Loading...
HomeMy WebLinkAboutKimley-Horn and Associates, Inc. - Lift Station 7W Construction Services - 2024 10 18September 16, 2024 BHal Iftikhar Utilities Director City of Winter Springs 400 Old Sanford Oviedo Road Winter Springs, FL 32708 Re: Lift Station 7W —Limited Construction Phase Services Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "Consultant") is pleased to submit this letter scope (the "Scope") to the City of Winter Springs, FL ("City") for providing construction services for Lift Station 7W Replacement Construction Contract. This Scope is for a work release under RFP #01-21 Civil Engineering Continuing Service Contract. Project Understanding The existing lift station is a triplex, buried -can style lift station that was installed in1995. There have been a few modifications since its installation which has allowed the lift station to continue to operate for 27 years. The existing on -site generator was repurposed and is capable of providing secondary power to the lift station and Water Treatment Plant #3. This generator is outdated and parts to maintain the equipment are not readily available. The design and construction scope includes abandoning the existing wet well, dry well, and generator. Constructing new gravity sanitary runs, wet well, discharge piping, electrical building and installing the new generator, variable frequency drives (VFDs) and additional electrical equipment. In general, Kimley-Horn's services under this project involve provision of the construction services related to the improvements described herein. Specific descriptions of the various phases and tasks are presented below. Scope of Services Task 1 — Construction Phase Services and Certifications A. Administration and Project Management: Provide up to 4 hours per week (on average) during the 14 months (56 weeks) of construction, December 2024 through December 2025 for Project Manager/Engineer coordination and project management assistance. Be Pre- Construction Conference: Kimley-Horn will attend and lead a Pre -Construction Conference prior to commencement of Work at the Site. Kimley-Horn will provide the selected contractor with three complete sets of project documents along with copies of the appropriate permits, notices and documents. Kimley-Horn will prepare a Notice to Proceed for issuance by the City. C. Site visits, Observation of Construction, and Progress Meetings: Kimley-Horn will provide site visits and progress meetings during construction activities twice per month of active construction. Such visits and site observations by Kimley-Horn are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on our exercise of professional judgment. Based on information obtained during such visits and such observations, we will evaluate whether Contractor's work is proceeding in accordance with the Contract Documents, and provide specific notifications to the City based on progress of the Work. Additional site visits for the following critical activities have been included. a. Attend lift station start-up, 2 days b. Attend generator start-up, 2 days c. Observe connection to existing 204ch force main, 2 days D. Clarifications and Interpretations: Kimley-Horn will respond to reasonable and appropriate Contractor requests for information, and issue necessary clarifications and interpretations of the Contract Documents to the City as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by City. E. Change Orders: Kimley-Horn will review and make recommendations related to Change Order requests submitted or proposed by the Contractor. F. Shop Drawings and Samples: Kimley-Horn will review and approve, or take other appropriate action in respect to Shop Drawings, Samples, and other data which the Contractor is required to submit. Our reviews will be focused on the submittal's conformance with the information given in the Contract Documents. Such review, approvals, or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, procedures of construction, or to related safety precautions and programs. Shop drawing review to include, but not limited to, the following materials and equipment: generator, pumps, precast electrical building, mechanical piping, electrical conduit, manholes, wet well, valves, meter, meter vault, and other electrical equipment. G. Substitutes and "or -equals": Kimley-Horn will evaluate and determine the acceptability of substitute or "or -equal" materials and equipment proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of state or local government entities. H. Substantial Completion: Kimley-Horn will, promptly after notice from Contractor that it considers the entire Work ready for its intended use, in company with City and Contractor, conduct a site visit to determine if the Work is substantially complete. Work will be considered substantially complete following satisfactory completion of all items with the exception of those identified on a final punch list developed during the substantial completion site visit and project observation. Permitting Certification Coordination: Kimley-Horn will prepare permits and close out documents for the affected regulatory agencies, complete one inspection with each agency representative per permit certification and provide written confirmation to the City for their records. The expected permit certifications are: a. Florida Department of Environmental Protection b. St. Johns River Water Management District 404 c. City ROW permit and Maintenance of Traffic Plan Review J. Final Notice of Acceptability of the Work: Kimley-Horn will conduct a final site visit to determine if the completed work is performed in accordance with the Contract Documents and the final punch list has been completed. K. Project Documentation and Record Drawings: Kimley-Horn will prepare, track and monitor logs for