, to this Agreement, may be deemed to be a Public Record
whether in the possession or control of the OWNER or the CONTRACTOR. Said record,
document, computerized information and program, audio or video tape, photograph, or
other writing of the CONTRACTOR is subject to the provisions of Chapter 119, Florida
Statutes, and may not be destroyed without the specific written approval of the
OWNER's City Manager. Upon request by the OWNER, the CONTRACTOR shall
promptly supply copies of said public records to the OWNER. All books, cards, registers,
receipts, documents, and other papers in connection with this Agreement shall at any
and all reasonable times during the normal working hours of the CONTRACTOR be
open and freely exhibited to the OWNER for the purpose of examination and/or audit.
The CONTRACTOR acknowledges that the OWNER is a Florida municipal corporation
and subject to the Florida Public Records Law. CONTRACTOR agrees that to the extent
any document produced by CONTRACTOR under this Agreement constitutes a Public
Record; CONTRACTOR shall comply with the Florida Public Records Law.
31. SOVEREIGN IMMUNITY -Notwithstanding any other provision set forth in this
Agreement, nothing contained in this Agreement shall be construed as a waiver of
the CITY'S right to sovereign immunity under Section 768.28, or other limitations
imposed on the CITY'S potential liability under state or federal law. As such, the
CITY shall not be liable, under this Agreement for punitive damages or interest for
the period before judgment. Further, the CITY shall not be liable for any claim or
judgment, or portion thereof, to any one person for more than one hundred
thousand dollars ($100,000.00), or any claim or judgment, or portion thereof,
which, when totaled with all other claims or judgments paid by the State or its
agencies and subdivisions arising out of the same incident or occurrence,
exceeds the sum of two hundred thousand dollars ($200,000.00).
32. HEADINGS -Paragraph headings are for the convenience of the parties only and are
not to be construed as part of this Agreement.
33. INTEGRATION: MODIFICATION - The drafting, execution, and delivery of this
Agreement by the Parties has been induced by no representations, statements,
warranties, or agreements other than those expressed herein. This Agreement
embodies the entire understanding of the parties, and there are no further or other
agreements or understandings, written or oral, in effect between the parties relating to
the subject matter hereof unless expressly referred to herein. Modifications of this
Agreement shall only be made in writing signed by both parties.
34. WAIVER AND ELECTION OF REMEDIES -Waiver by either party of any terms, or
provision of this Agreement shall not be considered a waiver of that term, condition, or
provision in the future. No waiver, consent, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized
representative of each party hereto. This Agreement may be executed in any number of
counterparts, each of which when so executed and delivered shall be considered an
original agreement; but such counterparts shall together constitute but one and the same
instrument.
00520-9
35. DRAFTING -OWNER and CONTRACTOR each represent that they have both shared
equally in drafting this Agreement and no party shall be favored or disfavored regarding
the interpretation of this Agreement in the event of a dispute between the parties.
36. NOTICE -Any notices required to be given by the terms of this Agreement shall be
delivered by hand or mailed, postage prepaid to:
For CONTRACTOR:
For OWNER:
City of Winter Springs
Capitol Projects Coordinator, Public Works Department
1126 East State Road 434
Winter Springs, FL 32708
Either party may change the notice address by providing the other party written notice of
the change.
