Loading...
HomeMy WebLinkAbout2025 06 09 Consent 301 - Fairway Oaks Pond Sediment Removal - Concurrent w/ Inflow Storm Sewer Pipe RepairCONSENT AGENDA ITEM 301 CITY COMMISSION AGENDA | JUNE 9, 2025 REGULAR MEETING TITLE Fairway Oaks Pond Sediment Removal Concurrent with Previously Approved 42-Inch Inflow Storm Sewer Pipe Repair SUMMARY On April 14, 2025, the City Commission approved the bid by Cathcart Construction to repair the existing 42-inch CMP inflow pipe from Oxbow Lane to the stormwater pond within the Fairway Oaks subdivision. Portions of this underground pipeline had become dislodged due to the impacts of Hurricane Milton and required replacement. Over time, sediment from the surrounding failed pipeline eroded and discharged though the outfall pipe into the stormwater pond. This sediment has created a significantly higher than normal build up within the pond that was not readily apparent at the time the pipeline repair bid was presented and approved by the City Commission. This excessive sediment should be removed for the pond to regain its intended function within the Fairway Oaks stormwater system. This bid is a piggyback on the City of Altamonte Contract ITB 23-009-RS. FUNDING SOURCE Stormwater Fund R&M infra within the FY 25 budget. RECOMMENDATION Staff requests the City Commission approve the bid by Cathcart Construction in the amount of $64,100.00 for the removal of sediment from the Oxbow Lane stormwater pond within the Fairway Oaks subdivision. 171 Pay Item No.Descriptions Unit Qty Maximum Unit Price Extended Price 1.01 Mobilization / Demobilization (Not to Exceed 12% of Contract Value) %1 4,650.00$ 4,650.00$ 1.02 Maintenance of Traffic (Not to Exceed 5% of contract Value) % 5.00$ -$ 1.03 Arrow Board / Advance Warning Flashing ED 25.00$ -$ 1.04 Portable Changeable Message Sign ED 55.00$ -$ 1.05 Pre Construction Video of Work Area EA 2,500.00$ -$ 1.06 Utility System Record Drawings EA/1000 LF 1,750.00$ -$ 1.07 FDEP Partial Clearance Testing/Certification Potable Water System EA 2,500.00$ -$ 1.08 FDEP Partial Clearance Testing/Certification Sanitary System EA 1,750.00$ -$ 1.09 FDEP Final Clearance Testing/Certification Potable Water System EA 3,000.00$ -$ 1.10 FDEP Final Clearance Testing/Certification Sanitary System EA 1,750.00$ -$ Subtotal 4,650.00$ 2.01 Sediment Barrier (Silt Fence) LF 250 3.00$ 750.00$ 2.02 Inlet Protection System EA 350.00$ -$ 2.03 Clearing and Grubbing Within the ROW SY 750 18.00$ 13,500.00$ 2.04 Removal of Existing Structure SF 150.00$ -$ 2.05 Removal of Existing Concrete Pavement - Sidewalks & Driveways SY 15.00$ -$ 2.06 Regular Excavation CY 200 30.00$ 6,000.00$ 2.07 Borrow Excavation, Truck Measure Export CY 400 35.00$ 14,000.00$ 2.08 Embankment CY 30.00$ -$ 2.09 Flowable Fill - Excavatable Type CY 450.00$ -$ 2.10 Excavation for Structures CY 25.00$ -$ Subtotal 34,250.00$ 3.01 Utility Pipe, F&I, Water Potable/Reclaimed, 2" PVC DR18 LF 25.00$ -$ 3.02 Utility Pipe, F&I, Water Potable/Reclaimed, 4" PVC DR18 LF 40.00$ -$ 3.03 Utility Pipe, F&I, Water Potable/Reclaimed, 6" PVC DR18 LF 65.00$ -$ 3.04 Utility Pipe, F&I, Water Potable/Reclaimed, 8" PVC DR18 LF 90.00$ -$ 3.05 Utility Pipe, F&I, Water Potable/Reclaimed, 10" PVC DR18 LF 100.00$ -$ 3.06 Utility Pipe, F&I, Water Potable/Reclaimed, 12" PVC DR18 LF 150.00$ -$ 3.07 Utility Pipe, F&I, Water Potable/Reclaimed, 16" PVC DR18 LF 180.00$ -$ 3.08 Utility Pipe, F&I, Water Potable/Reclaimed 4" Directional Drill HDD/HDPE LF 95.00$ -$ 3.09 Utility Pipe, F&I, Water Potable/Reclaimed 6" Directional Drill HDD/HDPE LF 100.00$ -$ 3.10 Utility Pipe, F&I, Water Potable/Reclaimed 8" Directional Drill HDD/HDPE LF 120.00$ -$ 3.11 Utility Pipe, F&I, Water Potable/Reclaimed 10" Directional Drill HDD/HDPE LF 140.00$ -$ 3.12 Utility Pipe, F&I, Water Potable/Reclaimed 12" Directional Drill HDD/HDPE LF 190.00$ -$ 3.13 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, Galv. 0"-2.5" LF 20.00$ -$ 3.14 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 