shop drawings, RFIs, change order requests, project deviations, spare parts list, and project images. The logs will be updated weekly and distributed to the City and Contractor for documentation of the construction activities, approvals, and requests by the Contractor. Kimley-Horn will review construction records (red -lined drawings) monthly, Operations and Maintenance manuals, and "as -built" drawings provided by the Contractor at the completion of the project. Kimley-Horn will prepare final record drawings for the City's use as the pipeline is cleared for certification and transition to service. At the completion of the project, Kimley-Horn will produce a final set of signed and sealed record drawings for the City. L. Construction Closeout Coordination: Kimley-Horn will assist with the construction closeout documents for contract closeout. Assistance with contract document closeout includes: final pay request, final releases of liens, certificates of insurance, specified equipment warranties and bonds, warranty bond, Contractors affidavit of payment of debts and claims, Contractor's affidavit of release of liens, consent of surety to final payment, video recordings, and as -built drawings. M. The construction observation fee estimate for this task is based on 24 months of active construction. During construction, Kimley-Horn will provide the following levels of service. a. Site Visits and Observations — up to 6 hours every month b. Attend up to forty-eight (48) on -site, monthly project progress/coordination meetings. c. Review of shop drawings estimated up to twenty (20) submittals d. Review of clarifications and interpretations estimated up to seven (7) submissions e. Review of up to three (3) change orders f. Review of substitutes or "or equals" estimated up to five (5) submissions N. Kimley-Horn will coordinate with the electrical engineer for the construction phase services also being provided under this contract. O. Kimley-Horn will coordinate additional field investigation of one (1) 40400t-deep geotechnical bore at the wet well location prior to installation. Additional Services: Any other services beyond those specifically stated in Task 1 above, including but not limited to the following can be included in a separate scope of services or via an amendment to this scope of services: • Additional Resident Project Representative, site inspections, and onsite observation of the construction project • Additional Site Visits beyond those listed in the scope above • Geotechnical construction verification services • Additional permit applications or certifications identified during the project construction and not listed above • Construction survey/layout and as-builts services • Additional pipe design and construction services outside of the boundary listed within the scope Information Provided by City and Contractor We shall be entitled to rely on the completeness and accuracy of all information provided by the City, the City's representatives, or the Contractor. Fee and Expenses Kimley-Horn will perform the services in Task 1 for the total lump sum fee below. Total Lump Sum Fee $ 267,327.00 Lump sum fees will be invoiced monthly based upon the overall percentage of services performed. Payment will be due within 25 days of your receipt of the invoice and should include the invoice number and Kimley-Horn project number. Kimley-Horn, in an effort to expedite invoices and reduce paper waste, submits invoices via email in an Adobe PDF format. We can also provide a paper copy via regular mail if requested. We request the City to include the invoice number and Kimley-Horn project number with all payments. Please provide the following contact information for invoices: X Please email all invoices to If you concur in all the foregoing and wish to direct us to proceed with the services, please have authorized persons execute a task authorization for this scope of services and transmit via email to Lance.Littrell(a Kimley-Horn.com. We will commence services after we have received a fully -executed task authorization. We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. I It By: Lance R. Littrell, P.E. Vice President Julia Felter, P.E. Project Manager Kimley>»Horn Authorization City ofjgVinter Springs, Florida By: InteriiA City Ma ager l0 Ig � (Date) Philip Hursh (Print or Type Name) phursh(a�winterspringsfl.org (Email Address) (Print or Type Name) ATTACHMENTA LABOR COSTS LIFT STATION 7W -CONSTRUCTION PHASE SERVICES Tasks Project Manager Analyst Senior Designer/ Technical support Clerical/ Project Admin Labor Rate $220.00 Rate $140.00 Rate $145.00 Rate $95,00 Totals Hours Costs Hours Cost Hours Cost Hours Costs Hours Costs Task1 - Construction Services 429 94 380.00 812 113 680.00 81 11 745.00 152 4 4 0.00 1698 23 2 0 Administration and Project Nlanagement 168 $36,960.00 336 $477040.00 $0.00 60 $5,700,00 Pre Construction Conference 6 $1,320.00 6 $840.00 $0.00 2 $190,00 Site Visits P\I - I/month, Analyst -2/month) 84 $18,480,00 168 $23,520.00 $0.00 28 $2,660.00 Lift station start a 12 $2,640.00 16 $2,240.00 $0.00 $0.00 Generator Start up 12 $2,640.00 16 $2,240.00 $0.00 $0,00 Connection to existing force main 12 $2,640.00 16 $2,240.00 $0.00 $0,00 Clarifications and Interpretations (7 requests) 14 $3,080.00 21 $2,940.00 21 $3,045.00 7 $665,00 Change Orders (3 requests) 15 $3,300.00 30 $4,200.00 $0,00 6 $570,00 Shop Dratvings.and Samples (20 shop drawings) 20 $4,400.00 40 $5,600.00 10 $1,450,00 20 $13900.00 Substitutes and Or -Equals (5 requests) 10 $2,200,00 15 $2,100.00 $0.00 5 $475.00 Substvttial Completion (2 visits, 2 punch lists) 24 $5,280,00 24 53,360.00 $0.00 4 $380.00 Pemitting Certifications $0,00 $0,00 $0,00 $0.00 FDEP 4 $880,00 6 $840,00 $0,00 0 $0.00 SIRWMD 4 $880,00 6 $840.00 $0.00 0 $0.00 City ROW and NOT Plan Review 