HomeMy WebLinkAbout2024 12 09 Consent 307 - Storm Sewer Pipelining on Tuscora DriveCONSENT AGENDA ITEM 307
CITY COMMISSION AGENDA | DECEMBER 9, 2024 REGULAR MEETING
TITLE
Storm Sewer Pipelining on Tuscora Drive
SUMMARY
Over many years the original storm sewer system on Tuscora Drive has settled,
causing the storm sewer pipe joints to separate and result in the gradual collapse of
the roadway above. With video inspection confirmation of this current condition,
Flotech Environmental proposes the installation of a cast in place pipe liner which has
been proven to be a suitable, economical means of addressing these failed conditions
throughout the City. The repair entails the installation of a resin impregnated felt tube
pipe liner into the host pipe, and cure in place, in accordance with ASTM F-121. The
City has a piggyback rider in place with Flotech Environment.
FUNDING SOURCE
This is budgeted under city wide stormwater infrastructure improvements within the
3rd Generations Sales Tax Fund in CIP.
RECOMMENDATION
Staff seeks approval from the Commission for the pipelining of 155 LF of 36-inch and
42-inch cast in place pipe (CIPP) for a failed storm sewer pipe located on Tuscora
Drive. Additionally, Staff recommends authorizing the interim City Manager and the
City Attorney to prepare and execute any and all applicable documents consistent with
this agenda item.
75
City of Winter Springs - 696 Tuscora Drive -
36" & 42" CIPP
City of Winter Springs
1126 East State Road 434
Winter Springs, FL 32708
United States
Kevin Monser
kmmonser@winterspringsfl.org
(407) 327-6567
Reference: 20241202-155320241
Quote created: December 2, 2024
Quote expires: January 1, 2025
Quote created by: Luis Ferre
Business Development Associate
luis.ferre@flotechllc.com
+17862028723
76
Comments from Luis Ferre
Project Owner: City of Winter Springs
Project/Contract: Number: N/A
Project Name: SW Relining FY24 (Stormwater Relining FY24)
Project General Contractor: N/A
Project County: Seminole
Region: Central
Job-site Address: 696 Tuscora Dr, Winter Springs, FL 32708
Onsite Point of Contact: Kevin Mosner
Maps/Plans Provided: [Yes]
Technical Specifications: ASTM F1216-22, NASSCO PACP
Certified Payroll Applicable: [No]
Heavy Construction Wage Applicable: [No]
Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final
deliverables
Billing Instructions: Include PO# in each invoice.
AP / Billing contact email: kmmonser@winterspringsfl.org
Scope of Work: 36" CIPP, 35 LF & 42" CIPP, 155 LF.
One 36" and 42" transition stormwater pipe liner to be installed at this location.
Install a resin impregnated felt tube pipe liner into the host pipe, and cure in place, in accordance with
ASTM F-1216. Includes pre / post video inspection.
Exclusions: root removal, baffle removal / reinstatement, grout repairs, joint sealing, heavy cleaning,
asphalt cutting, grounds restoration, paving, excavation.
Flotech Environmental is a certified SBE, DBE, MBE, CBE company.
77
Products & Services
Item & Description Quantity Unit
Price
Total
CIPP, 36" (15mm)35 $404.00 $14,140.00
CIPP, 42" (18mm)155 $486.00 $75,330.00
42" Pipe Diameter By-Pass / Pumping / Dewatering Where
Needed
1 $0.01 $0.01
MOT: Local Roads 1 $0.01 $0.01
One-time subtotal $89,470.02
Total $89,470.02
LF.
LF
LF
LF.
78