2" LF 20.00$ -$ ITEMIZED BID FORM ITB NO. 23-009-RS CITYWIDE INFRASTRUCTURE POTABLE, SANITARY, RECLAIMED, AND STORMWATER WITH SITE RESTORATION Bidder to complete form and attach to Proposal Bid Form. Enter Base Bid Grand Total on Proposal Bid Form. City of Winter Springs - Oxbow Lane Pond Cleaning 1.00 Mobilization, Traffic Control and Project Documentation 2.00 General Site Work and Site Protection 3.00 Water Main Potable/Reclaimed (Including fittings, pipe, materials and restoration) 172 3.15 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 4" LF 25.00$ -$ 3.16 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 6" LF 30.00$ -$ 3.17 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 8" LF 35.00$ -$ 3.18 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 10" LF 40.00$ -$ 3.19 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 12" LF 40.00$ -$ 3.20 Utility Pipe, Water Potable/Reclaimed, Remove/Dispose, 16" LF 50.00$ -$ 3.21 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 0"-1.9" LF 15.00$ -$ 3.22 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 2" LF 15.00$ -$ 3.23 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 4" LF 15.00$ -$ 3.24 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 6" LF 25.00$ -$ 3.25 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 8" LF 25.00$ -$ 3.26 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 10" LF 25.00$ -$ 3.27 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 12" LF 25.00$ -$ 3.28 Utility Pipe, Water Potable/Reclaimed, Plug & Out of Service, 16" LF 35.00$ -$ 3.29 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 2" EA 150.00$ -$ 3.30 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 4" EA 400.00$ -$ 3.31 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 6" EA 500.00$ -$ 3.32 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 8" EA 800.00$ -$ 3.33 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 10" EA 1,200.00$ -$ 3.34 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 12" EA 1,400.00$ -$ 3.35 Utility Pipe, Elbow Potable/Reclaimed, 45 or 90, F&I, 16" EA 3,400.00$ -$ 3.36 Utility Pipe, Existing Valve Box Adjust to Grade with Concrete Collar EA 450.00$ -$ Subtotal -$ 5.01 Utility Fixture, F&I, Water, Meter and Meter Box on 0"-1.9" WM EA 850.00$ -$ 5.02 Utility Fixture, F&I, Water, Backflow Assembly on 0"-1.9" WM EA 1,100.00$ -$ 5.03 Utility Fixture, F&I, Water, Saddle on 0"-1.9" WM EA 200.00$ -$ 5.04 Utility Fixture, F&I, Water, Gate Valve Assembly on 0"-1.9" WM EA 500.00$ -$ 5.05 Utility Fixture, F&I, Water, Meter and Meter Box on 2" WM EA 900.00$ -$ 5.06 Utility Fixture, F&I, Water, Saddle on 2" WM EA 250.00$ -$ 5.07 Utility Fixture, F&I, Water, Gate Valve Assembly on 2" WM EA 800.00$ -$ 5.08 Utility Fixture, F&I, Water, Line Stop Assembly on 2" WM EA 4,000.00$ -$ 5.09 Utility Fixture, F&I, Water, Mech Joint Restraint on 2" WM EA 100.00$ -$ 5.10 Utility Fixture, F&I, Water, Meter and Meter Box on 4" WM EA 1,500.00$ -$ 5.11 Utility Fixture, F&I, Water, Saddle on 4" WM EA 750.00$ -$ 5.12 Utility Fixture, F&I, Water, Gate Valve Assembly on 4" WM EA 2,000.00$ -$ 5.13 Utility Fixture, F&I, Water, Line Stop Assembly on 4" WM EA 6,000.00$ -$ 5.14 Utility Fixture, F&I, Water, Mech Joint Restraint on 4" WM EA 250.00$ -$ 5.15 Utility Fixture, F&I, Water, Meter and Meter Box on 6" WM EA 1,500.00$ -$ 5.16 Utility Fixture, F&I, Water, Saddle on 6" WM EA 750.00$ -$ 5.17 Utility Fixture, F&I, Water, Gate Valve Assembly on 6" WM EA 2,400.00$ -$ 5.18 Utility Fixture, F&I, Water, Line Stop Assembly on 6" WM EA 7,000.00$ -$ 5.19 Utility Fixture, F&I, Water, Mech Joint Restraint on 6" WM EA 350.00$ -$ 5.20 Utility Fixture, F&I, Water, Meter and Meter Box on 8" WM EA 1,500.00$ -$ 5.21 Utility Fixture, F&I, Water, Saddle on 8" WM EA 850.00$ -$ 5.22 Utility Fixture, F&I, Water, Gate Valve Assembly on 8" WM EA 3,300.00$ -$ 5.23 Utility Fixture, F&I, Water, Line Stop Assembly on 8" WM EA 9,000.00$ -$ 5.24 Utility Fixture, F&I, Water, Mech