HomeMy WebLinkAbout2025 02 10 Consent 301 - Capital Improvement Plan (CIP) Roadway ResurfacingCONSENT AGENDA ITEM 301 CITY COMMISSION AGENDA | FEBRUARY 10, 2025 REGULAR MEETING TITLE Capital Improvement Plan (CIP) - Roadway Resurfacing SUMMARY City Staff has prepared a proposal for the Capital Improvement Plan, approved by the Commission, for the resurfacing of roads throughout the City. The total cost for resurfacing by Middlesex Paving, LLC is $904,906.43. The procurement of the pavement resurfacing contract was executed through a piggy-back contract between Middlesex Paving, LLC and Seminole County. FUNDING SOURCE The total cost for resurfacing by Middlesex Paving, LLC is $940,906.43. Funding for this project is budgeted in the Transportation Improvement Fund for FY 2025 within CIP Resurfacing. RECOMMENDATION Staff requests the Commission approve the 2025 Capital Improvement Plan (CIP) for resurfacing by Middlesex Paving, LLC totaling $940,906.43 and authorize the City Manager and City Attorney to negotiate and execute agreements related to the agenda item. 24 Middlesex Paving LLC Pricing for Winter Springs FY 2025 Resurfacing Road Name Road Length Avg. Road Width Number SY Tons Milling Cost -SY Paving Cost - Ton Total (Ft.)(Ft.)#165 $7.65 $141.60 1 Eagles Nest Circle 985 20 2200 182 $16,830.00 $25,700.40 $42,530.40 2 Golfpoint Drive 315 20 700 58 $5,355.00 $8,177.40 $13,532.40 3 South Greenleaf Ct 900 20 2000 165 $15,300.00 $23,364.00 $38,664.00 4 Winter Springs Boulevard 700 18 1400 116 $10,710.00 $16,354.80 $27,064.80 5 Conesus Lane 632 20 1405 116 $10,748.25 $16,413.21 $27,161.46 6 Saranac Drive 402 20 894 74 $6,839.10 $10,443.71 $17,282.81 7 Wolverine Lane 1,222 20 2716 224 $20,777.40 $31,728.31 $52,505.71 8 Chokecherry Drive 907 20 2000 165 $15,300.00 $23,364.00 $38,664.00 9 Fox Den Court 355 20 790 65 $6,043.50 $9,228.78 $15,272.28 10 Chokecherry Drive 522 24 1392 115 $10,648.80 $16,261.34 $26,910.14 11 Turkey Hollow Circle 520 20 1156 95 $8,843.40 $13,504.39 $22,347.79 12 Cheoy Lee Circle (Black Base)340 20 756 62 $5,783.40 $8,831.59 $14,614.99 13 Maple Leaf Loop 172 20 382 32 $2,922.30 $4,462.52 $7,384.82 14 Highlands Glen Circle 708 20 1574 130 $12,041.10 $18,387.47 $30,428.57 15 Holiday Lane 876 20 1947 161 $14,894.55 $22,744.85 $37,639.40 16 Sailfish Road 1,010 20 2244 185 $17,166.60 $26,214.41 $43,381.01 17 West Panama Road 1,076 22 2630 217 $20,119.50 $30,723.66 $50,843.16 18 Murphy Road 1,925 24 5133 423 $39,267.45 $59,963.71 $99,231.16 19 North Alderwood Street 808 23 2065 170 $15,797.25 $24,123.33 $39,920.58 20 Brookside Drive 1,465 20 3256 269 $24,908.40 $38,036.59 $62,944.99 21 Central Winds Parkway 2,075 22 5072 418 $38,800.80 $59,251.10 $98,051.90 22 Blumberg Boulevard 1,600 20 3555 293 $27,195.75 $41,529.51 $68,725.26 $0.00 $0.00 $0.00 Totals 45267 3735 $346,292.55 $528,809.09 $875,101.64 MOT (Not to excess $1500 per day)14 Days $1500.00 per day $21,000.00 Mobilization (5% of Total Paving Cost)$44,805.08 Grand Total $940,906.73 Additional Cost: 25 December 11, 2024 Middlesex Paving, LLC. 10801 Cosmonaut Boulevard Orlando, Florida 32824 Re: Time Extension for IFB-603616-19/BJC– Pavement Management Program for Seminole County To Whom It May Concern: Pursuant to Seminole County Purchasing Code Section 3.554(4), this notice shall serve as authorization to extend the above agreement from December 25, 2024 through March 25, 2025 as approved by the Seminole County Board of County Commissioners. Current pricing, terms and conditions shall remain the same. Please remember to keep this office up to date with a current certificate of insurance with the above contract number referenced on the certificate as required in the original, contract agreement. Appropriate County departments and divisions will be notified of this Contract extension action. Thank you for your interest in doing business with Seminole County. If you have any questions or need further assistance, please contact our office. Sincerely, Rachel Horne Procurement Analyst I cc: Public Works-Roads & Stormwater County Comptroller’s Office County Attorney’s Office Commission Records File 1301 East Second Street Sanford FL 32771 Telephone (407) 665-7116 Fax (407) 665-7956 www.seminolecountyfl.gov/purchasing 26 _________________________________________ First Amendment to IFB-603616-19/BJC Page 1 of 2 FIRST AMENDMENT TO TERM CONTRACT FOR PAVEMENT MANAGEMENT PROGRAM SERVICES (IFB-603616-19/BJC) THIS FIRST AMENDMENT is made and entered into this _____ day of ________________, 20_____, and is to that certain Agreement made and entered into on the 26th day of December, 2019, between MIDDLESEX PAVING LLC, whose principal address is 10801 Cosmonaut Boulevard, Orlando, Florida 32824, in this Amendment referred to as “CONTRACTOR”, and SEMINOLE COUNTY, a charter county and political subdivision of the State of Florida, whose address is Seminole County Services Building, 1101 E. 1st Street, Sanford, Florida 32771, in this Amendment referred to as “COUNTY”. W I T N E S S E T H: WHEREAS, CONTRACTOR and COUNTY entered into the above referenced Agreement on December 26, 2019, to provide Pavement Management Program services in Seminole County; and WHEREAS, the parties desire to amend the Agreement in order to revise the Scope of Services and Fee Structure, and to enable both parties to continue to enjoy the mutual benefits the Agreement provides; and WHEREAS, Section 21 of the Agreement provides that any amendments will be valid only when expressed in writing and duly signed by the parties. NOW, THEREFORE, in consideration of the mutual understandings and agreements contained in this First Amendment, the parties agree to amend the Agreement as follows: 1. Exhibit A of the Agreement is deleted and replaced by the new Scope of Services and Fee Structure attached to this First Amendment as Exhibit A. 27 _________________________________________ First Amendment to IFB-603616-19/BJC Page 2 of 2 2. Except as modified by this First Amendment, all terms and conditions of the original Agreement remain in full force and effect for the term of the Agreement. IN