HomeMy WebLinkAbout2025 02 10 Consent 302 - Multiple Storm Sewer Pipelining ProjectsCONSENT AGENDA ITEM 302
CITY COMMISSION AGENDA | FEBRUARY 10, 2025 REGULAR MEETING
TITLE
Multiple Storm Sewer Pipelining Projects
SUMMARY
See attached Summary of pipelining projects totaling $539,457.83.
FUNDING SOURCE
Budgeted in Road Improvement Fund which holds 3rd Generation Sales Tax Funds
under City-Wide Storm Water Rehabilitation.
RECOMMENDATION
See attached Suggested Actions for each project.
64
Multiple Pipelining Projects
1. 1170 Howell Creek Drive
Suggested Action: Staff requests for approval by the City Commission to expend
$118,140.00 for the installation of pipelining by Flo-Tech Environmental, beginning at 1170
Howell Creek Drive and extending over 285 - linear feet.
Summary: This area of Howell Creek Drive ROW has experienced repeated depressions
in the ground surface area caused by the degradation of the existing 36-inch storm sewer
pipe. Upon video inspection of the existing 36-inch storm sewer pipe it was noted that there
are notable weep holes resulting in cracking and the general degradation of the nearly 50-
year-old concrete pipe. To address this condition Staff requests approval by the City
Commission for the installation of pipelining beginning at 1170 Howell Creek Drive and
extending over 285 - linear feet. The pipelining process consists of installing a resin
impregnated felt tube pipe liner into the host pipe and cure in-place in accordance with
ASTM F-1216. Services include Pre and Post Video Inspection. Through Flo-Tech's piggyback
contract with the City of Cape Coral we can expedite this needed repair.
2. 1202 Winter Springs Boulevard
Suggested Action: Staff request for approval by the City Commission to expend
$140,259.02 for the installation of pipelining by Flo-Tech Environmental, beginning at 1202
Winter Springs Boulevard and extending over 404 - linear feet.
Summary: This area of the Winter Springs Boulevard ROW has experienced repeated
depressions in the ground surface area caused by the degradation of the existing 30-inch
storm sewer pipe. Upon video inspection of the existing 30-inch storm sewer pipe it was
noted that there are notable weep holes resulting in cracking and the general degradation of
the nearly 50-year-old concrete pipe. To address this condition Staff requests approval by
the City Commission for the installation of pipelining beginning at 1202 Winter Springs
Boulevard and extending over 404- linear feet. The pipelining process consists of installing a
resin impregnated felt tube pipe liner into the host pipe and cure in-place in accordance
with ASTM F-1216. Services include Pre and Post Video Inspection. Through Flo -Tech's
piggyback contract with the City of Cape Coral we can expedite this needed repair.
3. 1162 Howell Creek Drive
Suggested Action: Staff requests for approval by the City Commission to expend
$111,040.52 for the installation of pipelining by Flo -Tech Environmental, beginning at 1162
Howell Creek Drive and extending over 318- linear feet.
Summary: This area of the Howell Creek Drive ROW has experienced repeated
depressions in the ground surface area caused by the degradation of the existing 30-inch
storm sewer pipe. Upon video inspection of the existing 30-inch storm sewer pipe it was
noted that there are notable weep holes resulting cracking of and the general degradation
65
of the nearly 50-year-old concrete pipe. To address this condition Staff requests approval by
the City Commission for the installation of pipelining beginning at 1162 Howell Creek Drive
and extending over 318 - linear feet. The pipelining process consists of installing a resin
impregnated felt tube pipe liner into the host pipe and cure in-lace in accordance with ASTM
F-1216. Services include Pre and Post Video Inspection. Through Flo-Tech's piggyback
contract with the City of Cape Coral we can expedite this needed repair.
4. 1215 Deer Run
Suggested Action: Staff requests for approval by the City Commission to expend
$94,068.77 for the installation of pipelining by Flo-Tech Environmental, beginning at 1215
Deer Run and extending over 225 - linear feet.
Summary: This area of 1215 Deer Run ROW has experienced repeated depressions in
the ground surface area caused by the degradation of the existing 36-inch storm sewer pipe.