00520-10
Signed, Sealed and Delivered in the presence of:
CONTRACTOR:
Name
Title
Business Address
City, State Zip
Date
OWNER:
CITY OF WINTER SPRINGS
By: Kevin L. Smith
City Manager
1126 East State Road 434
Winter Springs, FL. 32708
407-327-1800
00520-11
CITY OF WINTER SPRINGS, FL
1126 EAST STATE ROAD 434
WINTER SPRINGS, FL 32708
407-327-1800
ITB018/09/ KL
Water Treatment Plant No. 2
Electrical System Improvements
Called By: Nancy Vobornik-Purchasing Coordinator
ITB Opened: 3:00 PM ITB Closed : 3:06 PM
Date: July 24, 2009
Attachment No. 3
Witness: Kip Lockcuff, Public Works/Utility Director
Brandes Design-Build, Inc
2151 NE Coachman Rd
Clearwater, FL 33765 Phone: 727-445-7544
Base Bid: $ 335,500.00
Additive Alternate No 1 $ 23,825.00
Thompson Electric Company
PO Box 1478
Winter Park, FL 32790 Phone- 407-365-6666
Base Bid: $ 325,983.00
Additive Alternate No 1 $10,950.00
Control Engineering Group, Inc
175 Semoran Commerce Place, Suite C
Apopka, FL 32703 Phone: 407-889-2432 Fax: 407-889-2472
Base Bid: $ 323,000.00
Additive Alternate No 1 $22,600.00
Chinchor Electric, Inc
PO Box 4311
Enterprise, FL 32725 Phone: 386-774-1020 Fax: 386-774-7223
Base Bid: $ 331,544.00
Additive Alternate No 1 $ 25,481.00
Florida Industrial Electric
1050 Miller Drive
Altamonte Springs, FL 32701 Phone: 407-331-1551 Fax: 407-331-0444
Base Bid: $ 356,415.00
Additive Alternate No 1 $16, 769.00
0
`��rITER S
O%
0 CITY OF WINTER SPRINGS. FLORIDA
u co
Incorporated 1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708 -2799
lb L 0 RIO P Telephone (407) 327 -1800
Utility Public Works
Department
THIS AGREEMENT MADE THIS 1 7'' DAY OF S 46.r 0/- 2009
between the CITY OF WINTER SPRINGS, a Florida munici cgr raatior (herein referred to as
OWNER) and Electric a au�flonzecaan au y licensed to do
business in the State of Florida (herein referred to as CONTRACTOR), as follows:
1. DESCRIPTION OF WORK CONTRACTOR shall perform the work, in accordance with
the Contract Documents for the construction of the Winter Springs Water Treatment
Plant No. 2 Electrical System Improvements.
2. CONTRACT DOCUMENTS The Contract Documents consist of this Agreement; all
Technical, General and Supplementary Conditions; the Drawings as listed on the Bid
Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued
after execution of this Agreement. These form the Contract and are incorporated into this
Contract by this reference.
3. ORDER OF PRECEDENCE In case of any inconsistency in any of the documents
bearing on the Agreement between the OWNER and the CONTRACTOR, the
inconsistency shall be resolved by giving precedence in the following order:
a. Contractor's Bid (Proposal), Agreement, and Addenda
b. Change Orders
c. Special Conditions
d. General Conditions
e. Drawings
Any inconsistency in the work description shall be clarified by the OWNER and
performed by the CONTRACTOR.
4. AGREEMENT INTERPRETATION At its discretion, during the course of the work,
should any errors, ambiguities, or discrepancies be found in the Agreement or
specifications, the OWNER at its sole discretion will interpret the intent of the Agreement
and work descriptions and the CONTRACTOR hereby agrees to abide by the OWNER's
interpretation and agrees to carry out the work in accordance with the decision of the
OWNER. When the material, article, or equipment is designated by a brand name and
more than one brand name is listed, it will be understood that the work is based on one
brand name only. The CONTRACTOR will be responsible for all coordination necessary
00520 -1
to accommodate the material, article, or equipment being provided without additional
cost to the OWNER. A substitute material, article, or equipment is allowed if it is
reasonably equivalent to the brand name specified. The OWNER has full discretion to
decide whether a substitute is reasonably equivalent. CONTRACTOR must notify the
OWNER prior to use of the substitute for a specified brand name and allow the OWNER
to make a determination before CONTRACTOR uses the substitute.
5. CONTRACT TIME The CONTRACTOR shall begin work within 10 days after the
issuance of a written Notice to Proceed and shall complete the work of the Winter
Springs Water Treatment Plant No. 2 Electrical System Improvements within 240
calendar days from the date of the Notice to Proceed. Extensions, if any, are authorized
by OWNER, and may only be granted in writing.