Joint Restraint on 8" WM EA 400.00$ -$ 5.25 Utility Fixture, F&I, Water, Meter and Meter Box on 10" WM EA 1,500.00$ -$ 5.26 Utility Fixture, F&I, Water, Saddle on 10" WM EA 950.00$ -$ 5.27 Utility Fixture, F&I, Water, Gate Valve Assembly on 10" WM EA 5,500.00$ -$ 5.28 Utility Fixture, F&I, Water, Line Stop Assembly on 10" WM EA 14,000.00$ -$ 5.29 Utility Fixture, F&I, Water, Mech Joint Restraint on 10" WM EA 500.00$ -$ 5.30 Utility Fixture, F&I, Water, Meter and Meter Box on 12" WM EA 1,500.00$ -$ 5.31 Utility Fixture, F&I, Water, Saddle on 12" WM EA 1,200.00$ -$ 5.32 Utility Fixture, F&I, Water, Gate Valve Assembly on 12" WM EA 7,000.00$ -$ 5.33 Utility Fixture, F&I, Water, Line Stop Assembly on 12" WM EA 15,000.00$ -$ 5.34 Utility Fixture, F&I, Water, Mech Joint Restraint on 12" WM EA 550.00$ -$ 5.35 Utility Fixture, F&I, Water, Meter and Meter Box on 16" WM EA 2,500.00$ -$ 5.36 Utility Fixture, F&I, Water, Saddle on 16" WM EA 1,400.00$ -$ 5.37 Utility Fixture, F&I, Water, Gate Valve Assembly on 16" WM EA 12,500.00$ -$ 5.38 Utility Fixture, F&I, Water, Line Stop Assembly on 16" WM EA 21,000.00$ -$ 5.39 Utility Fixture, F&I, Water, Mech Joint Restraint on 16" WM EA 1,200.00$ -$ 5.40 Utility Fixture, F&I, 1” Single Short Water Service on 0"-2" EA 800.00$ -$ 5.41 Utility Fixture, F&I, 1” Single Long Water Service on 0"-2" EA 2,000.00$ -$ 5.42 Utility Fixture, F&I, 1.5” Double Short Water Service on 0"-2" EA 800.00$ -$ 5.43 Utility Fixture, F&I, 1.5” Double Long Water Service on 0"-2" EA 2,000.00$ -$ 5.44 Utility Fixture, F&I, 1” Single Short Water Service on 3" EA 800.00$ -$ 5.45 Utility Fixture, F&I, 1” Single Long Water Service on 3" EA 2,000.00$ -$ 5.00 Utility - Water Services (Including fittings, pipe, materials and restoration) 173 5.46 Utility Fixture, F&I, 1.5” Double Short Water Service on 3" EA 800.00$ -$ 5.47 Utility Fixture, F&I, 1.5” Double Long Water Service on 3" EA 2,000.00$ -$ 5.48 Utility Fixture, F&I, 1” Single Short Water Service on 4" EA 850.00$ -$ 5.49 Utility Fixture, F&I, 1” Single Long Water Service on 4" EA 2,050.00$ -$ 5.50 Utility Fixture, F&I, 1.5” Double Short Water Service on 4" EA 1,400.00$ -$ 5.51 Utility Fixture, F&I, 1.5” Double Long Water Service on 4" EA 2,400.00$ -$ 5.52 Utility Fixture, F&I, 1” Single Short Water Service on 6" EA 900.00$ -$ 5.53 Utility Fixture, F&I, 1” Single Long Water Service on 6" EA 2,100.00$ -$ 5.54 Utility Fixture, F&I, 1.5” Double Short Water Service on 6" EA 1,400.00$ -$ 5.55 Utility Fixture, F&I, 1.5” Double Long Water Service on 6" EA 2,400.00$ -$ 5.56 Utility Fixture, F&I, 1” Single Short Water Service on 8" EA 950.00$ -$ 5.57 Utility Fixture, F&I, 1” Single Long Water Service on 8" EA 2,200.00$ -$ 5.58 Utility Fixture, F&I, 1.5” Double Short Water Service on 8" EA 1,700.00$ -$ 5.59 Utility Fixture, F&I, 1.5” Double Long Water Service on 8" EA 2,700.00$ -$ 5.60 Utility Fixture, F&I, 1” Single Short Water Service on 10" EA 1,000.00$ -$ 5.61 Utility Fixture, F&I, 1” Single Long Water Service on 10" EA 2,300.00$ -$ 5.62 Utility Fixture, F&I, 1.5” Double Short Water Service on 10" EA 1,700.00$ -$ 5.63 Utility Fixture, F&I, 1.5” Double Long Water Service on 10" EA 2,700.00$ -$ 5.64 Utility Fixture, F&I, 1” Single Short Water Service on 12" EA 1,000.00$ -$ 5.65 Utility Fixture, F&I, 1” Single Long Water Service on 12" EA 2,300.00$ -$ 5.66 Utility Fixture, F&I, 1.5” Double Short Water Service on 12" EA 1,700.00$ -$ 5.67 Utility Fixture, F&I, 1.5” Double Long Water Service on 12" EA 2,700.00$ -$ 5.68 Utility Fixture, F&I, Single Meter Box EA 850.00$ -$ 5.69 Utility Fixture, F&I, Double Meter Box EA 1,500.00$ -$ 5.70 Utility Fixture, F&I, 2" Blow-off Assembly Complete w/Box AS 2,400.00$ -$ 5.71 Utility Fixture, Existing Meter Box Adjust to Grade EA 550.00$ -$ Subtotal -$ 6.01 Fire Hydrant Assembly, Standard 3 Way, F&I, 6” Unit EA 8,000.00$ -$ 6.02 Fire Hydrant, Existing, Adjust & Modify EA 4,000.00$ -$ 6.03 Fire Hydrant Relocate Existing EA 4,000.00$ -$ 6.04 