Upon video inspection of the existing 36-inch storm sewer pipe it was noted that there are
notable weep holes resulting in cracking and the general degradation of the nearly 50-year-
old concrete pipe. To address this condition Staff requests approval by the City Commission
for the installation of pipelining beginning at 1215 Deer Run and extending over 225 - linear
feet. The pipelining process consists of installing a resin impregnated felt tube pipe liner
into the host pipe and cure in-place in accordance with ASTM F-1216. Services include Pre
and Post Video Inspection. Through Flo -Tech's piggyback contract with the City of Cape
Coral we can expedite this needed repair.
5. 699 Brown Bear Court
Suggested Action: Staff requests for approval by the City Commission to expend
$75,949.52 for the installation of pipelining by Flo-Tech Environmental, beginning at 699
Brown Bear Court and extending over 387 - linear feet down Northern Way.
Summary: This area of Brown Bear Court and Northern Way ROW has experienced
repeated depressions in the ground surface area caused by the degradation of the existing
15-inch storm sewer pipe. Upon video inspection of the existing 15-inch storm sewer pipe it
was noted that there are notable weep holes resulting in cracking and the general
degradation of the nearly 50-year-old concrete pipe. To address this condition Staff
requests approval by the City Commission for the installation of pipelining beginning at 699
Browm Bear Court and extending over 387 - linear feet down Northern Way. The pipelining
process consists of installing a resin impregnated felt tube pipe liner into the host pipe and
cure in-place in accordance with ASTM F-1216. Services include Pre and Post Video
Inspection. Through Flo-Tech's piggyback contract with the City of Cape Coral we can
expedite this needed repair.
66
City of Winter Springs - 1170 Howell Creek
Drive - 36" CIPP
City of Winter Springs
1126 East State Road 434
Winter Springs, FL 32708
United States
Kevin Monser
kmmonser@winterspringsfl.org
(407) 327-6567
Reference: 20250114-154106561
Quote created: January 14, 2025
Quote expires: February 13, 2025
Quote created by: Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
67
Comments from Luis Ferre
Project Owner: City of Winter Springs
Project/Contract: Number: N/A
Project Name: SW Relining FY24 (Stormwater Relining FY24)
Project General Contractor: N/A
Project County: Seminole
Region: Central
Job-site Address: 1170 Howell Drive, Winter Springs, FL 32708
Onsite Point of Contact: Kevin Mosner
Maps/Plans Provided: [Yes]
Technical Specifications: ASTM F1216-22, NASSCO PACP
Certified Payroll Applicable: [No]
Heavy Construction Wage Applicable: [No]
Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final
deliverables
Billing Instructions: Include PO# in each invoice.
AP / Billing contact email: kmmonser@winterspringsfl.org
Scope of Work: 36" CIPP, 285 LF.
Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with
ASTM F-1216. Includes pre / post video inspection.
Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning,
asphalt cutting, grounds restoration, paving, excavation.
Flotech Environmental is a certified SBE, DBE, MBE, CBE company.
68
Products & Services
Item & Description Quantity Unit
Price
Total
36" CIPP (15mm)285 $404.00 $115,140.00
36" Pipe Diameter By-Pass / Pumping / Dewatering Where
Needed
1 $0.01 $0.01
MOT: Local Roads 1 $0.01 $0.01
Mobilization Price for MOB where the SOW is priced
greaterthan$25,000
1 $3,000.00 $3,000.00
One-time subtotal $118,140.02
Total $118,140.02
LF.
LS
LS
LS
69
Purchase terms
Above pricing is based on project information and plans as provided by Client, and assumed site conditions.
Assumptions:
The work area for which the services are requested are in suitable condition to allow for the activities which
are usual and customary for the services requested without undue risk to the Contractors equipment or
personnel, unless otherwise described by the Owner in writing.
Change Orders:
Should it be found during initial investigation and/or during the course of performance that conditions are
different than those which are typical and customary and outside of the assumptions listed above, the
Contractor may negotiate a reasonable change in terms.
Disclaimer:
Cleaning and CCTV inspection work shall conform to current NASSCO-PACP standards:
If in the course of normal cleaning operations damage results from preexisting and unforeseen conditions
such as broken pipe, the Contractor will not be held responsible. If, during the inspection operation, the
television camera will not pass through the entire manhole section, the Contractor shall set up his
equipment so that the inspection can be performed from the opposite manhole. If, again, the camera fails to
pass through the entire manhole section, the inspection shall be considered complete, noted as Survey
Abandoned and no additional inspection will be required.
An hourly standby rate of $770 will apply for any issues that delay production outside of Flotech
Environmental's control.
