Loading...
HomeMy WebLinkAbout2024 12 09 Consent 307 - Storm Sewer Pipelining on Tuscora DriveCONSENT AGENDA ITEM 307 CITY COMMISSION AGENDA | DECEMBER 9, 2024 REGULAR MEETING TITLE Storm Sewer Pipelining on Tuscora Drive SUMMARY Over many years the original storm sewer system on Tuscora Drive has settled, causing the storm sewer pipe joints to separate and result in the gradual collapse of the roadway above. With video inspection confirmation of this current condition, Flotech Environmental proposes the installation of a cast in place pipe liner which has been proven to be a suitable, economical means of addressing these failed conditions throughout the City. The repair entails the installation of a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with ASTM F-121. The City has a piggyback rider in place with Flotech Environment. FUNDING SOURCE This is budgeted under city wide stormwater infrastructure improvements within the 3rd Generations Sales Tax Fund in CIP. RECOMMENDATION Staff seeks approval from the Commission for the pipelining of 155 LF of 36-inch and 42-inch cast in place pipe (CIPP) for a failed storm sewer pipe located on Tuscora Drive. Additionally, Staff recommends authorizing the interim City Manager and the City Attorney to prepare and execute any and all applicable documents consistent with this agenda item. 75 City of Winter Springs - 696 Tuscora Drive - 36" & 42" CIPP City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708 United States Kevin Monser kmmonser@winterspringsfl.org (407) 327-6567 Reference: 20241202-155320241 Quote created: December 2, 2024 Quote expires: January 1, 2025 Quote created by: Luis Ferre Business Development Associate luis.ferre@flotechllc.com +17862028723 76 Comments from Luis Ferre Project Owner: City of Winter Springs Project/Contract: Number: N/A Project Name: SW Relining FY24 (Stormwater Relining FY24) Project General Contractor: N/A Project County: Seminole Region: Central Job-site Address: 696 Tuscora Dr, Winter Springs, FL 32708 Onsite Point of Contact: Kevin Mosner Maps/Plans Provided: [Yes] Technical Specifications: ASTM F1216-22, NASSCO PACP Certified Payroll Applicable: [No] Heavy Construction Wage Applicable: [No] Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final deliverables Billing Instructions: Include PO# in each invoice. AP / Billing contact email: kmmonser@winterspringsfl.org Scope of Work:  36" CIPP, 35 LF & 42" CIPP,  155 LF. One 36" and 42" transition stormwater pipe liner to be installed at this location. Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with ASTM F-1216. Includes pre / post video inspection. Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning, asphalt cutting, grounds restoration, paving, excavation. Flotech Environmental is a certified SBE, DBE, MBE, CBE company. 77 Products & Services Item & Description Quantity Unit Price Total CIPP, 36" (15mm)35 $404.00 $14,140.00 CIPP, 42" (18mm)155 $486.00 $75,330.00 42" Pipe Diameter By-Pass / Pumping / Dewatering Where Needed 1 $0.01 $0.01 MOT: Local Roads 1 $0.01 $0.01 One-time subtotal $89,470.02 Total $89,470.02 LF. LF LF LF. 78