WITNESS WHEREOF, the parties have executed this First Amendment for the purposes stated above. ATTEST: MIDDLESEX PAVING LLC _____________________________ By: ____________________________________ Witness ROBERT W. PEREIRA, II ______________________________ President, Managing Member Print Name Date: __________________________________ ______________________________ Witness ______________________________ SEMINOLE COUNTY, FLORIDA _____________________________ By: ____________________________________ Witness TAMMY ROBERTS, ______________________________ Procurement Administrator Print Name Date: ____________________________________ ______________________________ Witness ______________________________ Print Name For the use and reliance of Within the authority delegated by the County Seminole County only. Manager pursuant to Section 3.554, Seminole County Administrative Code. Approved as to form and legal sufficiency. ______________________________ County Attorney GLK/lpk 5/3/23 T:\Users\Legal Secretary CSB\Purchasing 2023\IFB-603616 1am (Middlesex).docx Attachment: Exhibit A – Scope of Services and Fee Structure 28 IFB-603616-19/BJC – Pavement Management Program EXHIBIT A Scope of Services Seminole County Specification Hierarchy: All requirements set forth by this IFB contract shall adhere to the rules and conditions described in Seminole County’s General Conditions for Road, Bridge & Utility Construction http://www.seminolecountyfl.gov/fs/purchasing/pdf/800roads.pdf. In addition, the attached Supplemental Specifications for this contract shall take priority to the County’s General Condition as they are specific to the pay items and basis of payment for this contract. Bidder must be Florida Department of Transportation (FDOT) Prequalified in the following categories: Hot Plant-mixed Bituminous Courses Flexible Paving PAY ITEM NOTES GROUP I – Asphaltic Concrete Superpave Asphaltic Concrete Included in the price of asphalt will be cost of all work and materials associated with the following items: 105 Quality Control; 300 Tack, Prime and Sand. (Section 334). Basis of payment shall be under: Items No. 334-1-xx Superpave Asphaltic Concrete - per ton. Asphalt Concrete Friction Course Included in the price of asphalt will be cost of all work and materials associated with the following items: 105 Quality Control; 300 Tack, Prime and Sand. (Section 337). Basis of payment shall be under: Items No. 337-7-xx Asphalt Concrete Friction Course - per ton. Miscellaneous Asphalt Pavement Included in the price of miscellaneous asphalt will be the cost of all work and materials associated with the following items: 105 Quality Control. (Section 339). Basis of payment shall be under: Item No. 339-1 Miscellaneous Asphalt Pavement - per ton. Notes: 104 Erosion Control; 107 Litter Removal and Mowing; 110 Clearing and Grubbing; shall be included in the bid price for top lift of asphalt, and included in one of the items listed above. Prior to beginning any paving or milling activities, the Contractor is required to give 24 hour notice to the Engineer/CCEI. Amendment 1 29 IFB-603616-19/BJC – Pavement Management Program GROUP II – Sand and Seal Prime and Tack Coats for Base Courses The pay item for Prime and Sand shall be a maintenance pay item only. Basis of payment shall be per square yard. The application of Prime and Sand or Tack on paving projects shall be included in the bid price of the asphalt under the 334 and 337 pay items. (Section 916). Basis of payment shall be under: Item No. 2-1 Prime and Sand - per square yard. Asphalt Membrane Interlayer The pay item for Asphalt Membrane Interlayer includes cost of all work, materials, equipment, and incidentals associated with the application of asphalt binder material covered with a single application of aggregate, as specified in Section 341. Basis of payment shall be under: Item No. 341-1-1 Asphalt Membrane Interlayer - per square yard. GROUP III – Milling Existing Asphalt Milling Existing Asphalt Pavement (Contractor) The basis of payment for milling shall be determined by multiplying the contract unit bid price (per square yard-inch) by the required mill depth (inches) from the individual project bid solicitation. The ultimate bid price for an individual project may not exceed the set contract rate for milling multiplied by the individual project thickness in inches. The milling material under this pay item will become the property of the Contractor. (Section 327). Basis of payment shall be under: Item No. 327-70A Milling Existing Asphalt Pavement - per square yard. Milling Existing Asphalt Pavement (Yankee Lake) The basis of payment for milling shall be determined by multiplying the contract unit bid price (per square yard-inch) by the required mill depth (inches) from the individual project bid solicitation. The ultimate bid price for an individual project may not exceed the set contract rate for milling multiplied by the individual project thickness in inches. The milling material under this pay item will become the property of Seminole County, to be delivered by the Contractor to 501 Yankee Lake Rd, Sanford. (Section 327). Basis of payment shall be under: Item No. 327-70B Milling Existing Asphalt Pavement (Yankee Lake) - per square yard. Milling Existing Asphalt Pavement (Oviedo Yard) The basis of payment for milling shall be determined by multiplying the contract unit bid price (per square yard-inch) by the required mill depth (inches) from the individual project bid solicitation. The ultimate bid price for an individual project may not exceed the set contract rate for milling multiplied by the individual project thickness in inches. The milling material under this pay item will become the Amendment 1 30 IFB-603616-19/BJC – Pavement Management Program property of Seminole County, to be delivered by the Contractor to 1620 N. County Rd 426, Oviedo. (Section 327). Basis of payment shall be under: Item No. 327-70C Milling Existing Asphalt Pavement (Oviedo Yard) - per square yard. Milling Existing Asphalt Pavement (5 Points Yard) The basis of payment for milling shall be