Cancellation Notice:
Cancellations prior to 2:00 PM for our crews will result in a charge for the 4 hour minimum at the
corresponding hourly rate, with the exception of immediate weather conditions impeding our ability to work
or jeopardizing our crew’s safety.
Payment:
Flotech will invoice at the completion of each weekly billing period and payment must be made within Thirty
(30) days from the date of the invoice. Should payment not be received within 30 days of service, service may
be interrupted until payment is received. Any balance remaining after 30 days will be assessed a 1.5%
monthly finance charge. In the event of any action to collect unpaid invoices, Client and/or managing
corporation, and/or entity shall be liable to Flotech or its assignee for all costs of collection, including but not
limited to attorney’s fees and costs, including any costs of litigation relating to such collection and including
the collection amount.
ACCEPTANCE OF PROPOSAL / SIGN & RETURN:
70
Signature
Before you sign this quote, an email must be sent to you to verify your identity. Find your profile below to request a verification
email.
Kevin Monser
kmmonser@winterspringsfl.org [sig|req|signer1 ]
Questions? Contact me
Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
Flotech Environmental, LLC
657 South Dr.
Suite 401
Miami Springs, FL 33166
United States
71
City of Winter Springs - 1202 Winter Springs
Blvd - 30" CIPP
City of Winter Springs
1126 East State Road 434
Winter Springs, FL 32708
United States
Kevin Monser
kmmonser@winterspringsfl.org
(407) 327-6567
Reference: 20250109-165614701
Quote created: January 9, 2025
Quote expires: February 8, 2025
Quote created by: Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
72
Comments from Luis Ferre
Project Owner: City of Winter Springs
Project/Contract: Number: N/A
Project Name: SW Relining FY24 (Stormwater Relining FY24)
Project General Contractor: N/A
Project County: Seminole
Region: Central
Job-site Address: 1202 Winter Springs Blvd, Winter Springs, FL 32708
Onsite Point of Contact: Kevin Mosner
Maps/Plans Provided: [Yes]
Technical Specifications: ASTM F1216-22, NASSCO PACP
Certified Payroll Applicable: [No]
Heavy Construction Wage Applicable: [No]
Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final
deliverables
Billing Instructions: Include PO# in each invoice.
AP / Billing contact email: accountspayable@winterspringsfl.org & kmmonser@winterspringsfl.org
Scope of Work: 30" CIPP, 404 LF.
Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with
ASTM F-1216. Includes pre / post video inspection.
Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning,
asphalt cutting, grounds restoration, paving, excavation.
Flotech Environmental is a certified SBE, DBE, MBE, CBE company.
73
Products & Services
Item & Description Quantity Unit
Price
Total
30" CIPP (10.5mm)404 $339.75 $137,259.00
30" Pipe Diameter By-Pass / Pumping / Dewatering Where
Needed
1 $0.01 $0.01
MOT: Local Roads 1 $0.01 $0.01
Mobilization Price for MOB where the SOW is priced greater
than $25,000
1 $3,000.00 $3,000.00
One-time subtotal $140,259.02
Total $140,259.02
LS
LS
LS
74
Purchase terms
Above pricing is based on project information and plans as provided by Client, and assumed site conditions.
Assumptions:
The work area for which the services are requested are in suitable condition to allow for the activities which
are usual and customary for the services requested without undue risk to the Contractors equipment or
personnel, unless otherwise described by the Owner in writing.
Change Orders:
Should it be found during initial investigation and/or during the course of performance that conditions are
different than those which are typical and customary and outside of the assumptions listed above, the
Contractor may negotiate a reasonable change in terms.
Disclaimer:
Cleaning and CCTV inspection work shall conform to current NASSCO-PACP standards:
If in the course of normal cleaning operations damage results from preexisting and unforeseen conditions
such as broken pipe, the Contractor will not be held responsible. If, during the inspection operation, the
television camera will not pass through the entire manhole section, the Contractor shall set up his
equipment so that the inspection can be performed from the opposite manhole. If, again, the camera fails to
pass through the entire manhole section, the inspection shall be considered complete, noted as Survey
Abandoned and no additional inspection will be required.
An hourly standby rate of $770 will apply for any issues that delay production outside of Flotech
Environmental's control.
Cancellation Notice:
Cancellations prior to 2:00 PM for our crews will result in a charge for the 4 hour minimum at the
corresponding hourly rate, with the exception of immediate weather conditions impeding our ability to work
or jeopardizing our crew’s safety.