Fire Hydrant Remove EA 2,500.00$ -$ 6.05 FH Assembly Connection Fitting - 6" x 6" x 6" MJ Tee - FH to Main Line Only EA 1,500.00$ -$ 6.06 FH Assembly Connection Fitting - 8" x 8" x 6" MJ Tee - FH to Main Line Only EA 2,000.00$ -$ 6.07 FH Assembly Connection Fitting - 10" x 10" x 6" MJ Tee - FH to Main Line Only EA 2,500.00$ -$ 6.08 FH Assembly Connection Fitting - 12" x 12" x 6" MJ Tee - FH to Main Line Only EA 3,500.00$ -$ 6.09 FH Assembly Connection Fitting - 6" MJ 90° Elbow - FH to Main Line Only EA 350.00$ -$ 6.10 FH Assembly Connection Fitting - 8" MJ 90° Elbow - FH to Main line Only EA 450.00$ -$ 6.11 FH Assembly Connection Fitting - 10" MJ 90° Elbow - FH to Main line Only EA 650.00$ -$ 6.12 FH Assembly Connection Fitting - 12" MJ 90° Elbow - FH to Main line Only EA 750.00$ -$ Subtotal -$ 7.01 Utility Pipe, F&I, Sewer Gravity, 6" PVC DR25 *(for Services and Laterals Only) LF 200.00$ -$ 7.02 Utility Pipe, F&I, Sewer Gravity, 8" PVC DR25 LF 275.00$ -$ 7.03 Utility Pipe, F&I, Sewer Gravity, 10" PVC DR25 LF 300.00$ -$ 7.04 Utility Pipe, F&I, Sewer Gravity, 12" PVC DR25 LF 350.00$ -$ 7.05 Utility Pipe, F&I, Sewer Gravity, 14" PVC DR25 LF 350.00$ -$ 7.06 Utility Pipe, F&I, Sewer Gravity, 16" PVC DR25 LF 500.00$ -$ 7.07 Utility Pipe, F&I, Sewer Gravity, 18" PVC DR25 LF 600.00$ -$ 7.08 Utility Pipe, F&I, Sewer Gravity, 20" PVC DR25 LF 750.00$ -$ 7.09 Utility Pipe, F&I, Sewer Gravity, 24" PVC DR25 LF 800.00$ -$ 7.10 Utility Pipe, F&I, Sewer Forcemain, 6" PVC DR18 LF 55.00$ -$ 7.11 Utility Pipe, F&I, Sewer Forcemain, 8" PVC DR18 LF 85.00$ -$ 7.12 Utility Pipe, F&I, Sewer Forcemain, 10" PVC DR18 LF 125.00$ -$ 7.13 Utility Pipe, F&I, Sewer Forcemain, 12" PVC DR18 LF 175.00$ -$ 7.14 Utility Pipe, F&I, Sewer Forcemain, 16" PVC DR18 LF 250.00$ -$ 7.15 Utility Pipe, F&I, Sewer Forcemain, 8" DIP LF 175.00$ -$ 7.16 Utility Pipe, F&I, Sewer Forcemain, 10" DIP LF 210.00$ -$ 7.17 Utility Pipe, F&I, Sewer Forcemain, 12" DIP LF 240.00$ -$ 7.18 Utility Pipe, F&I, Sewer Forcemain, 16" DIP LF 300.00$ -$ 7.19 Utility Pipe, Sewer, Remove/Dispose, 6" LF 30.00$ -$ 7.20 Utility Pipe, Sewer, Remove/Dispose, 8" LF 35.00$ -$ 7.21 Utility Pipe, Sewer, Remove/Dispose, 10" LF 40.00$ -$ 7.22 Utility Pipe, Sewer, Remove/Dispose, 12" LF 40.00$ -$ 7.23 Utility Pipe, Sewer, Remove/Dispose, 16" LF 50.00$ -$ 7.24 Utility Pipe, Cure-In-Place, Sewer, Existing Clay, 6" LF 120.00$ -$ 7.25 Utility Pipe, Cure-In-Place, Sewer, Existing Clay, 8" LF 140.00$ -$ 7.00 Utility - Sewer Service (Including fittings, pipe, materials and restoration) 6.00 Fire Hydrants 174 7.26 Utility Pipe, Cure-In-Place, Sewer, Existing Clay, 10" LF 160.00$ -$ 7.27 Utility Pipe, Cure-In-Place, Sewer, Existing Clay, 12" LF 180.00$ -$ 7.28 Utility Fixture, F&I, 6” Sewer Service Fitting to 6" Gravity Main EA 600.00$ -$ 7.29 Utility Fixture, F&I, 6” Sewer Service Fitting to 8" Gravity Main EA 750.00$ -$ 7.30 Utility Fixture, F&I, 6” Sewer Service Fitting to 10" Gravity Main EA 750.00$ -$ 7.31 Utility Fixture, F&I, 6” Sewer Service Fitting to 11" to 12" Gravity Main EA 850.00$ -$ 7.32 Utility Fixture, F&I, 6” Sewer Service Fitting to 13" to 14" Gravity Main EA 850.00$ -$ 7.33 Utility Fixture, F&I, 6” Sewer Service Fitting to 15" to 16" Gravity Main EA 1,500.00$ -$ 7.34 Utility Fixture, F&I, 6” Sewer Service Fitting to 17" to 18" Gravity Main EA 2,000.00$ -$ 7.35 Utility Fixture, F&I, 6” Sewer Service Fitting to 20" to 21" Gravity Main EA 2,500.00$ -$ 7.36 Utility Fixture, F&I, 6” Sewer Service Fitting to 22" to 24" Gravity Main EA 3,000.00$ -$ 7.37 Utility Fixture, F&I, 4” Cleanout Sewer EA 550.00$ -$ 7.38 Utility Fixture, F&I, 6” Cleanout Sewer EA 650.00$ -$ 7.39 Lining of Existing Sewer Manhole EA 7,000.00$ -$ 7.40 Sewer Manhole Complete EA 12,000.00$ -$ 7.41 Connect to Existing Sewer Manhole EA 2,500.00$ -$ Subtotal -$ 8.01 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 0"-1.9" EA 850.00$ -$ 8.02 Utility Fixture, F&I, Reclaimed, Backflow Assembly on 0"-1.9" EA 1,100.00$ -$ 8.03 Utility