determined by multiplying the contract unit bid price (per square yard-inch) by the required mill depth (inches) from the individual project bid solicitation. The ultimate bid price for an individual project may not exceed the set contract rate for milling multiplied by the individual project thickness in inches. The milling material under this pay item will become the property of Seminole County, to be delivered by the Contractor to 4170 S. Orlando Dr. Sanford. (Section 327). Basis of payment shall be under: Item No. 327-70D Milling Existing Asphalt Pavement (5 Points Yard) - per square yard. Milling Existing Asphalt Pavement (Relocate) The basis of payment for milling shall be determined by multiplying the contract unit bid price (per square yard-inch) by the required mill depth (inches) from the individual project bid solicitation. The ultimate bid price for an individual project may not exceed the set contract rate for milling multiplied by the individual project thickness in inches. The milling material under this pay item will become the property of Seminole County and is to be delivered by the Contractor to any location specified that is within 5 miles of the project limits. (Section 327). Basis of payment shall be under: Item No. 327-70E Milling Existing Asphalt Pavement (Relocate) - per square yard. Note:  Prior to beginning any paving or milling activities, the Contractor is required to give 24 hour notice to the Engineer/CCEI. GROUP IV Temporary Retroflective Pavement Markers (RPM) Price for Temporary RPM shall include layout, materials and application of temporary RPM to supplement temporary lane lines. Payment shall be based on final measurements of RPM’s. (Section 102). Basis of payment shall be under: Item No. 102-78 Temporary Retroflective Pavement Markers - each. Amendment 1 31 IFB-603616-19/BJC – Pavement Management Program Temporary Pavement Markings Price for Temporary Pavement Markings shall include layout, materials and application of paint and/or removable tape. Payment shall be based on final measurements of removable tape, painted stripes, or painted messages. (Section 102 & 710). Basis of payment shall be under: Item No. 102-911-2 Removable Tape (White/Black) - 6" - per foot. Item No. 102-912-2 Removable Tape (Yellow) - 6" - per foot. Item No. 710-11-xxx Temporary Pavement Marking, Paint, Solid - per foot. Item No. 710-11-xxx Temporary Pavement Marking, Paint, White, Message - each. Item No. 710-11-xxx Temporary Pavement Marking, Paint, White, Arrow - each. GROUP V – Miscellaneous Items Liquidated Damages (LD) This item (LD) is a project specific item to be used with a predetermined number of contract days for time of completion. All pertinent project information, including identification of roadway type (major/minor) and number of contract days shall be included in the bid solicitation documents. Any project exceeding the allowable contract days will be subject to LD’s as determined by the Engineer/CCEI. End of Project punch list NOT completed within 30 days will be subject to LD’s as determined by the Engineer/CCEI. Time and weather shall be tracked and documented according to guidelines set by the FDOT Standard Specifications and amended in these contract documents. General Conditions Sub-Section 3.2 is amended to include Article 5-2 of the 2019 FDOT Standard Specifications for Road and Bridge Construction regarding governing order of documents. General Conditions Sub-Section 6.2.3: Work hours of 7:00 AM to 6:00 PM are amended to: 8:30 AM to 4:30 PM Monday thru Friday for daytime work, and 8:00 PM to 6:00 AM Sunday thru Thursday for nighttime work, and can be superseded by the bid solicitation documents as required. Any work performed outside of the hours stated in the bid solicitation will NOT be accepted or paid for without prior approval or authorization of the Engineer/CCEI. General Conditions Sub-Section 6.42 and 6.43: Work suspensions, contractor vacations, and holidays are NOT included in the computation of contract time and will not be considered for time extensions. General Conditions Sub-Sections 11.9.2 and 12.1.1.1.3: No days have been included in the Construction time estimate for utility adjustments. Time extensions will be granted, on a day for day basis, for delays caused by utility adjustments by others only if no other work can be completed during such time. Time extensions may be granted, on a day for day basis, for delays caused by the effects of rains or other inclement weather conditions only after 5 (five) weather days and if no other work can be completed during such time. Time extension due to weather shall be reviewed and approved by the Engineer/CCEI on a case-by-case basis. Time extensions granted under these sub-sections shall not be applied to MOT days specified in item 102-1 of the bid solicitation documents. Amendment 1 32 IFB-603616-19/BJC – Pavement Management Program It is noted that Sub-Section 6-1.3 of the 2019 FDOT Standard Specifications regarding material certifications, shall apply to this contract and shall not be superseded by the General Conditions. Payment for LD is set at a rate of (-) $500.00 for each day for minor streets/roads. Payment for LD is set at a rate of (-) $1000.00 for each day for major roads. A roadway is determined to be a minor street/road if it has an ADT less than 4,000 vehicles per day; otherwise it is considered a major road. Basis of payment shall be under: Item No. 5-1 Liquidated Damages LD (For Major Roads) – per day. Item No. 5-2 Liquidated Damages LD (For Minor Streets/Roads) – per day. Mobilization Charge These items are intended to be used for two types of mobilization. Routine mobilization on projects shall include all labor, equipment, and material specified in Section 101. The price bid for routine mobilization shall not exceed 5% of the contract total. Emergency mobilization is also included to address special 24-hour emergency circumstances only. (Section 101). Basis of payment shall be under: Item No. 101-1 Mobilization Charge - each. Item No. 101-2 Mobilization Charge for 24-hour emergency response - each. Maintenance of Traffic (MOT) The price for MOT shall be on a per day basis and shall be for a time not exceeding the MOT days specified in item 102-1 in the bid solicitation documents. Items included in this pay item will be the Arrow Board, required signs, channelizing devices, flaggers and other miscellaneous items typically required to maintain traffic. Time extensions that may be granted for delays due to utility adjustments and/or inclement weather conditions will NOT be applied to the MOT days specified in item 102-1 the bid solicitation documents. NO compensation will be made for time that exceeds the MOT days specified in item 102-1 of the bid solicitation documents. The price bid for MOT shall not exceed $1500 per day. (Section 102). Basis of payment shall be under: Item No. 102-1 Maintenance of Traffic – per day. Traffic Control Officer The use of a Traffic Control Officer is defined in Section 102-7, as approved by the Engineer/CCEI. Payment shall be per hour (2 hour minimum) and based on the hours worked by the officer as recorded by the Engineer/CCEI. (Section 102). Basis of payment shall be under: Item No. 102-14 Traffic Control Officer – per hour. Portable Changeable Message Sign (PCMS) The use of PCMS shall be at the discretion and approval of the Engineer/CCEI. Payment shall be based on the number of signs certified as installed/used on the project as recorded by the Engineer/CCEI. (Section 102). Amendment 1 33 IFB-603616-19/BJC – Pavement Management Program Basis of payment shall be under: Item No. 102-99 Portable Changeable Message Sign – each day. Rework Existing Asphalt Pavement This item is intended to make corrections to existing asphalt surfaces using indirect heat primarily to facilitate drainage and eliminate ponding on existing asphalt roadways. Basis of payment shall be under: Item No. 324-1 Rework Existing Asphalt Pavement – per square yard. Manhole and Water Valve Ring Adjustment The price of this item is for removal/replacement/installation of a manhole riser ring or water valve cover to match the final asphalt surface. (Section 425). Basis of payment shall be under: Item No. 425-6 Water Valve or Similar Cover Adjustment - each. Item No. 425-7 Manhole Ring Adjustment - each. Asphaltic Concrete Curb The price of this item is for the installation of asphalt curb. Maximum cross-sectional area of 0.5 square feet. (Section 525). Basis of payment shall be under: Item No. 525-1 Asphaltic Concrete Curb – per linear foot. GROUP VI FOB – Items Price for all items in this group will either be picked up at the asphalt plant by the County or delivered by the contractor where needed for Job Site items. (Section 320; 334 & 337). Basis of payment shall be under: Item No. 6-1 SP-12.5 Asphaltic Concrete, Traffic C – per ton. Item No. 6-2 SP-9.5 Asphaltic Concrete, Traffic C – per ton. Item No. 6-3 Asphaltic Concrete Friction Course, Traffic C, FC-12.5 (PG 76-22) – per ton. Item No. 6-4 Asphaltic Concrete Friction Course, Traffic C, FC 9.5 (PG 76-22) – per ton. Item No. 6-5 Asphalt Milling Material – per ton. Item No. 6-6 Tack Type RS-1/RS-2 – per gallon. Amendment 1 34 IFB-603616-19/BJC – Pavement Management Program GROUP VII Regular Excavation The price for this item includes the grading excavation and removal of all materials. (Section 120). Basis of payment shall be under: Items No. 120-1 Regular Excavation - per cubic yard. Embankment The price for this item includes all materials required to build an embankment. (Section 120). Basis of payment shall be under: Item No. 120-6 Embankment- per cubic yard. Flowable Fill This item is intended to fill voids, stabilize shoulders on roadway or other location that may require a method of permanently addressing areas of concern, includes all labor, equipment and materials. (Section 121). Basis of payment shall be under: Item No. 121-70 Flowable Fill – per cubic yard. Type-B Stabilization The price for Stabilized Sub-grade includes all labor, equipment and materials that will be required to construct and test a 12” Stabilized Sub-grade as specified by (Section 160). Basis of payment shall be under: Item No. 160-4 12” Type-B Stabilization LBR 40 – per square yard. Base The price for road base shall include all labor, equipment and materials that will be required to construct road base Group (1, 6, & 9). Base groups 1 and 6 shall consist of limerock (LBR 100) only. Base group 9 shall consist of limerock (LBR 100) or 6” Type B-12.5, as specified by the bid documents. (Section 285). Basis of payment shall be under: Item No. 285-xxx Base Group- x - per square yard. Performance Turf, Sod The price for this item includes all work necessary to prepare the surface and place sod in areas indicated in the bid solicitation. (Section 570). Basis of payment shall be under: Item No. 570-1-2 Performance Turf, Sod – per square yard. Amendment 1 35 IFB-603616-19/BJC – Pavement Management Program Shoulder Rework The price for this item includes the grading and mixing of roadway shoulders according to FDOT Design Standard Index 105. Sodding of shoulder rework area is included in this item. Basis of payment shall be under: Item No. 577-70 Shoulder Rework - per square yard. NOTES:  Performance Bond, Payment Bond and Materials and Workmanship Bonds will be required for this project. Amendment 1 36 IFB-603616-19/BJC - Pavement Management Program Name of Bidder:Middlesex Paving, LLC. Mailing Address:One Spestacle Pond Road, Littleton, MA 01460 Street Address:10801 Cosmonaut Blvd. City/State/Zip:Orlando, Florida 32824 Phone Number:(407) 206-0077 FAX Number:(407) 206-3558 E-Mail Address:dsocci@middlesexco.com & jmeier@middlesexco.com costs, including but not limited to: General Administrative Overhead, fringe and benefits and profit, all documentation required for operation, delivery / transportation of unit(s) to the County's delivery address, indirect costs, i.e., insurance, ect., and indirect labor costs. Group I - Asphalt Subtotal:33,646,080.00$ Group II - Sand and Seal in-place Subtotal:177,150.00$ Group III - Milling Subtotal:1,331,400.00$ Group IV - Striping