6. LIQUIDATED DAMAGES OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in Paragraph 3 above, plus any
extensions thereof allowed in accordance with the General Conditions. They also
recognize the delays, expense, and difficulties involved in proving in a legal or arbitration
preceding the actual loss suffered by OWNER if the Work is not substantially complete
on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR
agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall
pay OWNER $500.00 for each day that expires after the time specified in Paragraph 5
for final completion until the work is finally complete, and that OWNER has paid to
CONTRACTOR the consideration of Ten ($10.00) Dollars as consideration for this
provision.
7. CONTRACT PRICE, UNIT PRICE CONTRACT The OWNER will pay the
CONTRACTOR in current funds for the performance of the work, subject to additions
and deductions by Change Order, the Total Contract Price of $336,933.00
Payments will be made to the CONTRACTOR for
actual quantities installed on the basis of the Schedule of Unit Prices included as a part
of the Bid, which shall be as fully a part of the Contract as if attached or repeated herein.
8. TERMINATION; DEFAULT BY CONTRACTOR AND OWNER'S REMEDIES The
OWNER reserves the right to revoke and terminate this Agreement and rescind all rights
and privileges associated with this Agreement, without penalty, in the following
circumstances, each of which shall represent a default and breach of this Agreement:
a. CONTRACTOR defaults in the performance of any material covenant or
condition of this Agreement and does not cure such other default within seven (7)
calendar days after written notice from the OWNER specifying the default
complained of, unless, however, the nature of the default is such that it cannot, in the
exercise of reasonable diligence, be remedied within seven (7) calendar days, in
which case the CONTRACTOR shall have such time as is reasonably necessary to
remedy the default, provided the CONTRACTOR promptly takes and diligently
pursues such actions as are necessary therefore; or
b. CONTRACTOR is adjudicated bankrupt or makes any assignment for the benefit
of creditors or CONTRACTOR becomes insolvent, or is unable or unwilling to pay its
debts; or
00520 -2
c. CONTRACTOR has acted negligently, as defined by general and applicable law,
in performing the Work hereunder; or
d. CONTRACTOR has committed any act of fraud upon the OWNER; or
e. CONTRACTOR has made a material misrepresentation of fact to the OWNER
while performing its obligations under this Agreement; or
f. CONTRACTOR is experiencing a labor dispute, which threatens to have a
substantial, adverse impact upon performance of this Agreement without prejudice to
any other right, or remedy OWNER may have under this Agreement.
Notwithstanding the aforementioned, in the event of a default by CONTRACTOR, the
OWNER shall have the right to exercise any other remedy the OWNER may have by
operation of law, without limitation, and without any further demand or notice. In the
event of such termination, OWNER shall be liable only for the payment of all unpaid
charges, determined in accordance with the provisions of this Agreement, for Work
properly performed prior to the effective date of termination
9. FORCE MAJEURE Any delay or failure of either party in the performance of its
required obligations hereunder shall be excused if and to the extent caused by acts of
God; fire; flood; windstorm; explosion; riot; war; sabotage; strikes (except involving
CONTRACTOR's labor force); extraordinary breakdown of or damage to OWNER 's
affiliates' generating plants, their equipment, or facilities; court injunction or order; federal
and /or state law or regulation; order by any regulatory agency; or cause or causes
beyond the reasonable control of the party affected; provided that prompt notice of such
delay is given by such party to the other and each of the parties hereunto shall be
diligent in attempting to remove such cause or causes. If any circumstance of Force
Majeure remains in effect for sixty days, either party may terminate this Agreement.
10. SEVERABILITY In the event any portion or part thereof of this Agreement is deemed
invalid, against public policy, void, or otherwise unenforceable by a court of law, the
parties, at the sole discretion and option of the OWNER, shall negotiate an equitable
adjustment in the affected provision of this Agreement. The validity and enforceability of
the remaining parts of this Agreement shall otherwise be fully enforceable
11. PROGRESS PAYMENTS OWNER shall make progress payments on account of the
contract price to CONTRACTOR, on the basis of application for payments submitted to
the OWNER or OWNER's Project Manager, by CONTRACTOR as the work progresses,
and in accordance with the Contract Documents.