Fixture, F&I, Reclaimed, Saddle on 0"-1.9" EA 200.00$ -$ 8.04 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 0"-1.9" EA 500.00$ -$ 8.05 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 2" EA 900.00$ -$ 8.06 Utility Fixture, F&I, Reclaimed, Backflow Assembly on 2" EA 1,100.00$ -$ 8.07 Utility Fixture, F&I, Reclaimed, Saddle on 2" EA 250.00$ -$ 8.08 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 2" EA 800.00$ -$ 8.09 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 2" EA 4,000.00$ -$ 8.10 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 2" EA 100.00$ -$ 8.11 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 4" EA 1,500.00$ -$ 8.12 Utility Fixture, F&I, Reclaimed, Saddle on 4" EA 750.00$ -$ 8.13 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 4" EA 2,000.00$ -$ 8.14 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 4" EA 6,000.00$ -$ 8.15 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 4" EA 250.00$ -$ 8.16 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 6" EA 1,500.00$ -$ 8.17 Utility Fixture, F&I, Reclaimed, Saddle on 6" EA 750.00$ -$ 8.18 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 6" EA 2,400.00$ -$ 8.19 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 6" EA 7,000.00$ -$ 8.20 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 6" EA 350.00$ -$ 8.21 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 8" EA 1,500.00$ -$ 8.22 Utility Fixture, F&I, Reclaimed, Saddle on 8" EA 850.00$ -$ 8.23 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 8" EA 3,300.00$ -$ 8.24 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 8" EA 9,000.00$ -$ 8.25 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 8" EA 400.00$ -$ 8.26 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 10" EA 1,500.00$ -$ 8.27 Utility Fixture, F&I, Reclaimed, Saddle on 10" EA 950.00$ -$ 8.28 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 10" EA 5,500.00$ -$ 8.29 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 10" EA 14,000.00$ -$ 8.30 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 10" EA 500.00$ -$ 8.31 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 12" EA 1,500.00$ -$ 8.32 Utility Fixture, F&I, Reclaimed, Saddle on 12" EA 1,200.00$ -$ 8.33 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 12" EA 7,000.00$ -$ 8.34 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 12" EA 15,000.00$ -$ 8.35 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 12" EA 550.00$ -$ 8.36 Utility Fixture, F&I, Reclaimed, Meter and Meter Box on 16" EA 2,500.00$ -$ 8.37 Utility Fixture, F&I, Reclaimed, Saddle on 16" EA 1,400.00$ -$ 8.38 Utility Fixture, F&I, Reclaimed, Gate Valve Assembly on 16" EA 12,500.00$ -$ 8.39 Utility Fixture, F&I, Reclaimed, Line Stop Assembly on 16" EA 21,000.00$ -$ 8.40 Utility Fixture, F&I, Reclaimed, Mech Joint Restraint on 16" EA 1,200.00$ -$ 8.41 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 0"-2" EA 800.00$ -$ 8.42 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 0"-2" EA 2,000.00$ -$ 8.43 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 0"-2" EA 800.00$ -$ 8.44 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 0"-2" EA 2,000.00$ -$ 8.45 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 3" EA 800.00$ -$ 8.46 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 3" EA 2,000.00$ -$ 8.47 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 3" EA 1,200.00$ -$ 8.48 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 3" EA 2,200.00$ -$ 8.49 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 4" EA 850.00$ -$ 8.50 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 4" EA 2,050.00$ -$ 8.51 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 4" EA 1,400.00$ -$ 8.00 Reclaimed Water Service (Including fittings, pipe, materials and restoration) 175 8.52 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 4" EA 2,400.00$ -$ 8.53 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 6" EA 900.00$ -$ 8.54 