Subtotal:117,390.00$ Group V - Miscellaneous Items Subtotal:171,750.00$ Group VI - Asphalt Materials (materials only)Subtotal:436,800.00$ Group VII - Earthwork Subtotal:2,152,800.00$ TOTAL BID: Performance/Payment/Material-Workmanship Bonds Costs:238,750.00$ (Do not include in Unit Costs) Part 4 Price Submittal 38,033,370.00$ Prusuant to and in compliance with the IFB Documents, the undersigned Bidder agrees to provide and furnish any and all of the labor, material, tools, equipment, incidentals and transportation services necessary to complete all of the Work required in connection with the Bid Documents for the amount hereinafter set forth. Bidder declares that the only persons or parties interested in this bid as principals are those named herein; that this bid is made without collusion with any person, firm or corperation; and he proposes and agrees, if the bid is accepted, that he / she will accept to enter into an Ageement with the COUNTY in the form set forth in the Purchase Order and solicitation Documents. The cost of the units shall include all Amendment 1 37 Group I: Asphalt Concrete and Friction Course in-place Pay Item No.Item Description 0-50 Tons/Job 0-50 Tons/Job +20 51-400 Tons/Job 51-400 Tons/Job +20%401-2000 Tons/Job 401-2000 Tons/Job +20%2001-4000 Tons/Job 2001-4000 Tons/Job 20%Over 4000 Tons/Job Over 4000 Tons/Job +20%Sum of Extended Costs 334-1-12 Superpave Asphaltic Estimated 50 Tons Estimated 50 Tons Estimated 300 Tons Estimated 300 Tons Estimated 1,800 Tons Estimated 1,800 Tons Estimated 3,800 Tons Estimated 3,800 Tons Estimated 6,000 Tons Estimated 6,000 Tons Concrete Traffic Level B $ 450.00 /Ton $ 540.00 /Ton $ 200.00 /Ton $ 240.00 /Ton $ 130.00 /Ton $ 156.00 /Ton $ 128.00 /Ton $ 153.60 /Ton $ 125.00 /Ton $ 150.00 /Ton 1,863,480.00$ Total: $ 22,500.00 Total: $ 27,000.00 Total: $ 60,000.00 Total: $ 72,000.00 Total: $ 234,000.00 Total: $ 280,800.00 Total: $ 486,400.00 Total: $ 583,680.00 Total: $ 750,000.00 Total: $ 900,000.00 334-1-13 Superpave Asphaltic Estimated 100 Tons Estimated 100 Tons Estimated 600 Tons Estimated 600 Tons Estimated 2,600 Tons Estimated 2,600 Tons Estimated 6,000 Tons Estimated 6,000 Tons Estimated 18,000 Tons Estimated 18,000 Tons Concrete Traffic Level C $ 450.00 /Ton $ 540.00 /Ton $ 200.00 /Ton $ 240.00 /Ton $ 120.00 /Ton $ 144.00 /Ton $ 118.00 /Ton $ 141.60 /Ton $ 115.00 /Ton $ 138.00 /Ton 3,906,000.00$ Total: $ 45,000.00 Total: $ 54,000.00 Total: $ 120,000.00 Total: $ 144,000.00 Total: $ 312,000.00 Total: $ 374,400.00 Total: $ 708,000.00 Total: $ 849,600.00 Total: $ 2,070,000.00 Total: $ 2,484,000.00 334-1-52 Superpave Asphaltic Estimated 50 Tons Estimated 50 Tons Estimated 300 Tons Estimated 300 Tons Estimated 1,800 Tons Estimated 1,800 Tons Estimated 3,800 Tons Estimated 3,800 Tons Estimated 6,000 Tons Estimated 6,000 Tons Concrete Traffic Level B $ 500.00 /Ton $ 600.00 /Ton $ 250.00 /Ton $ 300.00 /Ton $ 155.00 /Ton $ 186.00 /Ton $ 150.00 /Ton $ 180.00 /Ton $ 145.00 /Ton $ 174.00 /Ton 2,182,800.00$ (PG 76-22) Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 75,000.00 Total: $ 90,000.00 Total: $ 279,000.00 Total: $ 334,800.00 Total: $ 570,000.00 Total: $ 684,000.00 Total: $ 870,000.00 Total: $ 1,044,000.00 334-1-53 Superpave Asphaltic Estimated 100 Tons Estimated 100 Tons Estimated 600 Tons Estimated 600 Tons Estimated 2,600 Tons Estimated 2,600 Tons Estimated 8,000 Tons Estimated 8,000 Tons Estimated 20,000 Tons Estimated 20,000 Tons Concrete Traffic Level C $ 500.00 /Ton $ 600.00 /Ton $ 250.00 /Ton $ 300.00 /Ton $ 155.00 /Ton $ 186.00 /Ton $ 145.00 /Ton $ 174.00 /Ton $ 140.00 /Ton $ 168.00 /Ton 5,475,600.00$ (PG 76-22) Total: $ 50,000.00 Total: $ 60,000.00 Total: $ 150,000.00 Total: $ 180,000.00 Total: $ 403,000.00 Total: $ 483,600.00 Total: $ 1,160,000.00 Total: $ 1,392,000.00 Total: $ 2,800,000.00 Total: $ 3,360,000.00 334-1-57 Superpave Asphaltic Estimated 80 Tons Estimated 80 Tons Estimated 300 Tons Estimated 300 Tons Estimated 1,800 Tons Estimated 1,800 Tons Estimated 3,800 Tons Estimated 3,800 Tons Estimated 6,000 Tons Estimated 6,000 Tons Concrete Traffic Level C $ 650.00 /Ton $ 780.00 /Ton $ 325.00 /Ton $ 390.00 /Ton $ 200.00 /Ton $ 240.00 /Ton $ 180.00 /Ton $ 216.00 /Ton $ 175.00 /Ton $ 210.00 /Ton 2,692,200.00$ High Polymer Total: $ 52,000.00 Total: $ 62,400.00 Total: $ 97,500.00 Total: $ 117,000.00 Total: $ 360,000.00 Total: $ 432,000.00 Total: $ 684,000.00 Total: $ 820,800.00 Total: $ 1,050,000.00 Total: $ 1,260,000.00 337-7-82 Asphalt Concrete Estimated 100 Tons Estimated 100 Tons Estimated 400 Tons Estimated 400 Tons Estimated 2,000 Tons Estimated 2,000 Tons Estimated 6,000 Tons Estimated 6,000 Tons Estimated 8,000 Tons Estimated 8,000 Tons Friction Course Traffic Level C $ 500.00 /Ton $ 600.00 /Ton $ 250.00 /Ton $ 300.00 /Ton $ 175.00 /Ton $ 210.00 /Ton $ 175.00 /Ton $ 210.00 /Ton $ 165.00 /Ton $ 198.00 /Ton 3,444,000.00$ FC-9.5 (PG 76-22) Total: $ 50,000.00 Total: $ 60,000.00 Total: $ 100,000.00 Total: $ 120,000.00 Total: $ 350,000.00 Total: $ 420,000.00 Total: $ 1,050,000.00 Total: $ 1,260,000.00 Total: $ 1,320,000.00 Total: $ 1,584,000.00 337-7-83 Asphalt Concrete Estimated 100 Tons Estimated 100 Tons Estimated 600 Tons Estimated 600 Tons Estimated 2,600 Tons Estimated 2,600 Tons Estimated 8,000 Tons Estimated 8,000 Tons Estimated 20,000 Tons Estimated 20,000 Tons Friction Course Traffic Level C $ 500.00 /Ton $ 600.00 /Ton $ 250.00 /Ton $ 300.00 /Ton $ 160.00 /Ton $ 192.00 /Ton $ 150.00 /Ton $ 180.00 /Ton $ 145.00 /Ton $ 174.00 /Ton 5,659,200.00$ FC-12.5 (PG 76-22) Total: $ 50,000.00 Total: $ 60,000.00 Total: $ 150,000.00 Total: $ 180,000.00 Total: $ 416,000.00 Total: $ 499,200.00 Total: $ 1,200,000.00 Total: $ 1,440,000.00 Total: $ 2,900,000.00 Total: $ 3,480,000.00 337-7-85 Asphalt Concrete Estimated 50 Tons Estimated 50 Tons Estimated 300 Tons Estimated 300 Tons Estimated 1,800 Tons Estimated 1,800 Tons Estimated 3,800 Tons Estimated 3,800 Tons Estimated 6,000 Tons Estimated 6,000 Tons Friction Course Traffic Level D $ 500.00 /Ton $ 600.00 /Ton $ 250.00 /Ton $ 300.00 /Ton $ 165.00 /Ton $ 198.00 /Ton $ 155.00 /Ton $ 