Payment:
Flotech will invoice at the completion of each weekly billing period and payment must be made within Thirty
(30) days from the date of the invoice. Should payment not be received within 30 days of service, service may
be interrupted until payment is received. Any balance remaining after 30 days will be assessed a 1.5%
monthly finance charge. In the event of any action to collect unpaid invoices, Client and/or managing
corporation, and/or entity shall be liable to Flotech or its assignee for all costs of collection, including but not
limited to attorney’s fees and costs, including any costs of litigation relating to such collection and including
the collection amount.
ACCEPTANCE OF PROPOSAL / SIGN & RETURN:
75
Signature
Before you sign this quote, an email must be sent to you to verify your identity. Find your profile below to request a verification
email.
Kevin Monser
kmmonser@winterspringsfl.org [sig|req|signer1 ]
Questions? Contact me
Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
Flotech Environmental, LLC
657 South Dr.
Suite 401
Miami Springs, FL 33166
United States
76
City of Winter Springs - 1162 Howell Creek
Drive - 30" CIPP
City of Winter Springs
1126 East State Road 434
Winter Springs, FL 32708
United States
Kevin Monser
kmmonser@winterspringsfl.org
(407) 327-6567
Reference: 20250114-155740858
Quote created: January 14, 2025
Quote expires: February 13, 2025
Quote created by: Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
77
Comments from Luis Ferre
Project Owner: City of Winter Springs
Project/Contract: Number: N/A
Project Name: SW Relining FY24 (Stormwater Relining FY24)
Project General Contractor: N/A
Project County: Seminole
Region: Central
Job-site Address: 1162 Howell Creek Drive, Winter Springs, FL 32708
Onsite Point of Contact: Kevin Mosner
Maps/Plans Provided: [Yes]
Technical Specifications: ASTM F1216-22, NASSCO PACP
Certified Payroll Applicable: [No]
Heavy Construction Wage Applicable: [No]
Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final
deliverables
Billing Instructions: Include PO# in each invoice.
AP / Billing contact email: kmmonser@winterspringsfl.org
Scope of Work: 30" CIPP, 318 LF.
Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with
ASTM F-1216. Includes pre / post video inspection.
Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning,
asphalt cutting, grounds restoration, paving, excavation.
Flotech Environmental is a certified SBE, DBE, MBE, CBE company.
78
Products & Services
Item & Description Quantity Unit
Price
Total
30" CIPP (12mm)318 $339.75 $108,040.50
30" Pipe Diameter By-Pass / Pumping / Dewatering Where
Needed
1 $0.01 $0.01
MOT: Local Roads 1 $0.01 $0.01
Mobilization Price for MOB where the SOW is priced greater
than $25,000
1 $3,000.00 $3,000.00
One-time subtotal $111,040.52
Total $111,040.52
LF
LS.
LS
LS
79
Purchase terms
Above pricing is based on project information and plans as provided by Client, and assumed site conditions.
Assumptions:
The work area for which the services are requested are in suitable condition to allow for the activities which
are usual and customary for the services requested without undue risk to the Contractors equipment or
personnel, unless otherwise described by the Owner in writing.
Change Orders:
Should it be found during initial investigation and/or during the course of performance that conditions are
different than those which are typical and customary and outside of the assumptions listed above, the
Contractor may negotiate a reasonable change in terms.
Disclaimer:
Cleaning and CCTV inspection work shall conform to current NASSCO-PACP standards:
If in the course of normal cleaning operations damage results from preexisting and unforeseen conditions
such as broken pipe, the Contractor will not be held responsible. If, during the inspection operation, the
television camera will not pass through the entire manhole section, the Contractor shall set up his
equipment so that the inspection can be performed from the opposite manhole. If, again, the camera fails to
pass through the entire manhole section, the inspection shall be considered complete, noted as Survey
Abandoned and no additional inspection will be required.
An hourly standby rate of $770 will apply for any issues that delay production outside of Flotech
Environmental's control.
Cancellation Notice:
Cancellations prior to 2:00 PM for our crews will result in a charge for the 4 hour minimum at the
corresponding hourly rate, with the exception of immediate weather conditions impeding our ability to work
or jeopardizing our crew’s safety.