Progress payments may be withheld if:
a. Work is found defective and not remedied;
b. Contractor does not make prompt and proper payments to subcontractors;
c. Contractor does not make prompts and proper payments for labor, materials, or
equipment furnished him;
d. Another Contractor is damaged by an act for which Contractor is responsible;
00520 -3
e. Claims or liens are filed on the job; or
f. In the opinion of the City of Winter Springs, Contractor's work is not progressing
satisfactorily.
12. FINAL PAYMENT OWNER shall withhold up to 10% of the Contract Price throughout
the project. The OWNER shall release 50% of the amount withheld upon issuance of
the Substantial Completion Certificate. The remaining 50% of the amount withheld shall
be released with the Final Payment after the issuance of the Final Completion
Certificate. OWNER shall make final payment to CONTRACTOR within thirty (30) days
after the work is fully and properly completed, if the contract has been fully and timely
performed, but subject to the condition that final payment shall not be due until
CONTRACTOR has delivered to OWNER a complete release of liens arising out the
contract, or receipt releases of lien fully covering all labor, materials and equipment for
which a lien could be filed, or in the alternative a bond satisfactory to OWNER
indemnifying him against such claims.
By making payments OWNER does not waive claims including but not limited to those
relating to:
a. Faulty work appearing after substantial completion has been granted;
b. Work that does not comply with the Contract Documents:
c. Outstanding claims of liens; or
d. Failure of Contractor to comply with any special guarantees required by the Contract
Documents.
13. DESIGNATION OF PROJECT MANAGER OR ARCHITECT OR LANDSCAPE
ARCHITECT: DUTIES AND AUTHORITY The duties and authority of the OWNER are
as follows:
a. General Administration of Contract. The primary function of the OWNER is to
provide the general administration of the contract. In performance of these duties,
Kipton Lockcuff or his authorized representative is the OWNER's Project Manager
during the entire period of construction. The OWNER (CITY) may change the
Project Manager during the term of this contract.
b. Inspections. Opinions, and Progress Reports. The OWNER shall be kept
familiar with the progress and quality of the work by CONTRACTOR and may make
periodic visits to the work site. The OWNER will not be responsible for the means of
construction, or for the sequences, methods, and procedures used therein, or for the
CONTRACTOR's failure to perform the work in accordance with the Contract
Documents.
c. Access to Worksite for Inspections. The OWNER shall be given free access
to the worksite at all times during work preparation and progress. The Project
Manager is not obligated to make exhaustive or continuous on site inspections to
00520 -4
perform his duties of checking and reporting on work progress, and any such
inspections shall not waive Owner's claim regarding defective work by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER
will be the initial interpreter of the contract document requirements, and make
decisions on claims and disputes between Contractor and Owner.
e. Rejection and Stoppage of Work. The OWNER shall have authority to reject
work which in its opinion does not conform to the Contract Documents, and in this
connection may stop the work or a portion thereof, when necessary.
f. Payment Certificates. The OWNER will determine the amounts owing to
CONTRACTOR as the work progresses, based on CONTRACTOR's applications
and OWNER's inspections and observations, and will issue certificates for progress
payments and final payments in accordance with the terms of the Contract
Documents.
14. PROGRESS MEETING OWNER'S Project Manager may hold periodic progress
meetings on a monthly basis, or more frequently if required by the OWNER, during the
term of work entered into under this Agreement. CONTRACTOR's Project Manager and
all other appropriate personnel shall attend such meetings as designated by the
OWNER'S Project Manager.
15. RESPONSIBILITIES OF CONTRACTOR CONTRACTOR's duties and rights in
connection with the project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be
solely responsible for all construction under this contract, including the techniques,
sequences, procedures and means, for the coordination of all work. CONTRACTOR
shall supervise and direct the work, and give it all attention necessary for such
proper supervision and direction.
b. Discipline and Employment. CONTRACTOR shall maintain at all times strict
discipline among his employees, and he agrees not to employ for work on the project
any person unfit or without sufficient skill to perform the job for which he was
employed.
c. Furnishing of Labor. Materials. etc. CONTRACTOR shall provide and pay for
all labor, materials and equipment, including tools, construction equipment and
machinery, utilities, including water, transportation, and all other facilities and work
necessary for the proper completion of work on the project in accordance with the
Contract Documents.
d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR
shall secure all licenses and permits necessary for proper completion of the work,
paying the fees thereof. CONTRACTOR warrants that it (and subcontractors or
tradesmen, if authorized in the Contract Documents) hold or will secure all trade or
professional licenses required by law for CONTRACTOR to undertake the contract
work.