186.00 /Ton $ 150.00 /Ton $ 180.00 /Ton 2,263,200.00$ FC-12.5 (PG 76-22) Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 75,000.00 Total: $ 90,000.00 Total: $ 297,000.00 Total: $ 356,400.00 Total: $ 589,000.00 Total: $ 706,800.00 Total: $ 900,000.00 Total: $ 1,080,000.00 337-7-92 Asphalt Concrete Estimated 80 Tons Estimated 80 Tons Estimated 300 Tons Estimated 300 Tons Estimated 1,800 Tons Estimated 1,800 Tons Estimated 3,800 Tons Estimated 3,800 Tons Estimated 6,000 Tons Estimated 6,000 Tons Friction Course Traffic Level C $ 650.00 /Ton $ 780.00 /Ton $ 325.00 /Ton $ 390.00 /Ton $ 215.00 /Ton $ 258.00 /Ton $ 205.00 /Ton $ 246.00 /Ton $ 205.00 /Ton $ 246.00 /Ton 3,054,600.00$ FC-9.5 High Polymer Total: $ 52,000.00 Total: $ 62,400.00 Total: $ 97,500.00 Total: $ 117,000.00 Total: $ 387,000.00 Total: $ 464,400.00 Total: $ 779,000.00 Total: $ 934,800.00 Total: $ 1,230,000.00 Total: $ 1,476,000.00 337-7-93 Asphalt Concrete Estimated 80 Tons Estimated 80 Tons Estimated 400 Tons Estimated 400 Tons Estimated 1,800 Tons Estimated 1,800 Tons Estimated 3,800 Tons Estimated 3,800 Tons Estimated 6,000 Tons Estimated 6,000 Tons Friction Course Traffic Level C $ 650.00 /Ton $ 780.00 /Ton $ 325.00 /Ton $ 390.00 /Ton $ 210.00 /Ton $ 252.00 /Ton $ 200.00 /Ton $ 240.00 /Ton $ 200.00 /Ton $ 240.00 /Ton 3,024,000.00$ FC-12.5 High Polymer Total: $ 52,000.00 Total: $ 62,400.00 Total: $ 130,000.00 Total: $ 156,000.00 Total: $ 378,000.00 Total: $ 453,600.00 Total: $ 760,000.00 Total: $ 912,000.00 Total: $ 1,200,000.00 Total: $ 1,440,000.00 339-1 Miscellaneous Asphalt Estimated 50 Tons Estimated 50 Tons Estimated 200 Tons Estimated 200 Tons Pavement $ 350.00 /Ton $ 420.00 /Ton $ 250.00 /Ton $ 300.00 /Ton 81,000.00$ Total: $ 17,500.00 Total: $ 21,000.00 Total: $ 50,000.00 Total: $ 60,000.00 33,646,080.00$ Company Name: Middlesex Paving, LLC. IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials TOTAL FOR GROUP I Amendment 1 38 Group II: Sand and Seal in-place Pay Item No.Item Description 0-1000 SY/Job 0-1000 SY/Job +20%1001-2000 SY/Job 1001-2000 SY/Job +20%2001-3000 SY/Job 2001-3000 SY/Job +20%Over 3000 SY/Job Over 3000 SY/Job +20%Sum of Extended Costs 2-1 Prime and Sand Estimated 500 SY Estimated 500 SY Estimated 1500 SY Estimated 1500 SY Estimated 2500 SY Estimated 2500 SY Estimated 3500 SY Estimated 3500 SY $ 5.00 /SY $ 6.00 /SY $ 2.50 /SY $ 3.00 /SY $ 1.50 /SY $ 1.80 /SY $ 0.75 /SY $ 0.90 /SY 15,150.00$ (Section 916)Total: $ 2,500.00 Total: $ 3,000.00 Total: $ 3,750.00 Total: $ 4,500.00 Total: $ 3,750.00 Total: $ 4,500.00 Total: $ 2,625.00 Total: $ 3,150.00 341-1-1 Asphalt Membrane Estimated 500 SY Estimated 500 SY Estimated 1500 SY Estimated 1500 SY Estimated 2500 SY Estimated 2500 SY Estimated 3500 SY Estimated 3500 SY Interlayer $ 50.00 /SY $ 60.00 /SY $ 25.00 /SY $ 30.00 /SY $ 15.00 /SY $ 18.00 /SY $ 10.00 /SY $ 12.00 /SY 162,000.00$ (Section 341)Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 37,500.00 Total: $ 45,000.00 Total: $ 37,500.00 Total: $ 45,000.00 Total: $ 35,000.00 Total: $ 42,000.00 177,150.00$ Company Name: Middlesex Paving, LLC. IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials TOTAL FOR GROUP II Amendment 1 39 Group III: Milling Existing Asphalt Pavement in-place Pay Item No.Item Description 0-1000 SY/Job 0-1000 SY/Job +20%1001-2000 SY/Job 1001-2000 SY/Job +20% 2001-3000 SY/Job 2001-3000 SY/Job +20%Over 3000 SY/Job Over 3000 SY/Job +20%Sum of Extended Costs 327-70-A Milling Existing Asphalt Pvmt.Estimated 1,000 SY Estimated 1,000 SY Estimated 2,000 SY Estimated 2,000 SY Estimated 8,000 SY Estimated 8,000 SY Estimated 30,000 SY Estimated 30,000 SY (Contractor's Plant) Milled Material becomes $ 15.00 /SY Inch $ 18.00 /SY Inch $ 8.50 /SY Inch $ 10.20 /SY Inch $ 5.75 /SY Inch $ 6.90 /SY Inch $ 4.25 /SY Inch $ 5.10 /SY Inch 246,600.00$ property of the Contractor Total: $ 15,000.00 Total: $ 18,000.00 Total: $ 17,000.00 Total: $ 20,400.00 Total: $ 46,000.00 Total: $ 55,200.00 Total: $ 127,500.00 Total: $ 153,000.00 327-70-B Milling Existing Asphalt Pvmt.Estimated 1,000 SY Estimated 1,000 SY Estimated 3,000 SY Estimated 3,000 SY Estimated 10,000 SY Estimated 10,000 SY Estimated 40,000 SY Estimated 40,000 SY (Yankee Lake Yard) Milled Matlerial delivered to:$ 15.00 /SY Inch $ 18.00 /SY Inch $ 8.50 /SY Inch $ 10.20 /SY Inch $ 5.50 /SY Inch $ 6.60 /SY Inch $ 4.75 /SY Inch $ 5.70 /SY Inch 342,600.00$ 501 Yankee Lake Rd. Sanford FL, 32771 Total: $ 15,000.00 Total: $ 18,000.00 Total: $ 25,500.00 Total: $ 30,600.00 Total: $ 55,000.00 Total: $ 66,000.00 Total: $ 190,000.00 Total: $ 228,000.00 327-70-C Milling Existing Asphalt Pvmt.Estimated 1,000 SY Estimated 1,000 SY Estimated 4,000 SY Estimated 4,000 SY Estimated 12,000 SY Estimated 12,000 SY Estimated 50,000 SY Estimated 50,000 SY (Oviedo Yard) Milled Material delivered to:$ 15.00 /SY Inch $ 18.00 /SY Inch $ 8.50 /SY Inch $ 10.20 /SY Inch $ 5.75 /SY Inch $ 6.90 /SY Inch $ 4.75 /SY Inch $ 5.70 /SY Inch 426,600.00$ 1620 N. County Rd 426 Oviedo, FL 32765 Total: $ 15,000.00 Total: $ 18,000.00 Total: $ 34,000.00 Total: $ 40,800.00 Total: $ 69,000.00 Total: $ 82,800.00 Total: $ 237,500.00 Total: $ 285,000.00 327-70-D Milling Existing Asphalt Pvmt.Estimated 1,000 SY Estimated 1,000 SY Estimated 2,000 SY Estimated 2,000 SY Estimated 6,000 SY Estimated 6,000 SY Estimated 20,000 SY Estimated 20,000 SY (5 Points Yard) Milled Material delivered to:$ 15.00 /SY Inch $ 18.00 /SY Inch $ 8.50 /SY Inch $ 10.20 /SY Inch $ 5.75 /SY Inch $ 6.90 /SY Inch $ 4.75 /SY Inch $ 5.70 /SY Inch 193,800.00$ 4170 S. Orlando Drive Sanford FL, 32773 Total: $ 15,000.00 Total: $ 18,000.00 Total: $ 17,000.00 Total: $ 20,400.00 Total: $ 34,500.00 Total: $ 41,400.00 Total: $ 95,000.00 Total: $ 114,000.00 327-70-E Milling Existing Asphalt Pvmt.Estimated 1,000 SY Estimated 1,000 SY Estimated 2,000 SY Estimated 2,000 SY Estimated 4,000 SY Estimated 4,000 SY Estimated 10,000 SY Estimated 10,000 SY (Relocate) Milled Material delivered to:$ 15.00 /SY Inch $ 18.00 /SY Inch $ 8.50 /SY Inch $ 10.20 /SY Inch $ 5.50 /SY Inch $ 6.60 /SY Inch $ 4.75 /SY Inch $ 5.70 /SY Inch 121,800.00$ Location