Payment:
Flotech will invoice at the completion of each weekly billing period and payment must be made within Thirty
(30) days from the date of the invoice. Should payment not be received within 30 days of service, service may
be interrupted until payment is received. Any balance remaining after 30 days will be assessed a 1.5%
monthly finance charge. In the event of any action to collect unpaid invoices, Client and/or managing
corporation, and/or entity shall be liable to Flotech or its assignee for all costs of collection, including but not
limited to attorney’s fees and costs, including any costs of litigation relating to such collection and including
the collection amount.
ACCEPTANCE OF PROPOSAL / SIGN & RETURN:
80
Signature
Before you sign this quote, an email must be sent to you to verify your identity. Find your profile below to request a verification
email.
Kevin Monser
kmmonser@winterspringsfl.org [sig|req|signer1 ]
Questions? Contact me
Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
Flotech Environmental, LLC
657 South Dr.
Suite 401
Miami Springs, FL 33166
United States
81
City of Winter Springs - 1215 Deer Run - 36"
CIPP
City of Winter Springs
1126 East State Road 434
Winter Springs, FL 32708
United States
Kevin Monser
kmmonser@winterspringsfl.org
(407) 327-6567
Reference: 20250124-145128606
Quote created: January 24, 2025
Quote expires: February 23, 2025
Quote created by: Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
82
Project Information
Project Owner: City of Winter Springs
Project/Contract: Number: N/A
Project Name: SW Relining FY24 (Stormwater Relining FY24)
Project General Contractor: N/A
Project County: Seminole
Region: Central
Job-site Address: 1215 Deer Run Dr., Winter Springs, FL 32708
Onsite Point of Contact: Kevin Mosner
Maps/Plans Provided: [Yes]
Technical Specifications: ASTM F1216-22, NASSCO PACP
Certified Payroll Applicable: [No]
Heavy Construction Wage Applicable: [No]
Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final
deliverables
Billing Instructions: Include PO# in each invoice.
AP / Billing contact email: accountspayable@winterspringsfl.org & kmmonser@winterspringsfl.org
Scope of Work: 36" CIPP, 225 LF . 15 mm.
Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with
ASTM F-1216. Includes pre / post video inspection.
Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning.
Flotech Environmental is a certified SBE, DBE, MBE, CBE company.
83
Products & Services
Item & Description Quantity Unit
Price
Total
CIPP 36" (15mm)225 $404.75 $91,068.75
36" Pipe Diameter By-Pass / Pumping / Dewatering Where
Needed
1 $0.01 $0.01
MOT: Local Roads 1 $0.01 $0.01
Mobilization Price for MOB where the SOW is priced greater
than $25,000
1 $3,000.00 $3,000.00
One-time subtotal $94,068.77
Total $94,068.77
LF
LS
LS
LS
84
Proposal Terms
Above pricing is based on project information and plans as provided by Client, and assumed site conditions.
Assumptions:
The work area for which the services are requested are in suitable condition to allow for the activities which
are usual and customary for the services requested without undue risk to the Contractors equipment or
personnel, unless otherwise described by the Owner in writing.
Change Orders:
Should it be found during initial investigation and/or during the course of performance that conditions are
different than those which are typical and customary and outside of the assumptions listed above, the
Contractor may negotiate a reasonable change in terms.
Disclaimer:
Cleaning and CCTV inspection work shall conform to current NASSCO-PACP standards:
If in the course of normal cleaning operations damage results from preexisting and unforeseen conditions
such as broken pipe, the Contractor will not be held responsible. If, during the inspection operation, the
television camera will not pass through the entire manhole section, the Contractor shall set up his
equipment so that the inspection can be performed from the opposite manhole. If, again, the camera fails to
pass through the entire manhole section, the inspection shall be considered complete, noted as Survey
Abandoned and no additional inspection will be required.
An hourly standby rate of $770 will apply for any issues that delay production outside of Flotech
Environmental's control.
Cancellation Notice:
Cancellations prior to 2:00 PM for our crews will result in a charge for the 4 hour minimum at the
corresponding hourly rate, with the exception of immediate weather conditions impeding our ability to work
or jeopardizing our crew’s safety.
Payment:
Flotech will invoice at the completion of each weekly billing period and payment must be made within Thirty
(30) days from the date of the invoice. Should payment not be received within 30 days of service, service may
be interrupted until payment is received. Any balance remaining after 30 days will be assessed a 1.5%
monthly finance charge. In the event of any action to collect unpaid invoices, Client and/or managing
corporation, and/or entity shall be liable to Flotech or its assignee for all costs of collection, including but not
limited to attorney’s fees and costs, including any costs of litigation relating to such collection and including
the collection amount.