00520 -5
e. CONTRACTOR will provide written guarantee for work and materials for one (1)
calendar year after acceptance by OWNER.
16. ASSIGNMENT CONTRACTOR shall not assign or subcontract this Agreement, or any
rights or any monies due or to become due hereunder without the prior, written consent
of the OWNER.
a. If upon receiving written approval from OWNER, any part of this Agreement is
subcontracted by CONTRACTOR, CONTRACTOR shall be fully responsible to
OWNER for all acts and/or omissions performed by the subcontractor as if no
subcontract had been made.
b. If OWNER determines that any subcontractor is not performing in accordance
with this Agreement, OWNER shall so notify CONTRACTOR who shall take
immediate steps to remedy the situation.
c. If CONTRACTOR, prior to the commencement of any Work subcontracts any
part of this Agreement by the subcontractor, CONTRACTOR shall require the
subcontractor to provide OWNER and its affiliates with insurance coverage as set
forth by the OWNER.
17. THIRD PARTY RIGHTS Nothing in this Agreement shall be construed to give any
rights or benefits to anyone other than OWNER and CONTRACTOR.
18. PROHIBITION AGAINST CONTINGENT FEES CONTRACTOR warrants that it has
not employed or retained any company or person, other than a bona fide employee
working solely for the CONTRACTOR, to solicit or secure this Agreement, and that it has
not paid or agreed to pay any person, company, corporation, individual, or firm, other
than a bona fide employee working solely for the CONTRACTOR, any fee, commission,
percentage, gift, or other consideration contingent upon or resulting from the award or
making of this Agreement.
19. NO JOINT VENTURE Nothing herein shall be deemed to create a joint venture or
principal -agent relationship between the parties and neither party is authorized to, nor
shall either party act toward third persons or the public in any manner which would
indicate any such relationship with the other party.
20. INDEMNIFICATION CONTRACTOR shall indemnify and hold harmless the City, its
officers, employees, and city attorneys (individually and in their official capacity, from
liability, losses, damages, and costs, including, but not limited to, reasonable attorney's
fees, to the extent caused by the negligence, recklessness or intentional wrongful
misconduct of CONTRACTOR and persons employed or utilized by CONTRACTOR in
the performance of this Agreement.
The indemnification provided above shall obligate the CONTRACTOR to defend at its
own expense or to provide for such defense, at the option of the OWNER, as the case
may be, of any and all claims of liability and all suits and actions of every name and
description that may be brought against the OWNER or its officers, employees, and city
attorneys which may covered by this indemnification. In all events the OWNER and its
00520 -6
officers, employees, and city attorneys shall be permitted to choose legal counsel of its
sole choice, the fees for which shall be reasonable and subject to and included with this
indemnification provided herein.
21. SAFETY CONTRACTOR shall be solely and absolutely responsible and assume all
liability for the safety and supervision of its principals, employees, contractors, and
agents while performing work provided hereunder.
22. CORPORATE REPRESENTATIONS BY CONTRACTOR CONTRACTOR hereby
represents and warrants to the OWNER the following:
a. CONTRACTOR is duly registered and licensed to do business in the State of
Florida and is in good standing under the laws of Florida, and is duly qualified and
authorized to carry on the functions and operations set forth in this Agreement.
b. The undersigned signatory for CONTRACTOR has the power, authority, and the
legal right to enter into and perform the obligations set forth in this Agreement and
all applicable exhibits thereto, and the execution, delivery, and performance hereof
by CONTRACTOR has been duly authorized by the board of directors and/or
president of CONTRACTOR. In support of said representation, CONTRACTOR
agrees to provide a copy to the OWNER of a corporate certificate of good standing
provided by the State of Florida prior to the execution of this Agreement.
c. CONTRACTOR is duly licensed under all local, state and federal laws to provide
the work stated in paragraph 1.0 herein. In support of said representation,
CONTRACTOR agrees to provide a copy of all said licenses to the OWNER prior to
the execution of this Agreement.