within 5 miles of Project Limits Total: $ 15,000.00 Total: $ 18,000.00 Total: $ 17,000.00 Total: $ 20,400.00 Total: $ 22,000.00 Total: $ 26,400.00 Total: $ 47,500.00 Total: $ 57,000.00 1,331,400.00$ Company Name: Middlesex Paving, LLC. Road Construction Products & Related Materials IFB-603616-19/BJC - Pavement Management Program Services TOTAL FOR GROUP III Amendment 1 40 Group IV: Temporary Pavement Marking in-place Pay Item No.Item Description Estimated Qty.Units Unit Cost Unit Cost +20%Sum of Extended Cost 102-78 Temporary Retroreflective Pavement Markers 2,000 EA 4.50$ 5.40$ 10,800.00$ 102-911-2 Removable Tape, White/Black, Solid, 6"1,000 LF 2.50$ 3.00$ 3,000.00$ 102-912-2 Removable Tape, Yellow, Solid, 6"1,000 LF 2.50$ 3.00$ 3,000.00$ 710-11-121 Temporary Pavement Markings, Paint, White, Solid, 6"20,000 LF 0.75$ 0.90$ 18,000.00$ 710-11-123 Temporary Pavement Markings, Paint, White, Solid, 12"4,000 LF 2.00$ 2.40$ 9,600.00$ 710-11-125 Temporary Pavement Markings, Paint, White, Solid, 24"2,000 LF 4.00$ 4.80$ 9,600.00$ 710-11-221 Temporary Pavement Markings, Paint, Yellow, Solid, 6"30,000 LF 0.75$ 0.90$ 27,000.00$ 710-11-224 Temporary Pavement Markings, Paint, Yellow, Solid, 18"2,000 LF 3.50$ 4.20$ 8,400.00$ 710-11-160-B Temporary Pavement Markings, Paint, White, Message, "SCHOOL"20 EA 150.00$ 180.00$ 3,600.00$ 710-11-160-C Temporary Pavement Markings, Paint, White, Message, "MERGE"5 EA 150.00$ 180.00$ 900.00$ 710-11-160-E Temporary Pavement Markings, Paint, White, Message, "RIGHT"10 EA 150.00$ 180.00$ 1,800.00$ 710-11-160-F Temporary Pavement Markings, Paint, White, Message, "TRIAL"5 EA 150.00$ 180.00$ 900.00$ 710-11-160-G Temporary Pavement Markings, Paint, White, Message, "XING"5 EA 150.00$ 180.00$ 900.00$ 710-11-160-H Temporary Pavement Markings, Paint, White, Message, "LEFT"10 EA 150.00$ 180.00$ 1,800.00$ 710-11-160-J Temporary Pavement Markings, Paint, White, Message, "TURN"5 EA 150.00$ 180.00$ 900.00$ 710-11-160-K Temporary Pavement Markings, Paint, White, Message, "LANE"5 EA 150.00$ 180.00$ 900.00$ 710-11-160-L Temporary Pavement Markings, Paint, White, Message, "ONLY"10 EA 150.00$ 180.00$ 1,800.00$ 710-11-160-P Temporary Pavement Markings, Paint, White, Message, "RXR"20 EA 150.00$ 180.00$ 3,600.00$ 710-11-170 Temporary Pavement Markings, Paint, White, Arrow (Single)50 EA 150.00$ 180.00$ 9,000.00$ 710-11-170-A Temporary Pavement Markings, Paint, White, Arrow (Turn & Thru)10 EA 150.00$ 180.00$ 1,800.00$ 710-11-180 Temporary Pavement Markings, Paint, White, Yeild Line 10 LF 7.50$ 9.00$ 90.00$ 117,390.00$ Company Name: Middlesex Paving, LLC. IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials TOTAL FOR GROUP IV Amendment 1 41 Group V: Misc. Items - LD's, Mobilization, MOT, Traffic Control Officer, PCMS, Rework Exist. Asph., Utility Valve & MH Adjust, Asph. Curb Pay Item No.Description Quantity Quantity +20%Sum of Extended Cost 5-1 Liquidated Damages LD (For Major Roads)Estimated 1 Each per Project Estimated 1 Each per Project (For use on Projects having a defined number of contract days for time of -1,000.00 ED -1,000.00 ED Do Not Include this Item in Bid Total completion as advertised in the individual bid solicitation for that Project.)Total: -$1,000.00 Total: -$1,000.00 5-2 Liquidated Damages LD (For Minor Streets/Roads)Estimated 1 Each per Project Estimated 1 Each per Project (For use on Projects having a defined number of contract days for time of -$500.00 ED -$500.00 ED Do Not Include this Item in Bid Total completion as advertised in the individual bid solicitation for that Project.)Total: -$500.00 Total: -$500.00 101-1 Mobilization Charge (not to exceed 5% of contract total) Estimated 1 Each per Project Estimated 1 Each per Project Includes all Labor, Equipment and Materials.Not to Exceed 5% of Contract Total Not to Exceed 5% of Contract Total Do Not Include this Item in Bid Total 101-2 Mobilization Charge for 24-hour Emergency Response. Estimated 1 EA per Responce Estimated 1 EA per Responce Includes all Labor, Equipment and Materials $ 15,000.00 /EA $ 18,000.00 /EA 15,000.00$ 102-1 Maintenance of Traffic Estimated 30 ED Estimated 30 ED Includes all Labor, Equipment and Materials. $ 1,500.00 /ED $ 1,500.00 /ED 45,000.00$ (not to exceed $1500 per day) 102-14 Traffic Control Officer Estimated 100 HR Estimated 100 HR 2 Hours Minimum + Travel Time $ 95.00 /HR $ 114.00 /EA 9,500.00$ 102-99 Portable Changeable Message Sign Estimated 1,000 ED Estimated 1,000 ED $ 35.00 /ED $ 42.00 /EA 35,000.00$ 324-1 Rework Existing Asphalt Pavement Estimated 800 SY Estimated 800 SY Using Indirect Heat $ 45.00 /SY $ 54.00 /EA 36,000.00$ 425-6 Water Valve or Similar Cover Adjustment Estimated 25 EA Estimated 25 EA $ 125.00 /EA $ 150.00 /EA 3,125.00$ 425-7 Manhole Ring Adjustment Estimated 25 EA Estimated 25 EA $ 225.00 /EA $ 270.00 /EA 5,625.00$ 525-1 Asphaltic Concrete Curb Estimated 500 LF Estimated 500 LF $ 45.00 /LF $ 54.00 /EA 22,500.00$ 171,750.00$ Company Name: Middlesex Paving, LLC. IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials TOTAL FOR GROUP V Amendment 1 42 Group VI: Asphalt Materials - FOB @ Plant and FOB to Job Site Pay Item No.Description FOB Plant FOB Plant FOB Job Site FOB Job Site Sum of Extended Cost 6-1 SP-12.5 Hot Mix Asphaltic Concrete Estimated 1000 Tons Estimated 1000 Tons Estimated 200 Tons Estimated 200 Tons Traffic Level C $ 75.00 /Ton $ 90.00 /Ton $ 95.00 /Ton $ 114.00 /Ton 112,800.00$ (Section 334)Total: $ 75,000.00 Total: $ 90,000.00 Total: $ 19,000.00 Total: $ 22,800.00 6-2 SP-9.5 Hot Mix Asphaltic Concrete Estimated 1000 Tons Estimated 1000 Tons Estimated 200 Tons Estimated 200 Tons Traffic Level C $ 80.00 /Ton $ 96.00 /Ton $ 100.00 /Ton $ 120.00 /Ton 120,000.00$ (Section 334)Total: $ 80,000.00 Total: $ 96,000.00 Total: $ 20,000.00 Total: $ 24,000.00 6-3 Asphalt Concrete Friction Course Estimated 200 Tons Estimated 200 Tons Estimated 200 Tons Estimated 200 Tons Traffic Level C $ 125.00 /Ton $ 150.00 /Ton $ 150.00 /Ton $ 180.00 /Ton 66,000.00$ FC-12.5 (PG 76-22) (Section 337)Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 30,000.00 Total: $ 36,000.00 6-4 