HomeMy WebLinkAbout2025 04 28 Consent 300 - Oning Sidewalk Repair Program - Northwest QuadrantCONSENT AGENDA ITEM 300 CITY COMMISSION AGENDA | APRIL 28, 2025 REGULAR MEETING TITLE Ongoing Sidewalk Repairs Program - Northwest Quadrant SUMMARY In the City' ongoing efforts to address safety hazards relating to sidewalks, City Public Works staff have been grinding down heaved up sidewalk joints. For other areas requiring complete sidewalk replacement the City has enlisted NuWave Concrete to address these necessary and sometimes extensive repairs. This sidewalk program began the beginning of 2025 and have completed nearly all sidewalks in the Northwest Quadrant of the City. The pricing is sourced from Seminole County contract (IFB-604269-22/LNF). FUNDING SOURCE This project will be funded from the Transportation Improvement Fund (120) under CIP - Sidewalks RECOMMENDATION Staff requests approval by the City Commission to expend $111,534.72 for the repair of sidewalks at numerous locations within the Northwest Quadrant of the City, from Sheoah Boulevard along the westerly limits to Noth Moss Road along the easterly limits by Huffman Inc. DBA NuWave Concrete. 5 6 IFB-604269-22/LNF Seminole County PiggyBack Contract SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS 4/4/2025 PAY ITEM NUMBER ITEM DESCRIPTION UNIT PLAN QTY CONTRACT UNIT BID PRICE COST 110-4-10 Removal of Existing Concrete SY 1,586.83 12.00 19,042.00 522-1 Sidewalk Concrete (4" Thick)SY 1,487.39 53.00 78,831.61 522-2 Sidewalk Concrete (6" Thick)SY 99.44 64.00 6,364.44 SUB TOTAL 104,238.06$ County Mobilization along Major Roads (2%)2,084.76 County Approved Mainteenance of Traffic along Major Roads (5%)5,211.90$ TOTAL PROJECT COST 111,534.72$ John J Garcia General Manager Huffman Inc DBA NuWave Concrete Huffman, Inc. / NuWave Concrete 7 SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS Tripstop 4/4/2025 4'SW Lgth SW With Area of 4"Area of 4"SW Lgth SW With Area of 6"Area of 6" EA LF LF SF SY LF LF SF SY EA First Ct. 0 0.00 0 0.00 At Corner with Sheoah Blvd.20 5 100 11.11 0 0.00 60 20 5 100 11.11 0 0.00 50 28 5 140 15.56 0 0.00 20 38 5 190 21.11 0 0.00 Site 10 First Ct over Bombay Ave.22 4 88 9.78 0 0.00 Bombay Ave.0 0.00 0 0.00 Site 9 First Ct over Bombay Ave.21 4 84 9.33 0 0.00 8 16 4 64 7.11 0 0.00 620 SR 434 over Bombay Ave.122 4 488 54.22 0 0.00 Carwash 53 5 265 29.44 0 0.00 Algiers Ave 5 0.56 0 0.00 5 5 5 25 2.78 0 0.00 7 13 5 65 7.22 0 0.00 First St 0 0.00 0 0.00 Side 31 Algiers Ave over First Ct 5 5 25 2.78 0 0.00 Bombay Ave.0 0.00 0 0.00 From First Ct. to N First St.34 4 136 15.11 0 0.00 100 27 4 108 12.00 0 0.00 120 40 4 160 17.78 0 0.00 150 7 4 28 3.11 0 0.00 170 21 4 84 9.33 0 0.00 190 23 4 92 10.22 0 0.00 200 10 4 40 4.44 0 0.00 210 17 4 68 7.56 0 0.00 220 17 4 68 7.56 0 0.00 Third St 0 0.00 0 0.00 From Sheoah Blvd to McGregor Rd 22 4 88 9.78 0 0.00 From McGregor Rd to Bombay Ave 406 4 1624 180.44 0 0.00 310 23 4 92 10.22 0 0.00 300 10 4 40 4.44 0 0.00 290 20 4 80 8.89 0 0.00 270 30 4 120 13.33 13 9 117 13.00 260 29 4 116 12.89 21 12 252 28.00 250 19 4 76 8.44 12 8 96 10.67 240 6 4 24 2.67 0 0.00 230 41 4 164 18.22 13 8 104 11.56 220 21 4 84 9.33 13 