23. BOND CONTRACTOR shall supply a materials, performance and payment bond(s) in
accordance with Florida law and to the satisfaction of OWNER, in an amount specified in
the Contract Documents.
24. INSURANCE During the term of this Agreement, CONTRACTOR shall be responsible
for providing the types of insurance and limits of liability as set forth below.
a. The CONTRACTOR shall maintain comprehensive general liability insurance in
the minimum amount of $2,000,000 as the combined single limit for each occurrence
to protect the CONTRACTOR from claims of property damages which may arise
from any Work performed under this Agreement whether such Work are performed
by the CONTRACTOR or by anyone directly employed by or contracting with the
CONTRACTOR.
b. The CONTRACTOR shall maintain comprehensive automobile liability insurance
in the minimum amount of $1,000,000 combined single limit bodily injury and
minimum $1,000,000 property damage as the combined single limit for each
occurrence to protect the CONTRACTOR from claims for damages for bodily injury,
including wrongful death, as well as from claims from property damage, which may
arise from the ownership, use, or maintenance of owned and non -owned
automobiles, including rented automobiles whether such operations be by the
CONTRACTOR or by anyone directly or indirectly employed by the CONTRACTOR.
00520 -7
c. The CONTRACTOR shall maintain, during the life of this Agreement, adequate
Workers' Compensation Insurance in at least such amounts as are required by law
and Employer's Liability Insurance in the minimum amount of $2,000,000 for all of its
employees performing Work for the OWNER pursuant to this Agreement.
Special Requirements. Current, valid insurance policies meeting the requirements
herein identified shall be maintained during the term of this Agreement. A copy of a
current Certificate of Insurance shall be provided to the OWNER by CONTRACTOR
upon the Effective Date of this Contract which satisfied the insurance requirements of
this paragraph 24. Renewal certificates shall be sent to the OWNER 30 days prior to any
expiration date. There shall also be a 30 -day advance written notification to the OWNER
in the event of cancellation or modification of any stipulated insurance coverage. The
OWNER shall be an additional named insured on all stipulated insurance policies
as its interest may appear, from time to time.
Independent Associates and Consultants. All independent contractors or agents
employed by CONTRACTOR to perform any Work hereunder shall fully comply with the
insurance provisions contained in these paragraphs for sections 21 and 24.
25. MEDIATIONNENUE The parties agree that should any dispute arise between them
regarding the terms or performance of this Agreement, both parties will participate in
mediation. The parties agree to equally share the cost of the mediator. Should the
parties fail to resolve their differences through mediation, then any cause of action filed
hereunder shall be filed in the Circuit or County Court for Seminole County, Florida.
26. GOVERNING LAW VENUE This Agreement is made and shall be interpreted,
construed, governed, and enforced in accordance with the laws of the State of Florida.
Venue for any state action or litigation shall be Seminole County, Florida. Venue for any
federal action or litigation shall be Orlando, Florida.
27. ATTORNEY'S FEES Should either party bring an action to enforce any of the terms of
this Agreement, the prevailing party shall be entitled, to the extent permitted by law, to
recover from the non prevailing party the costs and expenses of such action including,
but not limited to, reasonable attorney's fees, whether at settlement, trial or on appeal.
28. NOTICES Any notice or approval under this Contract shall be sent, postage prepaid, to
the applicable party at the address shown on the first page of this Contract.
29. WORK IS A PRIVATE UNDERTAKING With regard to any and all Work performed
hereunder, it is specifically understood and agreed to by and between the parties hereto
that the contractual relationship between the OWNER and CONTRACTOR is such that
the CONTRACTOR is an independent contractor and not an agent of the OWNER. The
CONTRACTOR, its contractors, partners, agents, and their employees are independent
contractors and not employees of the OWNER. Nothing in this Agreement shall be
interpreted to establish any relationship other than that of an independent contractor,
between the OWNER, on one hand, and the CONTRACTOR, its contractors, partners,
employees, or agents, during or after the performance of the Work under this
Agreement.