Asphalt Concrete Friction Course Estimated 200 Tons Estimated 200 Tons Estimated 200 Tons Estimated 200 Tons Traffic Level C $ 125.00 /Ton $ 150.00 /Ton $ 150.00 /Ton $ 180.00 /Ton 66,000.00$ FC-9.5 (PG 76-22) (Section 337)Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 30,000.00 Total: $ 36,000.00 6-5 Asphalt Milling Material Estimated 500 Tons Estimated 500 Tons Estimated 500 Tons Estimated 500 Tons $ 40.00 /Ton $ 48.00 /Ton $ 60.00 /Ton $ 72.00 /Ton 60,000.00$ Total: $ 20,000.00 Total: $ 24,000.00 Total: $ 30,000.00 Total: $ 36,000.00 6-6 Tack Type RS-1/RS-2 Estimated 1000 Gallons Estimated 1000 Gallons $ 10.00 /Gal $ 12.00 /Ton 12,000.00$ (Section 300)Total: $ 10,000.00 Total: $ 12,000.00 436,800.00$ Company Name: Middlesex Paving, LLC. IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials TOTAL FOR GROUP VI Amendment 1 43 Group VII: Earthwork Pay Item No.Description 0-50 CY/Job 0-50 CY/Job +20%51-100 CY/Job 51-100 CY/Job +20%101-500 CY/Job 101-500 CY/Job +20%Over 500 CY/Job Over 500 CY/Job +20%Sum of Extended Cost 120-1 Regular Excavation Estimated 50 CY Estimated 50 CY Estimated 100 CY Estimated 100 CY Estimated 500 CY Estimated 500 CY Estimated 800 CY Estimated 800 CY $ 150.00 /CY $ 180.00 /CY $ 75.00 /CY $ 90.00 /CY $ 50.00 /CY $ 60.00 /CY $ 35.00 /CY $ 42.00 /CY 81,600.00$ Total: $ 7,500.00 Total: $ 9,000.00 Total: $ 7,500.00 Total: $ 9,000.00 Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 28,000.00 Total: $ 33,600.00 120-6 Embankment Estimated 50 CY Estimated 50 CY Estimated 100 CY Estimated 100 CY Estimated 500 CY Estimated 500 CY Estimated 800 CY Estimated 800 CY $ 150.00 /CY $ 180.00 /CY $ 100.00 /CY $ 120.00 /CY $ 50.00 /CY $ 60.00 /CY $ 45.00 /CY $ 54.00 /CY 94,200.00$ Total: $ 7,500.00 Total: $ 9,000.00 Total: $ 10,000.00 Total: $ 12,000.00 Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 36,000.00 Total: $ 43,200.00 121-70 Flowable Fill Estimated 50 CY Estimated 50 CY Estimated 100 CY Estimated 100 CY $ 400.00 /CY $ 480.00 /CY $ 300.00 /CY $ 360.00 /CY 60,000.00$ Total: $ 20,000.00 Total: $ 24,000.00 Total: $ 30,000.00 Total: $ 36,000.00 160-4 12 " Type B Stabilization Estimated 500 SY Estimated 500 SY Estimated 2000 SY Estimated 2000 SY Estimated 3000 SY Estimated 3000 SY Estimated 4000 SY Estimated 4000 SY LBR 40 $ 35.00 /SY $ 42.00 /CY $ 32.00 /SY $ 38.40 /CY $ 28.00 /SY $ 33.60 /CY $ 25.00 /SY $ 30.00 /CY 318,600.00$ Total: $ 17,500.00 Total: $ 21,000.00 Total: $ 64,000.00 Total: $ 76,800.00 Total: $ 84,000.00 Total: $ 100,800.00 Total: $ 100,000.00 Total: $ 120,000.00 285-701 Base Group 01 Estimated 500 SY Estimated 500 SY Estimated 1000 SY Estimated 1000 SY Estimated 1500 SY Estimated 1500 SY Estimated 2000 SY Estimated 2000 SY (4" Limerock LBR 100) $ 35.00 /SY $ 42.00 /CY $ 25.00 /SY $ 30.00 /CY $ 22.00 /SY $ 26.40 /CY $ 22.00 /SY $ 26.40 /CY 143,400.00$ Total: $ 17,500.00 Total: $ 21,000.00 Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 33,000.00 Total: $ 39,600.00 Total: $ 44,000.00 Total: $ 52,800.00 285-706 Base Group 06 Estimated 500 SY Estimated 500 SY Estimated 1000 SY Estimated 1000 SY Estimated 1500 SY Estimated 1500 SY Estimated 2000 SY Estimated 2000 SY (8" Limerock LBR 100) $ 45.00 /SY $ 54.00 /CY $ 42.00 /SY $ 50.40 /CY $ 38.00 /SY $ 45.60 /CY $ 38.00 /SY $ 45.60 /CY 237,000.00$ Total: $ 22,500.00 Total: $ 27,000.00 Total: $ 42,000.00 Total: $ 50,400.00 Total: $ 57,000.00 Total: $ 68,400.00 Total: $ 76,000.00 Total: $ 91,200.00 285-709-A Base Group 09 Estimated 500 SY Estimated 500 SY Estimated 1000 SY Estimated 1000 SY Estimated 1500 SY Estimated 1500 SY Estimated 2000 SY Estimated 2000 SY (10" Limerock LBR 100) $ 60.00 /SY $ 72.00 /CY $ 55.00 /SY $ 66.00 /CY $ 50.00 /SY $ 60.00 /CY $ 50.00 /SY $ 60.00 /CY 312,000.00$ Total: $ 30,000.00 Total: $ 36,000.00 Total: $ 55,000.00 Total: $ 66,000.00 Total: $ 75,000.00 Total: $ 90,000.00 Total: $ 100,000.00 Total: $ 120,000.00 285-709-B Base Group 09 Estimated 500 SY Estimated 500 SY Estimated 2000 SY Estimated 2000 SY Estimated 3000 SY Estimated 3000 SY Estimated 4000 SY Estimated 4000 SY (6'' Type B-12.5) $ 75.00 /SY $ 90.00 /CY $ 65.00 /SY $ 78.00 /CY $ 60.00 /SY $ 72.00 /CY $ 55.00 /SY $ 66.00 /CY 681,000.00$ Total: $ 37,500.00 Total: $ 45,000.00 Total: $ 130,000.00 Total: $ 156,000.00 Total: $ 180,000.00 Total: $ 216,000.00 Total: $ 220,000.00 Total: $ 264,000.00 570-1-2 Performance Turf, Sod Estimated 500 SY Estimated 500 SY Estimated 1000 SY Estimated 1000 SY Estimated 1500 SY Estimated 1500 SY Estimated 2000 SY Estimated 2000 SY $ 20.00 /SY $ 24.00 /CY $ 18.00 /SY $ 21.60 /CY $ 15.00 /SY $ 18.00 /CY $ 14.00 /SY $ 16.80 /CY 94,200.00$ Total: $ 10,000.00 Total: $ 12,000.00 Total: $ 18,000.00 Total: $ 21,600.00 Total: $ 22,500.00 Total: $ 27,000.00 Total: $ 28,000.00 Total: $ 33,600.00 577-70 Shoulder Rework Estimated 500 SY Estimated 500 SY Estimated 1000 SY Estimated 1000 SY Estimated 1500 SY Estimated 1500 SY Estimated 2000 SY Estimated 2000 SY $ 30.00 /SY $ 36.00 /CY $ 25.00 /SY $ 30.00 /CY $ 22.00 /SY $ 26.40 /CY $ 18.00 /SY $ 21.60 /CY 130,800.00$ Total: $ 15,000.00 Total: $ 18,000.00 Total: $ 25,000.00 Total: $ 30,000.00 Total: $ 33,000.00 Total: $ 39,600.00 Total: $ 36,000.00 Total: $ 43,200.00 2,152,800.00$ Company Name: Middlesex Paving, LLC. IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials TOTAL FOR GROUP VII Amendment 1 44 Totals: Group I thru VII Group No.Group Description Totals Group I Asphalt Concrete and Friction Course in-place 33,646,080.00$ Group II Sand and Seal in-place 177,150.00$ Group III Milling Existing Asphalt Pavement in-place 1,331,400.00$ Group IV Temporary Pavement Marking in-place 117,390.00$ Group V Misc. Items - LD's, MOB, MOT, Traffic Control Officer, PCMS, Valve & MH Adjust, Asph. Curb 171,750.00$ Group VI Asphalt Materials - FOB @ Plant and FOB to Job Site 436,800.00$ Group VII Earthwork 2,152,800.00$ 38,033,370.00$ Company Name: Middlesex Paving, LLC. TOTAL GROUP I THRU VII IFB-603616-19/BJC - Pavement Management Program Services Road Construction Products & Related Materials Amendment 1 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63