HomeMy WebLinkAbout2025 08 11 Awards and Presentations 100 - Citywide Stormwater Project UpdateAWARDS AND PRESENTATIONS ITEM 100
CITY COMMISSION AGENDA | AUGUST 11, 2025 REGULAR MEETING
TITLE
Citywide Stormwater Projects Update
SUMMARY
This Stormwater Briefing will provide an overview of all completed stormwater
projects and the current status of ongoing stormwater projects since Hurricane Ian.
There will also be a general update on the status of the Kimley Horn Stormwater
Improvement Program.
FUNDING SOURCE
RECOMMENDATION
No action by the City Commission is requested at this time.
6
CITY OF WINTER SPRINGS STORMWATER BRIEFING
City Commission Meeting
August 11, 2025 7
Presentation Outline 2
Current Stormwater
Projects
Available Stormwater
Related Grants
Stormwater Master Plan
Status
8
Summary of Stormwater Projects
3
Tuskawilla Crossings – Pond 1 Repair and Rehabilitation
Hurricane Ian NRCS Creek Debris Removal and Creek Sediment
Removal Projects
Gee Creek at Moss Park – NRCS Improvements
Wetland Park Outfall Improvements
City Hall Pond Drainage Pipe Repairs
135 East Trade Winds Road Swale Improvements
Deer Run Pond – Control Structure Modifications
9
Summary of Stormwater Projects (continued)
4
Bear Creek Estates – Phase 1 Drainage Evaluation
Acquisition of 1 Flood Prone Home (HMGP Project)
Elevation of 3 Flood Prone Homes (HMGP Project)
Flood Proofing of 12 Sanitary Lift Stations (HMGP Project)
Hurricane Milton NRCS Debris Removal and Creek Sediment Removal
Projects
Torcaso Park Stormwater Improvements
10
5
Overall
Improvement
Plan
Tuskawilla Crossings Pond 1
11
6
Aerial Drone Photograph Taken on September 1, 2023
12
7
POND 1 REPAIR AND REHABILITATION – BERM FAILURE
A Contractor has already
completed additional temporary
repairs for the berm failure
Photograph Taken on June 2, 2024
13
Tuskawilla Crossings Pond 1
8
Project Schedule
Application for “Site Work - Commercial Paving Grading and Drainage”
(Permit Number: COMM-2025-0264) was uploaded to the City’s Civic Access
Portal on March 26, 2025.
SJRWMD permit was received on June 20, 2025.
Bid documents were transmitted to City staff on July 11, 2025.
14
Hurricane Ian
NRCS Creek Debris Removal Project 9
Bear Creek
Gee Creek
No Name Creek
Sheoah Creek
Howell Creek
15
Hurricane Ian
NRCS Creek Sediment Removal Project 10
10 Sediment
Removal Locations
16
Gee Creek at Moss Park
11
Site
Improvement
Plan
17
Gee Creek at Moss Park
12
Before Construction
After Construction
18
Wetland Park Outfall Improvements
13Localized flooding
on Michael Blake
Boulevard
Drainage
improvements
within Wetland
Park east of the
Cross Seminole
Trail
Drainage
improvements
along Michael
Blake Boulevard
19
Wetland Park Outfall Improvements
14
SJRWMD ERP Application 22437-9 Submitted on 9/5/2024
SJRWMD Request for Additional Information (RAI) Received on
10/3/2024
Third Time Extension Submitted on 6/16/2025
Currently coordinating with District staff regarding wetland
mitigation and avoidance / minimization issues.