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 6" EA 2,100.00$ -$ 8.55 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 6" EA 1,400.00$ -$ 8.56 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 6" EA 2,400.00$ -$ 8.57 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 8" EA 950.00$ -$ 8.58 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 8" EA 2,200.00$ -$ 8.59 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 8" EA 1,700.00$ -$ 8.60 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 8" EA 2,700.00$ -$ 8.61 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 10" EA 1,000.00$ -$ 8.62 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 10" EA 2,300.00$ -$ 8.63 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 10" EA 1,700.00$ -$ 8.64 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 10" EA 2,700.00$ -$ 8.65 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 12" EA 1,000.00$ -$ 8.66 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 12" EA 2,300.00$ -$ 8.67 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 12" EA 1,700.00$ -$ 8.68 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 12" EA 2,700.00$ -$ 8.69 Utility Fixture, F&I, 1” Single Short Reclaimed Service on 16" EA 1,400.00$ -$ 8.70 Utility Fixture, F&I, 1” Single Long Reclaimed Service on 16" EA 2,400.00$ -$ 8.71 Utility Fixture, F&I, 1.5” Double Short Reclaimed Service on 16" EA 2,200.00$ -$ 8.72 Utility Fixture, F&I, 1.5” Double Long Reclaimed Service on 16" EA 3,200.00$ -$ 8.73 Utility Fixture, Meter Relocate and Adjust Box EA 550.00$ -$ 8.74 Utility Fixture, F&I, Single Reclaimed Meter Box EA 850.00$ -$ 8.75 Utility Fixture, F&I, Double Reclaimed Meter Box EA 1,500.00$ -$ Subtotal -$ 9.01 Pavers Architectural Roadway, F&I, Includes Base & Joint Sand SY 150.00$ -$ 9.02 Pavers Architectural Sidewalk, F&I, Includes Base & Joint Sand SY 140.00$ -$ 9.03 Concrete Class II, Approach Slabs CY 350.00$ -$ 9.04 Clearing & Grubbing for Pavers SY 18.00$ -$ 9.05 Paver Bendable Drain Pipe 4", F&I, w/Aggregate LF 8.00$ -$ 9.06 Paver Drain Clean-out 4", F&I EA 125.00$ -$ 9.07 Steel Vehicular Plates, Temp., F&I 8' W x 20' L x 1" thick EA 1,750.00$ -$ Subtotal -$ 10.01 Concrete Curb & Gutter, Type F (Parent of Drop Curb)LF 55.00$ -$ 10.02 Concrete Curb & Gutter, Type A LF 45.00$ -$ 10.03 Concrete Curb & Gutter, Type B LF 45.00$ -$ 10.04 Concrete Curb & Gutter, Type D LF 50.00$ -$ 10.05 Concrete Curb & Gutter, Type E LF 50.00$ -$ 10.06 Concrete Drop Curb, FDOT LF 50.00$ -$ 10.07 Concrete Ribbon Curb 12" Width LF 45.00$ -$ 10.08 Concrete Valley Gutter LF 70.00$ -$ 10.09 Sidewalk Concrete, 4" Thick SY 65.00$ -$ 10.10 Special Sidewalk Finish - Trowel Edge Alternating Broom Fields SY 5.00$ -$ 10.11 Single Direction Detectable Warning Mat (New)EA 150.00$ -$ 10.12 Dual Direction Detectable Warning (New)Mat EA 300.00$ -$ 10.13 Sidewalk/Pavement Concrete, 6" Thick SY 90.00$ -$ 10.14 Driveway Apron Concrete, 6" Thick SY 90.00$ -$ 10.15 Detectable Warning Mat on Existing Walking Surface EA 150.00$ -$ 10.16 Concrete Class NS, Gravity Wall CY 600.00$ -$ 10.17 Concrete Traffic Separator, Special - Variable Width SY 130.00$ -$ 10.18 Concrete Barrier Wall, Removal LF 50.00$ -$ 10.19 Concrete Traffic Railing Barrier, with Junction Slab, 42" 'F' Shape LF 275.00$ -$ 10.20 Concrete Surface, Class V Bridge Treatment, Prep & Apply SF 4.00$ -$ 10.21 Pressure Wash Existing Curb & Gutter, Sidewalks, & Driveways SF 1.00$ -$ Subtotal -$ 11.01 Stabilization Type B (per City Detail) SY 15.00$ -$ 11.02 Optional Base Group 06 or 8" Limerock (per City Detail) SY 75.00$ -$ 11.03 Tack and Sand Optional Base or Limerock (Per FDOT Spec) SY 1.50$ -$ 11.04 Asphalt Patching (per City Detail) SY 150.00$ -$ 11.05 Milling Existing Asphalt Pav't. 1.25" Average Depth SY 7.00$ -$ 11.06 Milling Existing Asphalt Pav't. 1.50" Average Depth SY 8.00$ -$ 11.07 SuperPave Asphaltic Concrete, Traffic 'B' SP9.5 at 1.25" Depth TN 300.00$ -$ 11.08 SuperPave Asphaltic Concrete, Traffic 'B' SP12.5 at 