ACCEPTANCE OF PROPOSAL / SIGN & RETURN:
85
Signature
Before you sign this quote, an email must be sent to you to verify your identity. Find your profile below to request a verification
email.
Kevin Monser
kmmonser@winterspringsfl.org [sig|req|signer1 ]
Questions? Contact me
Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
Flotech Environmental, LLC
657 South Dr.
Suite 401
Miami Springs, FL 33166
United States
86
City of Winter Springs - 699 Brown Bear Ct
and Nor thern Way - 15" CIPP
City of Winter Springs
1126 East State Road 434
Winter Springs, FL 32708
United States
Kevin Monser
kmmonser@winterspringsfl.org
(407) 327-6567
Reference: 20250129-144427030
Quote created: January 29, 2025
Quote expires: February 28, 2025
Quote created by: Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
87
Project Information
Project Owner: City of Winter Springs
Project/Contract: Number: N/A
Project Name: SW Relining FY24 (Stormwater Relining FY24)
Project General Contractor: N/A
Project County: Seminole
Region: Central
Job-site Address: 699 Brown Bear Court, Winter Springs, FL 32708
Onsite Point of Contact: Kevin Mosner
Maps/Plans Provided: [Yes]
Technical Specifications: ASTM F1216-22, NASSCO PACP
Certified Payroll Applicable: [No]
Heavy Construction Wage Applicable: [No]
Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final
deliverables
Billing Instructions: Include PO# in each invoice.
AP / Billing contact email: accountspayable@winterspringsfl.org & kmmonser@winterspringsfl.org
Scope of Work: 15" CIPP, 387 LF . 7.5 mm
Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with
ASTM F-1216. Includes pre / post video inspection.
Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning.
Flotech Environmental is a certified SBE, DBE, MBE, CBE company.
88
Products & Services
Item & Description Quantity Unit
Price
Total
CIPP, 15" (7.5 mm)387 $188.50 $72,949.50
15" Pipe Diameter By-Pass / Pumping / Dewatering Where
Needed
1 $0.01 $0.01
MOT: Local Roads 1 $0.01 $0.01
Mobilization Price for MOB where the SOW is priced greater
than $25,000
1 $3,000.00 $3,000.00
One-time subtotal $75,949.52
Total $75,949.52
LF.
LS
LS.
LS
89
Proposal Terms
Above pricing is based on project information and plans as provided by Client, and assumed site conditions.
Assumptions:
The work area for which the services are requested are in suitable condition to allow for the activities which
are usual and customary for the services requested without undue risk to the Contractors equipment or
personnel, unless otherwise described by the Owner in writing.
Change Orders:
Should it be found during initial investigation and/or during the course of performance that conditions are
different than those which are typical and customary and outside of the assumptions listed above, the
Contractor may negotiate a reasonable change in terms.
Disclaimer:
Cleaning and CCTV inspection work shall conform to current NASSCO-PACP standards:
If in the course of normal cleaning operations damage results from preexisting and unforeseen conditions
such as broken pipe, the Contractor will not be held responsible. If, during the inspection operation, the
television camera will not pass through the entire manhole section, the Contractor shall set up his
equipment so that the inspection can be performed from the opposite manhole. If, again, the camera fails to
pass through the entire manhole section, the inspection shall be considered complete, noted as Survey
Abandoned and no additional inspection will be required.
An hourly standby rate of $770 will apply for any issues that delay production outside of Flotech
Environmental's control.
Cancellation Notice:
Cancellations prior to 2:00 PM for our crews will result in a charge for the 4 hour minimum at the
corresponding hourly rate, with the exception of immediate weather conditions impeding our ability to work
or jeopardizing our crew’s safety.
Payment:
Flotech will invoice at the completion of each weekly billing period and payment must be made within Thirty
(30) days from the date of the invoice. Should payment not be received within 30 days of service, service may
be interrupted until payment is received. Any balance remaining after 30 days will be assessed a 1.5%
monthly finance charge. In the event of any action to collect unpaid invoices, Client and/or managing
corporation, and/or entity shall be liable to Flotech or its assignee for all costs of collection, including but not
limited to attorney’s fees and costs, including any costs of litigation relating to such collection and including
the collection amount.
ACCEPTANCE OF PROPOSAL / SIGN & RETURN:
90
Questions? Contact me
Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
Flotech Environmental, LLC
657 South Dr.
Suite 401
Miami Springs, FL 33166
United States
91