HomeMy WebLinkAbout2025 11 10 Awards and Presentation 100 - Raftelis Rate Study PresentationCity of Winter
Springs
2025 Water and Wastewater Rate
Study Update
November 10, 2025
2
Agenda
Key Forecast Assumptions
CIP Funding Plan
Revenue Sufficiency Forecast
Findings and Recommendations
Recent History - 2023 Rate Study
•City adopted a 5-year rate plan through FY 2028 to fund:
›$166.4 million of identified capital projects ($112.0 million for WWTPs)
›Debt service coverage for existing and proposed debt
›Increasing O&M costs and ongoing R&R needs
•City staff has tasked Raftelis with periodic rate plan updates as the costs
for the WWTPs becomes more clear
3
Operating Expense Forecast
•Increases most notably from:
›Budgets for ongoing repair and maintenance (R&M)
›Contract operating costs
•Does not project to have significant near-term impacts, but will contribute to
future rate adjustment needs
4
Annual O&M Costs 2026 2027 2028
2023 Rate Study $11,060,800 $11,358,100 $11,663,100
2025 Update $12,010,400 $12,283,800 $12,564,000
Increase $949,600 $925,700 $900,900
5
Fiscal Year Water Wastewater
% Change
Typical 5,000 Gal
Residential Bill
Adopted Rate Adjustments
Key Forecast
Assumptions
and Notes
6
- 2026 Budget
- Forecast remaining 5 years
Escalation Factors for:
-Labor -Health Insurance
-General Inflation -Electricity
-Chemicals -Fuel
Fully Funded CIP - $196.5 million from
FY 2025 – FY 2030
Issuance of new debt (SRF Loans) to fund Wastewater
Treatment Plans (WWTPs)
Review adequacy of adopted rate adjustments to meet
loan covenants, O&M expenses, CIP needs, and
maintain utility reserves
7
CIP Funding Plan
CIP Summary
Project FY 2026 –
FY 2030 Cost Notes
Water Supply and Treatment $9,730,500 Drinking water improvements
Water Transmission 10,956,900
Water meter and line
upgrades
WWTP Replacements 158,000,000
Replacement of East and
West WWTP
Sewer Treatment and Disposal 5,645,900
General wastewater plant
improvements
Sewer Collection/Lift Stations 4,122,200
Sanitary sewer and lift station
improvements
Reuse Pumping and Storage 2,115,400
Reclaimed water
improvements
Reuse Transmission 5,347,700 Reclaimed water expansion
General 660,865 Equipment and other
Total $196,579,465
8
WWTP Funding Plan
Project Updated
Cost Notes
East WWTP
Design ARPA Funds $4,800,000 ARPA funds
SRF Construction Loans 63,933,400 Series of $20m loans
Utility Cash 9,266,600 Utility reserve funds
Total East WWTP $78,000,000
West WWTP
SRF Design Loan $5,400,000 10-yr repayment period
SRF Construction Loans 59,500,100 Series of $20m loans
Utility Cash 15,099,900 Utility reserve funds
Total West WWTP $80,000,000
9
New Loans for Large Projects
10 Note: The City plans to use multiple SRF loans for each WWTP, based on discussions with FDEP staff.
Fiscal Year
SRF Design
Loan
East WWTP
SRF
West WWTP
SRF
Total
Proposed
2023 Study
Debt
Forecast
2026 $618,800 0 0 $618,800 $1,597,900
2027 $618,800 1,259,100 0 $1,877,900 $1,597,900
2028 $618,800 2,518,200 0 $3,137,000 $1,597,900
2029 $618,800 3,777,300 1,259,100 $5,655,200 $7,101,200
2030 $618,800 3,777,300 2,518,200 $6,914,300 $7,101,200
2031 $618,800 3,777,300 3,745,800 $8,141,900 $7,101,200
11
Fiscal Year Water Wastewater Notes
Preview of Potential Future Rate
Adjustments
Revenue
Sufficiency at
Adopted Rates
•Revenues phased in over time
to align with debt service
requirements FY 2030
•Rate adjustments will continue
to be tracked over next several
years – current rate plan is
sufficient
•Future rate adjustments may
be necessary with increased
construction estimates for
new WWTPs
12
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
Operating Expenses Debt Service
Other Expense/Transfers Revenues w/ Existing Rates
13
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030
412 Service Avail. Fee Fund 410 Operating Fund
Target (25% of Annual Revenue)
Fund Balance
Forecast
•The Operating fund should
be maintained to manage
cash flows and to address
emergency repairs
2026 Local Comparison at 5,000 gallons
consumption
$45.55
$46.48
$62.42
$69.83
$72.97
$80.99
$82.05
$82.42
$90.16
$96.69
$101.28
$0.00 $20.00 $40.00 $60.00 $80.00 $100.00 $120.00
Lake Mary
Altamonte Springs - FY 2026
Winter Park - FY 2026
Orlando *
Casselberry *
Sanford *
Longwood - FY 2026
Seminole County
Winter Springs - Existing 2026
Maitland - FY 2026
Oviedo - FY 2026
Water Sewer * Currently undergoing utility rate study
14
Findings and Conclusions
•Operating expenses have increased approximately $900,000 above
assumptions in the 2023 study
•WWTP construction costs have increased from $112 million to $158
million
•The WWTP projects have been pushed back a few years allow rate
revenues and cash reserves to build to pay for capital projects and debt
funding
•Construction of the East WWTP is anticipated to start in FY 2026
•Anticipating a rate adjustment of 5% in FY 2029 and FY 2030
•Continue to review the rate study assumptions as construction on the
WWTP begins
15
Contact: Joe Williams
407 960 1806 / jwilliams@raftelis.com
16
Thank you!