Loading...
HomeMy WebLinkAbout2025 02 24 Consent 302 - Endeavour Drive South Roadway RepairCONSENT AGENDA ITEM 302 CITY COMMISSION AGENDA | FEBRUARY 24, 2025 REGULAR MEETING TITLE Endeavour Drive South - Roadway Repair SUMMARY Endeavor Drive South at the cul-de-sac area has experienced roadway base failure due to an underperforming roadway under-drain system which is nearly 40-years old. As a result of the failed under-drain a portion of the roadway has collapsed as well as the adjoining sidewalks, curbing and driveway aprons. The existing improvements will be removed and replaced including the under-drain systems and the affected sidewalks, driveway aprons and curbing. The proposed improvements also include the milling and resurfacing of the affected areas of the cul-de-sac roadway surface. Through Cathcart Construction's piggyback contract with the City of Altamonte Springs City staff are able to expedite this needed repair. FUNDING SOURCE Budgeted in Road Improvement Fund which holds 3rd Generation Sales Tax Funds under City-Wide Storm Water Rehabilitation. RECOMMENDATION City staff request approval from the City Commission for the funding approval required for the needed repairs to cul-de-sac located at the south end of Endeavour Drive. Cathcart Construction will provide these needed roadway improvements which include the removal and replacement of the roadway underdrain, and other affected amenities, including sidewalk, driveway aprons and curbing. Final repair will include the milling and resurfacing of the cul-de-sac within the limits of constructions. The cost for these improvements is $55,813.00. 135 136 2nd March 23 March 2, 2023 March 1, 2024 137 138 02/13/2024 139