HomeMy WebLinkAbout2025 06 18 - Presentation 1 - Utility CIP WorkshopUTILITIES CAPITAL
INFRASTRUCTURE
PROGRAM
June 18, 2025
Introductions
•City of Winter Springs
•Clete Saunier, P.E., Director of Public Works and Utilities
•Kimley-Horn and Associates, Inc. (Engineering Consultant)
•Julia Felter, P.E. Project Manager and Project Engineer
•Carollo Engineers (Engineering Consultant)
•Scott Richards, P.E., Project Manager
•Meera McKie, P.E., Project Engineer
•Wharton-Smith, Inc. (Contractor/ CMAR)
•Erik Anderson, P.E., CMAR Project Manager
Agenda
9:30 – 10:15 AM
1. Introductions
2.What is a Capital Improvement Plan (CIP)?
3.Fiscal Year 2025 Active Projects
4.Water priority projects
5.Wastewater priority projects
6.Reclaimed water system priority projects
7.Proposed Five-Year CIP (FY 2026-2030) Budget
8.Funding Impacts
10:15-11:00 AM
9. Questions
11:00 AM – 12:00 PM
10. Update to Design and Construction Services for the East & West Reclamation Facilities
What is a Capital Improvement Plan?
•A Capital Improvement Plan (CIP) is a multi-year plan to identify, prioritize, and
budget for major infrastructure projects.
•A CIP is long-term planning tool that regularly evaluates projects and establishes
priority construction scheduling based on urgency, public need, public benefit,
and allocation of funding.
•An estimated project cost includes data collection, land acquisition (if needed),
engineering services, and construction.
•The estimated project costs are reflected in the CIP and then utilized in the
budget development process.
Fiscal Year 2025 Active Projects
Project Name Completion Date Community Benefits
WTP #3 Generator August 2025 Reliable secondary power to critical infrastructure
LS 7W Replacement Construction December 2025 New pumps, piping and controls for reliably operations, safer
operating environment
Michael Blake Reclaimed Water Main
Extension Design
May 2025 Off-set potable water consumption by 50,000 gpd
Potable Water Main Inventory and
Replacement Plan
June 2025 Reduce number of main breaks, increase quality of water to
residents
Lift Station SCADA Improvements TBD Upgrades to system communications and monitoring for
improved response to emergencies
Lead and Copper Inventory July 2025 Regulatory compliance, identify pipes to reduce lead exposure in
water supply system
West WRF Valve Replacement July 2025 Regulatory compliance, improve wastewater flow control at the
plant, reduce environmental impact
Exchange Ion Media at WTP 1 August 2025 Improve water quality
Sheoah Blvd Water Main Replacement
Design
Early 2026 Remove old, hazardous pipe material from the system, improve
transmission to many residents, reduce line breaks
Vistawilla Blvd Reclaimed Water Main
Extension
Early 2026 Increase reclaimed water distribution across the City, provide
access to future development
Potable Water Prioritized Project List by Fiscal Year
Project Name Total Project Cost Community Benefits
FY
26
Residential Flow Meter
Replacement $6,900,000, 4 years Collection of unaccounted water and lost revenue to aid in utility
infrastructure upgrades
Water Main Replacement $5,910,000, 5 years Proactive efforts to reduce water line breaks and increase water
quality
WTP 1, 2, & 3 SCADA Migration $360,000 Upgrades to communication and monitoring of water system
WTP 2 PLC and SCADA
Replacement $75,000 Upgrades to communication and monitoring of water treatment
systems
Sheoah Blvd Water Main
Replacement $3,300,000 Replacement of aged infrastructure to prevent future pipe breaks
and increase system pressure
FY
27 Yearly Replacement Projects See above FY 26 Proactive efforts to reduce water line breaks and increase water
quality
FY
28
Winter Springs Blvd. Valve
Addition $40,000 Increases control of water system to minimize system outages
WTP 2 & 3 Tray Aerators $1,000,000 Improvements to plant treatment systems
FY
29
Nonconforming Service Line
Replacement To Be Determined Regulatory requirement to replace service lines in 10-years, reduce
lead exposure
FY
30
WTP 2 Fiber Expansion $180,000 Increase system’s communications reliability
WTP 3 Fiber Expansion $225,000 Increase system’s communications reliability
Advanced Water Treatment
Study To Be Determined Evaluate costs of treatment for a new water source
Water Supply Plan To Be Determined Improves City’s ability to provide water to future growth
Wastewater Prioritized Project List by Fiscal Year
Project Name Total Project Cost Community Benefits
FY
26
Lift Station 5E Upgrades $650,000 Upgrades to master station due to increase flow
Lift Station Radio and PLC
Upgrades $700,000 Upgrades to communication and monitoring of system, improved
response to emergencies
Resiliency and Redundancy at
Lift Stations $2,250,000, 5 years Upgrades to lift stations to prevent power and pump failures in the
event of extreme weather conditions
Sewer Main Replacement $2,685,000, 5 years Proactive efforts to reduce breaks, leaks, and future capacity
