Loading...
HomeMy WebLinkAbout2025 07 14 Consent 302 - City Parks Sidewalk ImprovementsCONSENT AGENDA ITEM 302 CITY COMMISSION AGENDA | JULY 14, 2025 REGULAR MEETING TITLE City Parks Sidewalk Improvements SUMMARY Staff has conducted a thorough field inspection and subsequently coordinated a proposal for the replacement of damaged and non-compliant sidewalks within various City Parks. The City Parks that have been identified for this scope include: Central Winds Park, Sam Smith Park, Trotwood Park, Oak Hollow Park, Moss Park, and Torcaso Park. The proposed sidewalk improvements are part of an overall, ongoing initiative to improve the Citywide Sidewalk System in compliance with current design standards and related 1990 American with Disabilities Act (ADA) requirements. FUNDING SOURCE The funding source for these sidewalk improvements is provided by the Public Facilities Capital Improvement Fund-303. The $68,571.61 task order fee proposal is derived from the City's piggyback rider agreement with Huffman, Inc., DBA NuWave Concrete and their original agreement with Seminole County, Florida (IFB-604269- 22/LNF). RECOMMENDATION Staff requests City Commission approval of a Task Order for Huffman, Inc., DBA NuWave Concrete to provide sidewalk repair and replacement services located within various City parks in the amount of $68,571.61. 218 IFB-604269-22/LNF Seminole County PiggyBack Contract 7/2/2025 PAY ITEM NUMBER ITEM DESCRIPTION UNIT PLAN QTY CONTRACT UNIT BID PRICE COST 110-4-10 Removal of Existing Concrete SY 1,043.41 12.00 12,520.93 522-1 Sidewalk Concrete (4" Thick)SY 974.97 53.00 51,673.23 522-2 Sidewalk Concrete (6" Thick)SY 68.44 64.00 4,380.44 SUB TOTAL 68,574.61$ County Mobilization along Major Roads (2%) County Approved Mainteenance of Traffic along Major Roads (5%) TOTAL PROJECT COST 68,574.61$ John J Garcia General Manager Huffman Inc DBA NuWave Concrete Huffman, Inc. / NuWave Concrete SIDEWALKS REPAIRS AT SEVERAL PARKS WINTER SPRINGS CITY 219 PARKS AT WINTER SPRINGS Tripstop 7/2/2025 4'SW Lgth SW With Area of 4"Area of 4"SW Lgth SW With Area of 6"Area of 6" EA LF LF SF SY LF LF SF SY EA CENTRAL WINDS PARK 10 8 80 8.89 43 6 258 28.67 24 6 144 16.00 5 6 30 3.33 19 6 114 12.67 16 17 272 30.22 12 6 72 8.00 0 0.00 7 6 42 4.67 0 0.00 7 6 42 4.67 0 0.00 9 6 54 6.00 0 0.00 11 6 66 7.33 0 0.00 6 6 36 4.00 0 0.00 6 6 36 4.00 0 0.00 10 10 100 11.11 0 0.00 20 12 5 0.56 0 0.00 31 10 310 34.44 0 0.00 10 10 100 11.11 0 0.00 37 6 222 24.67 0 0.00 10 6 60 6.67 0 0.00 16 17 272 30.22 0 0.00 SUBTOTALS CENTRAL WINDS PARK - 1,755.00 195.00 560.00 62.22 SAM SMITH MEMORIAL PARK 127 6 762 84.67 0 0.00 16 11 176 19.56 0 0.00 19 15 285 31.67 0 0.00 20 11 220 24.44 0 0.00 TOTALS SAM SMITH MEMORIAL PARK - 1,443.00 160.33 - - - - TROTWOOD PARK 97 6 582 64.67 0 0.00 38 5 190 21.11 0 0.00 8 6 48 5.33 0 0.00 13 6 78 8.67 0 0.00 18 15 270 30.00 0 0.00 25 6 150 16.67 0 0.00 7 8 56 6.22 0 0.00 157 6 942 104.67 0 0.00 55 5 275 30.56 0 0.00 152 6 912 101.33 0 0.00 TOTALS TROTWOOD PARK - 3,503.00 389.22 - - - - OAK HOLLOW PARK 43 4 172 19.11 0 0.00 38 6 228 25.33 0 0.00 19 6 114 12.67 0 0.00 Sidewalk Repair SEVERAL PARKS AT WINTER SPRINGS 4"6" # of Trees Comments Page 2 of 3 220 PARKS AT WINTER SPRINGS Tripstop 7/2/2025 4'SW Lgth SW With Area of 4"Area of 4"SW Lgth SW With Area of 6"Area of 6" Sidewalk Repair SEVERAL PARKS AT WINTER SPRINGS 4"6" # of Trees Comments 7 6 42 4.67 0 0.00 TOTALS OAK HOLLOW PARK - 556.00 61.78 - - - - WINDING HOLLOW PARK 0 0.00 0 0.00 0 0.00 0 0.00 TOTALS WINDING HOLLOW PARK - - - - - - - - RANCHLANDS PARK 0 0.00 0 0.00 0 0.00 0 0.00 TOTALS RANCHLANDS PARK - - - - - - - - MOSS PARK 50 6 300 33.33 0 0.00 0 0.00 0 0.00 TOTALS RANCHLANDS PARK - 300.00 33.33 - - - - TORCASO PARK 0 0.00 0 0.00 0 0.00 0 0.00 TOTALS TORCASO PARK - - - - - - - - SUNSHINE PARK 70 6 420 46.67 0 0.00 0 0.00 0 0.00 TOTALS SUNSHINE PARK - 420.00 46.67 - - - - 0 0.00 0 0.00 TOTALS - 8,774.70 974.97 616.00 68.44 Page 3 of 3 221 222 223 224 225 226 227 228