1.50" Depth TN 300.00$ -$ 9.00 Brick Paver Features (Includes demolition, sub-base, concrete, brick, and asphalt restoration work) 10.00 Concrete Work 11.00 Pavement Restoration (Refer to Section 02010) 176 11.09 Reinforced Concrete Pavement 8" Depth SY 175.00$ -$ 11.10 Traffic Signal Loop Assembly, F&I Type 'F' AS 2,800.00$ -$ 11.11 Retro-Reflective Pavement Markers EA 7.00$ -$ 11.12 Thermoplastic Pavement Marking, Standard, White, Solid, 6" LF 5.00$ -$ 11.13 Thermoplastic Pavement Marking, Standard, White, Solid, 8" LF 8.00$ -$ 11.14 Thermoplastic Pavement Marking, Standard, White, Solid, 12" LF 10.00$ -$ 11.15 Thermoplastic Pavement Marking, Standard, White, Solid, 18" for Diagonals and Chevrons LF 15.00$ -$ 11.16 Thermoplastic Pavement Marking, Standard, White, Solid, 24" For 'Stop' line and Crosswalks LF 18.00$ -$ 11.17 Thermoplastic Pavement Marking, Standard, White, Message or Symbol EA 150.00$ -$ 11.18 Thermoplastic Pavement Marking, Standard, White, Arrows EA 125.00$ -$ 11.19 Thermoplastic Pavement Marking, Standard, Yellow, Solid, 6" LF 7.00$ -$ 11.20 Thermoplastic Pavement Marking, Standard, Yellow, Solid, 12" LF 10.00$ -$ 11.21 Thermoplastic Pavement Marking, Standard, Yellow, Solid, 18" for Diagonals and Chevrons LF 15.00$ -$ 11.22 Permanent Concrete Pavement Stripe Paint, Standard, White, 24" Width LF 18.00$ -$ 11.23 Temporary Asphalt Paint - Pre-Thermoplastic LS 4,500.00$ -$ Subtotal -$ 12.01 Curb Inlet Complete, F&I - Type P, 4' Diameter Round, Type 1 Top, 6' OAH EA 6,500.00$ -$ 12.02 Curb Inlet Complete, F&I - Type P, 4' Diameter Round, Type 2 Top, 6' OAH EA 6,500.00$ -$ 12.03 Curb Inlet Complete, F&I - Type J, 5' Diameter Round, Type 1 Top, 6' OAH EA 8,500.00$ -$ 12.04 Curb Inlet Complete, F&I - Type J, 5' Diameter Round, Type 2 Top, 6' OAH EA 8,500.00$ -$ 12.05 Curb Inlet Complete, F&I - Type J, 5' Diameter Round, Type 4 Top, 6' OAH EA 8,500.00$ -$ 12.06 Curb Inlet Complete, F&I - Type P, 4' Diameter Round, Type 5 Top, 6' OAH EA 6,000.00$ -$ 12.07 Curb Inlet Complete, F&I - Type P, 4' Diameter Round, Type 6 Top, 6' OAH EA 6,000.00$ -$ 12.08 Curb Inlet Complete, F&I - Type J, 5' Diameter Round, Type 5 Top, 6' OAH EA 9,000.00$ -$ 12.09 Curb Inlet Complete, F&I - Type J, 5' Diameter Round, Type 6 Top, 6' OAH EA 9,000.00$ -$ 12.10 Curb Inlet Complete, F&I - Type J, 5' Diameter Round Dog House, Type 9, 6' OAH EA 11,000.00$ -$ 12.11 Curb Inlet Complete, F&I - Type J, 5' Diameter Round, Type 9, 6' OAH EA 10,000.00$ -$ 12.12 Ditch Bottom Inlet, F&I -Type D, 5' Square, 4' OAH EA 6,000.00$ -$ 12.13 USF 5100 Valley Gutter Inlet Frame and 6147 Grate (or Equiv.) EA 6,500.00$ -$ 12.14 USF 4105 Drop/Gutter Type V, Modified Inlet Frame and 6220 Grate (or Equiv.) EA 7,000.00$ -$ 12.15 Manhole Complete, F&I - Type P, 4' Dia. Round, Type 8 Top, 6' OAH EA 9,000.00$ -$ 12.16 Manhole Adjust to Grade Existing EA 1,750.00$ -$ 12.17 Manhole Top, F&I, City Standard EA 3,250.00$ -$ 12.18 Pipe Culvert, F&I, RCP, Round, 15" LF 150.00$ -$ 12.19 Pipe Culvert, F&I, RCP, Round, 18" LF 175.00$ -$ 12.20 Pipe Culvert, F&I, RCP, Round, 24" LF 250.00$ -$ 12.21 Pipe Culvert, F&I, RCP, Round, 30" LF 300.00$ -$ 12.22 Pipe Culvert, F&I, RCP, Round, 36" LF 350.00$ -$ 12.23 Pipe Culvert, F&I, RCP, Round, 42" LF 450.00$ -$ 12.24 Pipe Culvert, F&I, RCP, Round, 48" LF 575.00$ -$ 12.25 Pipe Culvert, F&I, RCPE, Elliptical 19" x 30" LF 265.00$ -$ 12.26 Pipe Culvert, F&I, RCPE, Elliptical 12" x 18" LF 195.00$ -$ 12.27 Pipe Culvert, F&I, RCPE, Elliptical 14" x 23" LF 170.00$ -$ 12.28 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 15" LF 90.00$ -$ 12.29 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 18" LF 100.00$ -$ 12.30 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 24" LF 125.00$ -$ 12.31 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 30" LF 150.00$ -$ 12.32 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 36" LF 225.00$ -$ 12.33 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 42" LF 290.00$ -$ 12.34 