constraints
FY
27 Yearly Replacement Projects See above FY 26 Proactive efforts to reduce breaks, leaks, and future capacity
constraints
FY
28
12 Lift Station Floodproofing $1,155,469 Upgrades to lift stations to prevent site flooding in the event of
extreme weather conditions, increase reliability and autonomy
Lift Station Upgrades $360,000, 3 years Improvements to dated/phased out equipment, pumps, and valving
at needed stations to increase reliability and performance
East WRF Fiber Expansion $310,000 Increase system’s communications reliability
FY
29
Lift Station Panel Repairs (As
Needed)$80,000 Improvements to old and outdated control panels to prevent power
and communication failures at sites
East Gravity System Capacity
Study $115,000 Improves City’s ability to receive additional flow due to future growth
West WRF Fiber Expansion $77,000 Increase system’s communications reliability
FY
30 Septic to Sewer Study $280,000 Improve surface water quality by reducing nutrients, increase
reclaimed water produced
Reclaimed Water Prioritized Project List by Fiscal Year
Project Name Total Project Cost Community Benefits
FY
26
Oak Forest Controls $1,030,000, 2 years Improvements to current control system for increased reliability to
meet irrigation demands
RIB - Equipment
Improvements $510,000 Improvement to Rapid Infiltration Basin sites
Reclaimed Water Main
Replacement $870,000, 5 years Proactive efforts to improve distribution and pressure conditions,
reduce breaks, and anticipate future demands
FY
27
Vistawilla Blvd. East/West
Connection Construction $1,257,000, 2 years
Expansion of main to help distribute reclaimed water across the City
to help off-set the consumption of potable water being used for
irrigation
Michael Blake Reclaimed
Water Main Extension Design $1,600,000 Installation of reclaimed water main extension to off-set potable
water consumption by 50,000 gpd
FY
28
Converting Potable to
Reclaimed Water for Irrigation $400,000 Proactive effort to design reclaimed water extension to add users to
off-set the potable water consumption
FY
29
Lake Jesup Augmentation
Plant $1,380,000, 2 years Repairs to plant to increase production of irrigation water to the City
(design capacity 0.25 MGD)
FY
30
Jesup’s Landing and St. John’s
Landing Reclaimed Water Main
Extension
$300,000
Extension of reclaimed water service for irrigation to reduce
consumption of potable water by approx. 13,000 GPD
Summary of Prioritized 5 – Year CIP Projects
Total Projects - 31 Projects
•12 Potable Water projects = $17,990,000
•11 Sewer Projects = $8,662,469 (new WRF’s not included)
•8 Reclaimed Water projects = $7,347,000
•5-Year CIP Total Project Cost = $33,999,469
Proposed 5-year Capital Improvement Plan Budget
Project Title Project Total FY26 FY27 FY28 FY29 FY30
Residential Flow Meter Replacement $6,900,000 $1,750,000 $1,700,000 $1,750,000 $ 1,700,000
Lift Station Radio and PLC Upgrades $700,000 $700,000
WTP 1,2, 3 SCADA Migration $360,000 $360,000
WTP 2 PLC and SCADA Replacement $75,000 $75,000
Sewer Main Replacement $2,685,000 $685,000 $500,000 $500,000 $500,000 $ 500,000
Sheoah Blvd Water Main Replacement $3,300,000 $3,300,000
Lift Station 5E Upgrades $650,000 $650,000
Oak Forest RCW Controls $1,030,000 $530,000 $500,000
Resiliency and Redundancy at Lift Stations $2,250,000 $450,000 $450,000 $450,000 $450,000 $450,000
Reclaimed Water Main Replacement $870,000 $174,000 $174,000 $174,000 $174,000 $174,000
Water Main Replacement $5,910,000 $1,000,000 $1,910,000 $1,000,000 $1,000,000 $1,000,000
RIB - Equipment Improvements $510,000 $510,000
Vistawilla Blvd. East/West Reclaimed Water Connection $1,257,000 $795,000 $462,000
Michael Blake Reclaimed Water Extension $1,600,00 $1,600,00
12 Lift Station Floodproofing $1,155,469 $1,155,469
Winter Springs Blvd Valve Addition $40,000 $40,000
WTP 2 & 3 Tray Aerators $1,000,000 $1,000,000
Lift Station Upgrades $360,000 $120,000 $120,000 $120,000
East WRF Fiber Expansion $310,000 $310,000
Converting Potable to Reclaimed Water for Irrigation $400,000 $400,000
Lift Station Panel Repairs (as needed)$80,000 $40,000 $40,000
East Gravity System Capacity Study $115,000 $115,000
West WRF Fiber Expansion $77,000 $77,000
Nonconforming Service Line Replacement *
Lake Jesup Augmentation Plant $1,380,000 $100,000 $1,280,000
Jesup's Landing Connection $300,000 $300,000
WTP 2 Fiber Expansion $180,000 $180,000
WTP 3 Fiber Expansion $225,000 $225,000
Septic to Sewer Study $280,000 $280,000
Advanced Water Treatment Study *
Water Supply Plan *
Total $33,999,469 $10,184,000 $7,629,000 $7,361,469 $4,276,000 $4,549,000
* = Project cost to
be determined
based on agency
regulations.
Funding Impacts
•Anticipated Revenue FY26
•User Charges - $18,621,580
•SRF Design Loan - $5,452,000
•Total: $24,073,580
•Budged Expenditures FY 26
•Operating - $12,779,691
•Capital - $12,230,000 (Projects and Equipment)
•Total: 25,009,691
QUESTIONS