HomeMy WebLinkAbout2025 05 12 Public Hearing 404a. - Staff Presentation - Report Summary Presentation Chick-Fli-AChick-Fil-A
Terrilyn Rolle, MPA, AICP
Director of Community Development
City Commission
Background & Project Site
COMMUNITY DEVELOPMENT
Project: Chick-Fil-A, Winter Springs
Project Location: SR434/Michael Blake Blvd
Parcel IDs: 26-20-30-5AR-0A00-008D and
26-20-30-5AR-0A00-008H
Acreage: ± 2.30 acres
Existing Zoning: T-C; T-5: Urban Center Zone
Existing Future Land Use: Town Center District
Applicant: Ferber Construction Management LLC
Applications: Final Engineering Site Plans,
Development Agreement, Aesthetic Review, and
Waivers
May 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3
Overall Site Plan
COMMUNITY DEVELOPMENTMay 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3
Landscape Plan
COMMUNITY DEVELOPMENTMay 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3
Elevations
COMMUNITY DEVELOPMENTMay 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3
Mobility Credits
COMMUNITY DEVELOPMENT
2, 396 Daily Trips Generated
3 mobility credits required
4 provided
•4 bike racks at Chick-Fil-A
•8 bike racks at Ace Hardware
•Sidewalk connection from
Michael Blake intersection.
•Interconnectivity between
parcels
Excludes cross access easement.
May 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3
Proposed Conditions
COMMUNITY DEVELOPMENT
Staff recommends the City Commission approve FEDP-2024-0003, Development Agreement, Aesthetic Review, and Waivers
with the following conditions:
1. Execution of the First Modification to the Development Agreement.
2.Approval of the project is conditioned upon and contingent upon approval of the Sutton Crossings final engineering
plans, which provide for access, utilities, and stormwater drainage to the subject site.
3. A small wetland exists on site. Prior to the issuance of a Building Permit, a Saint Johns River Water Management Distric t
Environmental Resource Permit regarding this wetland shall be provided.
4. The FDOT-approved Access Connection Permit shall be provided prior to the issuance of a Building Permit.
5. Final Engineering Site Plans must include the pike and pedestrian facilities proposed to satisfy four (4) mobility credi ts.
6. Prior to the issuance of a Building Permit, please provide a hydrant flow test in accordance with NFPA 291. This test sh all
be within the last 12 months.
7. All grass areas on the Property shall use Bahia grass. No St. Augustine grass or grass types with low drought tolerance
shall be permitted.
8. Any additional conditions from City reviewing departments or the Development Agreement shall be enforceable.
May 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3
COMMUNITY DEVELOPMENT
ANY QUESTIONS?
May 12, 2025
AGENDA ITEM
404
City Commission
CH
I
C
K
-FI
L
-A
FE
D
P
-20
2
4
-00
0
3