30. DOCUMENTS Public Records: It is hereby specifically agreed that any record,
document, computerized information and program, audio or video tape, photograph, or
00520 -8
other writing of the CONTRACTOR and its independent contractors and associates
related, directly or indirectly, to this Agreement, may be deemed to be a Public Record
whether in the possession or control of the OWNER or the CONTRACTOR. Said record,
document, computerized information and program, audio or video tape, photograph, or
other writing of the CONTRACTOR is subject to the provisions of Chapter 119, Florida
Statutes, and may not be destroyed without the specific written approval of the
OWNER's City Manager. Upon request by the OWNER, the CONTRACTOR shall
promptly supply copies of said public records to the OWNER. All books, cards, registers,
receipts, documents, and other papers in connection with this Agreement shall at any
and all reasonable times during the normal working hours of the CONTRACTOR be
open and freely exhibited to the OWNER for the purpose of examination and/or audit.
The CONTRACTOR acknowledges that the OWNER is a Florida municipal corporation
and subject to the Florida Public Records Law. CONTRACTOR agrees that to the extent
any document produced by CONTRACTOR under this Agreement constitutes a Public
Record; CONTRACTOR shall comply with the Florida Public Records Law.
31. SOVEREIGN IMMUNITY Notwithstanding any other provision set forth in this
Agreement, nothing contained in this Agreement shall be construed as a waiver of
the CITY'S right to sovereign immunity under Section 768.28, or other limitations
imposed on the CITY'S potential liability under state or federal law. As such, the
CITY shall not be liable, under this Agreement for punitive damages or interest for
the period before judgment. Further, the CITY shall not be liable for any claim or
judgment, or portion thereof, to any one person for more than one hundred
thousand dollars ($100,000.00), or any claim or judgment, or portion thereof,
which, when totaled with all other claims or judgments paid by the State or its
agencies and subdivisions arising out of the same incident or occurrence,
exceeds the sum of two hundred thousand dollars ($200,000.00).
32. HEADINGS Paragraph headings are for the convenience of the parties only and are
not to be construed as part of this Agreement.
33. INTEGRATION; MODIFICATION The drafting, execution, and delivery of this
Agreement by the Parties has been induced by no representations, statements,
warranties, or agreements other than those expressed herein. This Agreement
embodies the entire understanding of the parties, and there are no further or other
agreements or understandings, written or oral, in effect between the parties relating to
the subject matter hereof unless expressly referred to herein. Modifications of this
Agreement shall only be made in writing signed by both parties.
34. WAIVER AND ELECTION OF REMEDIES Waiver by either party of any terms, or
provision of this Agreement shall not be considered a waiver of that term, condition, or
provision in the future. No waiver, consent, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized
representative of each party hereto. This Agreement may be executed in any number of
counterparts, each of which when so executed and delivered shall be considered an
original agreement; but such counterparts shall together constitute but one and the same
instrument.
00520 -9
r
35. DRAFTING OWNER and CONTRACTOR each represent that they have both shared
equally in drafting this Agreement and no party shall be favored or disfavored regarding
the interpretation of this Agreement in the event of a dispute between the parties.
36. NOTICE Any notices required to be given by the terms of this Agreement shall be
delivered by hand or mailed, postage prepaid to:
For CONTRACTOR:
For OWNER:
City of Winter Springs
Capitol Projects Coordinator, Public Works Department
1126 East State Road 434
Winter Springs, FL 32708
Either party may change the notice address by providing the other party written notice of
the change.
00520 -10
Signed, Sealed and Delivered in the presence of:
CONTRACTOR:
Sam hompson
A1
Name
Owner
Title
i t 2530 Mikler Road
Business Address
Oviedo, FL 32765
City, State Zip
Date 9-
OWNER:
CITY OF WINTER SPRIGS
B evin I
Y t h
City Manager
1126 East State Road 434
Winter Springs, FL. 32708
407 327 -1800
00520 -11