4 52 5.78 N Edgmond Ave 0 0.00 0 0.00 300 31 4 124 13.78 0 0.00 Sidewalk Repair Request SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS 4"6" # of Trees Comments Page 2 of 4 8 SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS Tripstop 4/4/2025 4'SW Lgth SW With Area of 4"Area of 4"SW Lgth SW With Area of 6"Area of 6" Sidewalk Repair Request SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS 4"6" # of Trees Comments 310 24 4 96 10.67 0 0.00 Softball Field 46 4 184 20.44 0 0.00 WFW 5405 33 4 132 14.67 0 0.00 422 41 5 205 22.78 0 0.00 424 30 5 150 16.67 0 0.00 To Shepard Rd 57 5 285 31.67 0 0.00 From Shepard Rd to SR 419 101 5 505 56.11 0 0.00 Third St 0 0.00 0 0.00 Side 261 Edgemond Ave over Third St 10 5 50 5.56 0 0.00 260 5 5 25 2.78 0 0.00 241 27 5 135 15.00 0 0.00 N Fairfax Ave 0 0.00 0 0.00 170 15 5 75 8.33 0 0.00 140 16 5 80 8.89 0 0.00 110 26 5 130 14.44 0 N First St.0 0.00 0 0.00 From N. Fairfax Ave to N Flamingo Ave 46 5 230 25.56 0 0.00 From N Flamingo Ave to Moss Rd 64.5 5 322.5 35.83 0 0.00 From Moss Rd to N Fairfax Ave 21 5 105 11.67 0 0.00 From N Fairfox Ave to N Devon Ave 0 0 0 0.00 0 0.00 From N Devon Ave to N Fairfax Ave 15 5 75 8.33 0 0.00 N Fairfax Ave 0 0.00 0 0.00 50 58 4 232 25.78 0 0.00 Lori Ann Ln 0 0.00 0 0.00 160 10 4 40 4.44 0 0.00 146 22 4 88 9.78 0 0.00 120 25 4 100 11.11 16 11 176 19.56 116 12 4 48 5.33 0 0.00 114 18 4 72 8.00 0 0.00 110 31 4 124 13.78 0 0.00 115 85 4 340 37.78 0 0.00 125 10 4 40 4.44 0 0.00 135 50 4 200 22.22 0 0.00 145 18 4 72 8.00 0 0.00 157 14 4 56 6.22 0 0.00 163 6 4 24 2.67 0 0.00 171 39 4 156 17.33 0 0.00 177 5 4 20 2.22 0 0.00 N Fairfax Ave 0 0.00 0 0.00 12 9 5 45 5.00 6 0.67 N Devon Ave 0 0.00 0 0.00 Family Dollar 51 5 255 28.33 0 0.00 Page 3 of 4 9 SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS Tripstop 4/4/2025 4'SW Lgth SW With Area of 4"Area of 4"SW Lgth SW With Area of 6"Area of 6" Sidewalk Repair Request SHEOAH BLVD TO MOSS RD SIDEWALKS REPAIRS 4"6" # of Trees Comments 6A 0 0.00 13 4 52 5.78 40 10 5 50 5.56 0 0.00 N First St.0 0.00 0 0.00 81 23 5 115 12.78 0 0.00 From N Edgemond Ave to N Devon Ave 21 5 105 11.67 0 0.00 N Devon Ave 0 0.00 0 0.00 101 5 5 25 2.78 0 0.00 151 19 5 95 10.56 0 0.00 161 10 5 50 5.56 0 0.00 171 8 5 40 4.44 0 0.00 201 5 5 25 2.78 0 0.00 Side 241 Third St 54 5 270 30.00 0 0.00 N Edgmond Ave 0 0.00 0 0.00 211 30 4 120 13.33 0 0.00 Side 10 Second St 77 4 308 34.22 0 0.00 200 14 4 56 6.22 0 0.00 170 35 4 140 15.56 0 0.00 160 51 4 204 22.67 0 0.00 140 23 4 92 10.22 0 0.00 130 32 4 128 14.22 0 0.00 110 15 4 60 6.67 0 0.00 N First St.0 0.00 0 0.00 100 59 5 295 32.78 0 0.00 101 5 5 25 2.78 0 0.00 N Edgmond Ave 0 0.00 0 0.00 70 14 4 56 6.22 0 0.00 40 11 4 44 4.89 0 0.00 Bonfield Funeral 33 4 132 14.67 0 0.00 N Cortez Ave 0 0.00 0 0.00 Carwash 89 5 445 49.44 8 5 40 4.44 30 10 5 50 5.56 0 0.00 60 34 5 170 18.89 0 0.00 70 10 5 50 5.56 80 14 5 70 7.78 0 0.00 N First St.0 0.00 0 0.00 Side 91 N Bombay Ave 27 5 135 15.00 0 0.00 100 9 5 45 5.00 0 0.00 N Cortez Ave 0 0.00 0 0.00 Side 100 First St 10 5 50 5.56 0 0.00 120 16 5 80 8.89 0 0.00 200 21 5 105 11.67 0 0.00 TOTALS - 3,051.50 13,386.50 1,487.39 109.00 895.00 99.44 Page 4 of 4 10