Issues related to work activities within land under the ownership and
control of the Board of Trustees of the Internal Improvement Trust
Fund of the State of Florida
20
City Hall Pond Drainage Pipe Repairs
15
Replaced
approximately
40 linear feet
of 42-inch CMP
with 40 linear
feet of 36-inch
HDPE
21
Swale #1, Swale #2 and Swale #3
16
135 East Trade Winds Road
22
135 East Trade Winds Road
17
23
Deer Run Pond – Control Structure Modifications
18
Project Location
Map
24
Deer Run Pond – Control Structure Modifications
19Project Location Map
25
Bear Creek Estates – Phase 1 Drainage Evaluation
20
Localized Flooding Occurs on
Northern Way near Brown Bear Court
Work Completed to Date
Specific Purpose Survey of Existing
Drainage Systems
Hydraulic Grade Line (HGL)
Analysis of Existing Drainage
Systems
Concept Plan – Northern Way
Drainage Improvements
26
21
Drainage
Basin Map
Bear Creek Estates – Phase 1 Drainage Evaluation
27
22
Concept Plan
– Northern
Way Drainage
Improvements
Bear Creek Estates – Phase 1 Drainage Evaluation
28
Acquisition of 1
Flood Prone Home
(HMGP Project)
23
HMGP Grant Application under
Hurricane Ian was submitted to
the State in August 2023.
The grant application is in FEMA’s
queue for federal award and
funding allocation.
Breakdown of Costs
Federal Match $271,801.13
Local (City) Match $90,600.38
Total Project Cost $362,401.50
29
Elevation of
3 Flood Prone Homes
(HMGP Project)
24
HMGP Grant Application under
Hurricane Ian was submitted to the
State in August 2023.
The grant application is in FEMA’s
queue for federal award and
funding allocation.
Breakdown of Costs
Federal Match $367,020.00
Local (Homeowners) Match $122,340.00
Total Project Cost $489,360.00
30
Flood Proofing 12 Sanitary Lift Stations (HMGP Project)
25
HMGP Grant Application
under Hurricane Ian was
submitted to the State in
August 2023.
The grant application is in
FEMA’s queue for federal
award and funding
allocation.
Breakdown of Costs
Federal Match $3,430,999.50
Local (City) Match $1,143,666.50
Total Project Cost
11/12/24
$4,574,666.00
31
Hurricane Milton
NRCS Creek Debris Removal Project 26
Sheoah Creek
Gee Creek
No Name Creek
Howell Creek
Bear Creek
Little Howell Creek –
Oak Forest
Little Howell Creek –
Winding Hollow
32
Hurricane Milton
NRCS Creek Sediment Removal Project 27
9 Sediment
Removal Locations
33
Torcaso Park Stormwater Improvements
28
Project Overview
The project involves enclosing
the existing drainage ditch
with a 48-inch drainage pipe.
Objective:
To enhance the area’s
aesthetic in anticipation of a
future monument installation.
34
CDBG-DR
(Disaster Recovery)
FEMA
HMGP
FDEM
Elevate Florida
CDBG-MIT
(Mitigation)
FHWA Bridge
Investment Program
FDEP
Resilient Florida
NRCS Emergency
Watershed Protection
ACOE CAP (Cont.
Authorities Program)
Summary of Available Stormwater Related Grants
FDEP
319(h)
FEMA
FMA
FEMA Hurricane
Loss Mitigation
SJRWMD Cost
Share Program
35
Stormwater Master Plan
30
Finalizing identifying Drainage Projects within each Drainage Basin
Establishing Project Costs and Prioritizing the Projects
Draft Stormwater Master Plan due September 29th
Stormwater Workshop scheduled for October 1st
Final Stormwater Master Plan due October 8th
City Commission to adopt the Stormwater Master Plan on October 13th
Stormwater Rate Study Presentation #1 scheduled for October 13th
36
Stormwater Master Plan (continued)
31
Stormwater Rate Study Presentation #1 scheduled
for October 13th
Stormwater Rate Study Presentation #2 scheduled
for October 27th
City Commission to adopt the new Stormwater
Billing Rate on October 27th
37
Questions and Answers
32
301 West State Road 434, Suite 309
Winter Springs, Florida 32708
Phone: 407-992-9160, ext. 309
E-mail: david@pegasusengineering.net
David W. Hamstra, P.E., CFM
Stormwater Department Manager
38