Loading...
HomeMy WebLinkAbout2024 11 18 Awards and Presnetations 101 - Kimley-Horn Update on "Continuing Assessment, Planning and Engineering Services for Stormwater System Improvement and Design"AWARDS AND PRESENTATIONS ITEM 101 CITY COMMISSION AGENDA | NOVEMBER 18, 2024 REGULAR MEETING TITLE Kimley-Horn Update on "Continuing Assessment, Planning and Engineering Services for Stormwater System Improvement and Design" SUMMARY Kimley-Horn will provide the Commission an update on their ongoing efforts in finalizing the second phase of their "Continuing Assessment, Planning and Engineering Services for Stormwater System Improvement and Design" contract involving data collection, and moving onward into the third phase involving meaningful conceptual designs to address the localized flooding. FUNDING SOURCE RECOMMENDATION No required action by Commission. 6 7 Scope of Work Phase 1 – Drainage System Inventory1 Phase 2 – Drainage System Maintenance and Retrofit Improvement2 Phase 3 – Maintenance Equipment and Manpower3 Phase 4 – Stormwater Capital Improvement Program 4 Phase 5 – Stormwater Capital Improvement Funding5 Phase 6 – Concept Designs and Cost Estimates6 •Inventory Creation •Inspection •Capital Improvement Planning •Engineering •Surveying •Geotechnical Investigations •Conceptual Drainage Designs •Utility Rate Studies 8 9 10 Current Status •Completed Phase 1 – Inventory of Public Infrastructure •Drainage structure condition, pipe size, type, condition •Sedimentation at entry and inside structures and at outfalls •Right-of-Entry Requests prepared for Private Property and HOA’s 11 •Asphalt, sidewalk, and curb inspections completed •Obtained Published Basin Studies •Coordinating with Seminole County on Current Basin Studies •Capital Improvements will be identified and compiled •Draft County Studies will be available in Summer 2025 •Initiated Survey Requests for Flood Prone Areas for Conceptual Designs •Focus Areas •Drainage Structure and Storm Pipe Maintenance •Swale, Pond, and Channel Maintenance •Flooding Problems Phase 2 – Drainage System Maintenance and Retrofit Improvement Current Status 2 12 Stormwater Inventory •GIS Maps 13 •Pavement failure, local ponding Roadway Impacts 14 •Gathering Data from City •List of current equipment, general condition, and replacement date •Replacement cost •List of current stormwater employees, pay grades, and current positions •How many full-time employees are assigned and available? •All possible pay grades and positions for future hires •List of Primary Activities Performed •Level of Service - Frequency Phase 3 – Maintenance Equipment and Manpower - Raftelis Next Steps 3 15 Questions 16