Cure-in-Place, Pipe Culvert, F&I, CMP or RCP, Round, 48" LF 308.00$ -$ 12.35 Mitered End Section Complete, F&I, RCP, Round, 15" Pipe EA 3,000.00$ -$ 12.36 Mitered End Section Complete, F&I, RCP, Round, 18" Pipe EA 3,200.00$ -$ 12.37 Mitered End Section Complete, F&I, RCP, Round, 24" Pipe EA 3,600.00$ -$ 12.38 Mitered End Section Complete, F&I, RCP, Round, 30" Pipe EA 4,000.00$ -$ 12.39 Mitered End Section Complete, F&I, RCP, Round, 36" Pipe EA 4,500.00$ -$ 12.40 Mitered End Section Complete, F&I, RCP, Round, 42" Pipe EA 6,000.00$ -$ 12.41 Mitered End Section Complete, F&I, RCP, Round, 48" Pipe EA 8,000.00$ -$ 12.42 Concrete Inlet, Ditch Bottom, Type F, <10, w/Grate EA 5,500.00$ -$ 12.43 Concrete Inlet, Ditch Bottom, Type C, <10, w/Grate EA 5,000.00$ -$ 12.44 Inlets, Median Barrier, Type 1, <10’ EA 5,500.00$ -$ 12.45 Inlets, Closed Flume EA 4,400.00$ -$ 12.46 Concrete Pipe Jacket (FDOT Stnd Plan 430-001) EA 2,500.00$ -$ 12.47 French Drain, F&I, 15" Pipe, w/Wrapped Stone LF 225.00$ -$ 12.48 Pipe Repair Clamp SP EA 7,500.00$ -$ Subtotal -$ 12.00 Stormwater Improvements and Restoration (Refer to Section 02010) 177 13.01 Performance Turf (Sod) SY 750 6.00$ 4,500.00$ 13.02 Landscape Plants Small Groundcover, 1 Gallon EA 10.00$ -$ 13.03 Landscape Plants Small Shrub, 1 Gallon EA 20.00$ -$ 13.04 Landscape Plants Large Shrub, 3 Gallon EA 35.00$ -$ 13.05 Landscape Plants Large Trees, 65 Gallon EA 1,100.00$ -$ 13.06 Landscape Plants Large Palms. 12' OAH EA 950.00$ -$ 13.07 Mailbox Replacement EA 350.00$ -$ 13.08 Irrigation System (Per Plan) EA 2,500.00$ -$ 13.09 Irrigation System Repairs EA 1,750.00$ -$ 13.10 Decorative Street Sign Posts EA 1,750.00$ -$ 13.11 Single Decorative Post Sign, Relocate Existing EA 750.00$ -$ 13.12 Irrigation Bores 2” Diameter EA 3,500.00$ -$ 13.13 Irrigation Bores 4” Diameter EA 4,500.00$ -$ 13.14 Irrigation Bores 6” Diameter EA 6,500.00$ -$ 13.15 Aluminum Handrail, Bicycle-Pedestrian, 48" Height Powder Coated 'Black Gloss' (refer to FDOT Index 515-062)LF 225.00$ -$ 13.16 Aluminum Handrail Repair - Existing LF 150.00$ -$ 13.17 Steel Handrail Repair - Existing LF 175.00$ -$ 13.18 Standard Traffic Guardrail-Roadway, General TL-2, 31" Height LF 45.00$ -$ 13.19 Standard Traffic Guardrail Removal LF 30.00$ -$ 13.20 Guardrail End Anchorage Assembly-Flared AS 2,500.00$ -$ 13.21 Guardrail End Anchorage Assembly-Parallel AS 3,000.00$ -$ 13.22 Standard Traffic Guardrail, Field Painted (Pro.Ind.Alkyd Urethane & Primer) LF 40.00$ -$ 13.23 Reflectors Barrier Wall or Guardrail Mounted, Yellow LF 75.00$ -$ 13.24 Fence, Chain Link, Type B, Standard 6' LF 60.00$ -$ 13.25 Fence Gate, Chain Link, Type B, Standard, Single 3' to 6' Opening EA 1,500.00$ -$ 13.26 Fence Gate, Chain Link, Type B, Standard Double 8' to 12' Opening EA 4,500.00$ -$ 13.27 Fence, Chain Link, Type B, Standard 6' Black Vinyl Clad LF 75.00$ -$ 13.28 Fence Gate, Chain Link, Type B, Standard Single 3'to 6' Opening Black Vinyl Clad EA 1,800.00$ -$ 13.29 Fence Gate, Chain Link, Type B, Stnd. Double 8' to 12' Opening Black Vinyl Clad EA 5,500.00$ -$ 13.30 Electrical - Project Specific Only EA 25,000.00$ -$ 13.31 Out of Scope Item (Not to Exceed 10% of Total Work Order Assignment)LS No Bid Item 13.32 Long Reach Excavator Delivery LS 1 1,400.00$ 1,400.00$ 13.33 Long Reach Excavator Pick Up LS 1 1,400.00$ 1,400.00$ 13.34 Long Reach Excavator Rental LS 1 2,825.00$ 2,825.00$ 13.35 Long Reach Excavator Fuel Gallons 150 6.50$ 975.00$ 13.36 Floating Turbididty Barrier LF 120 15.00$ 1,800.00$ 13.39 Install Stabilized Access For Dump Truck - Labor LS 1 2,500.00$ 2,500.00$ 13.40 Remove Stabilized Access For Dump Truck - Labor LS 1 2,500.00$ 2,500.00$ 13.41 Stabilized Access Material TN 50 50.00$ 2,500.00$ 13.42 Vibration Monitoring Devices DYS 4 600.00$ 2,400.00$ 13.43 Virbration Monitoring Technicians & Reports DYS 4 600.00$ 2,400.00$ Subtotal 25,200.00$ 64,100.00$ Bidder's Signature, Company Name, and Date Total - Base Bid A 13.00 Landscape Enhancements & Site Restorations 178