Loading...
HomeMy WebLinkAbout2025 05 12 Public Hearing 403a. - Staff Presentation - Ace Hardware Staff Report SummarySutton Crossings Phase I Ace Hardware Terrilyn Rolle, MPA, AICP Director of Community Development City Commission Background & Project Site COMMUNITY DEVELOPMENT Project: Ace Hardware Location: NE corner of Tuskawilla Rd. and Michael Blake Blvd. Parcel ID: 01-21-30-501-0000-0010 Acreage: ± 3.58 Zoning: Town Center District (T5) Future Land Use: Town Center (TC) A Applicant: EPB ENGINEERING & CONSTRUCTION PLLC Applications: Final Engineering Site Plans, Development Agreement, and Waivers May 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 Overall Site Plan COMMUNITY DEVELOPMENTMay 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 Landscape Plan COMMUNITY DEVELOPMENTMay 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 Approved Aesthetic Review (2023) COMMUNITY DEVELOPMENTMay 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 Mobility Credits COMMUNITY DEVELOPMENT 2, 396 Daily Trips Generated 3 mobility credits required 4 provided •4 bike racks at Chick-Fil-A •8 bike racks at Ace Hardware •Sidewalk connection from Michael Blake intersection. •Interconnectivity between parcels Excludes cross access easement. May 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 Proposed Conditions COMMUNITY DEVELOPMENT Staff recommends that the Planning and Zoning Board recommend approval of the Waivers II -VI, Specimen Tree Removal, Final Engineering Plans, and Development Agreement to allow a hardware store with three (3) additional tenant spaces and construction of the Sutton Crossings shopping center infrastructure in the Town Center District, subject to the following conditions: 1. Proposed uses for the additional tenant spaces will be a permitted use in the T-5 Town Center Transect or shall receive a Conditional Use approval from the City Commission. 2. Approval of both the St. Johns River Water Management District Environmental Resource Permit for the Project as well as the City’s Environmental Resource Permit application No. 148395-4 to repair and make improvements to the Tuskawilla Crossings pond, including accommodating the Sutton Crossings Project, shall be required prior to commencement of site clearing and construction. 3.Prior to final plat approval, the applicant/owners shall record covenants and restrictions for the property owner’s association that will be responsible for perpetual maintenance of the common infrastructure for the Sutton Crossings shopping center. The owner shall include a provision in the covenants and restrictions acknowledging and advising that the parking lot may flood and serve as a retention area for water impoundment during both the 25year/24hour and 100year/24hour storm events. The covenants and restrictions shall contain a release, hold harmless, and indemnification provision for all claims related to flooding of the parking area as a result of the design of the approved engineering plans against the City of Winter Springs. 4.The applicant shall be required to revise the final engineering plans to remove the drive-through land and window for Retail Suite C and continue the streetscape for Michael Blake Boulevard.May 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 Proposed Conditions COMMUNITY DEVELOPMENT 5. The P&Z recommendation of approval is contingent upon the City Commission’s approval of the right -of-way vacation at a later date. 6. The applicant shall be required to pay ($52,800) for removal of trees 4” DBH – 9” DBH, and 89 mitigation credits for removal of trees 10” DBH and greater, excluding specimen tree(s), prior to the issuance of the tree removal and land clearing permit. 7. The applicant shall be required to pay 8 mitigation credits ($2,400) for removal of the specimen tree, prior to the issuance of the tree removal and land clearing permit. 8. Final Engineering Site Plans must include the pike and pedestrian facilities proposed to satisfy four (4) mobility credi ts. 9. Execution of Development Agreement prior to the issuance of the tree removal and land clearing permits. 10. There shall be no retail sales, manufacturing, or compounding of any products derived from the hemp plant or cannabis plant, including CBD (cannabidiol). 11. All grass on the Property shall be Bahia grass. No St. Augustine grass or grass types with low drought tolerance shall be permitted. May 12, 2025 AGENDA ITEM 403 City Commission SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 COMMUNITY DEVELOPMENT ANY QUESTIONS? SU T T O N C R O S S I N G S P H A S E I / A C E H A R D W A R E FE D P -20 2 4 -00 0 5 May 12, 2025 AGENDA ITEM 403 City Commission