4 $880.00 6 $840.00 $0.00 0 $0.00 Final Inspection Site Visit 8 $1,760.00 8 $1,120.00 $0.00 0 $0.00 Project Documentation mid Record Drmvings 18 $3,960.00 16 $2,240.00 40 $5,800.00 8 $760,00 Construction Closeout 14 $3,080.00 32 $4,480.00 10 $1,450.00 12 $1,140,00 ExpensesAMileage .and Meals (108 trips) $4,480,00 0.00 $0.00 50.00 $0.00 Electrical Engineer Construction Phase Services $0,00 40 $5,600,00 $0,00 $0.00 $24,801.98 524,801.98 Geotechnical Boring for Wet well 50.00 10 11,400.00 $0.00 $0.00 $3,800.00 $3,800.00 0.00 0.00 0.00 $0,00 Pro ectTotals 429 $94,380,00 812 $113,680.00 81 $11,745.00 152 $14,440.00 1698.00 $267,326.98 ,lectrical DesF' n Associates September 3, 2024 Julia Felten, P.E. Kimley-Horn 189 Orange Avenue, Suite 1000 Orlando, FL 32801 RE: Lift Station 7W Rehabilitation City of Winter Springs, FL Deat• Ms. Felten: We are pleased to submit our proposal for electrical and I&C engineering construction services for the above project. The following serves to provide an overview of the engineering services Electrical Design Associates (EDA) intends to furnish on the above referenced project to Kimley- Horn and provides the agreed upon sum. Your signature on this agreement will serve as your letter of intent and official notice to proceed with the referenced work. Services not specifically identified are not included (HVAC, Mechanical, Fuel, etc.). Task 1 Construction Administration Services The duration of the construction is anticipated to be 24 months. It is anticipated the City will provide construction management and construction inspection services. EDA will not provide a resident for construction services. Conformed Documents EDA will prepare conformed documents incorporating into the construction documents revisions and clarifications that occurred during the bidding phase. A digital copy, in AutoCAD format, will be provided to Kimley Horn. Pre -Construction Meeting EDA will attend the Pre -Construction Meeting with the City and Contractor. One EDA team member will attend the Meeting. Progress Meetings Appropriate EDA personnel will attend monthly construction progress meetings. One EDA team member will attend up to 24 Monthly Progress Meetings, Shop Drawings and O&M Submittals 6965 PIAZZA G12AN��E A4�ENZJE, Sv17E 311 01�,GAN�O, �'G • 32835 �9fON�E: 407-74S-S604 �'AX: 407-745-5603 Ms. Julia Felter, P.E. Page 2 September 3, 2024 EDA shall review and approve (or take other appropriate action in respect of) Shop Drawings and samples, the results of tests and inspections and other data which each Contractor is required to submit, but only for conformance with the design concept of the Project and compliance with the information given in the Contract Documents (but such review and approval or other action shall not exceed to means, methods, sequences, techniques or procedures of construction or to safety precautions and programs incident thereto); and receive and review (for general content as required by the Specifications) maintenance and operating schedules and instruction, guarantees, bonds and certificates of inspection which are to be assembled by Contractor(s) is in accordance with the Contract Documents. Up to ten (10) submittals at an average of 6 hours/submittal are budgeted for review by EDA. Requests for Information (RFIs)/Change Orders When requested by the City or the Contractor, EDA will issue technical interpretations or clarifications of the drawings or technical specifications. EDA may issue additional instructions, by means of drawings or technical specification updates, to clarify the intent of the design. Up to three (3) RFIs are included in the scope of this subtask at an average of 5 hours/submittal. If any change orders are required during construction, EDA will review up to three change orders to the contract documents. Startup and Testing I<'imley Horn will provide field support services to assist during the Startup and Testing. The budget allocation includes provision for up to two EDA project team members for up to 8 hours each. Substantial Completion Punch List Upon substantial completion of the work, up to two EDA personnel will visit the site to develop a "punch list" of items to be completed before substantial completion can be awarded to the Contractor. The punch list will be provided to the City for inclusion into the plant -wide substantial completion punch list. Final Completion and Clearance Up to one EDA personnel will visit the site to perform a single final completion inspection. Kimley Horn will submit clearance documentation to the permitting authority (as required) to obtain clearance to operate the project. Record Drawings EDA will prepare record drawings based on the Contractor's as -bunts and red lines. EDA will submit a digital PDF of the record drawings. 6965 PIAZZA G12ANn�E A4��ENv�E, S7J17�E 311 • 012,GANJ�O, �I'G • 32835 �Y9fON�E; 407-745-5604 FAX: 407-745-5603 Ms. Julia Felter, P.E. Page 3 September 3, 2024 Fee for Base Scope of Woi k Our scope of services shall include the Electrical and Instrumentation engineering services associated with the proposed project design. All mechanical engineering, including but not limited to HVAC, Plumbing, Fuel, Process, etc., to be completed by others. Services not specifically identified are not included. The attached spreadsheet provides an estimate of our anticipated work effort. Our initial fee for this work will be lump sum, billed monthly and is based on the attached estimate hand will not be billed as a separate line item. Additional fee will be submitted for any of the task items identified herein not completed under the initial fee identified above. Work shall be based on the following: Task 1 —Construction Administration Services Total: Very truly youc•s, William C. Nelson, P.E. ACCEPTED KH-lit -O0 l l G $ 24,801.98 $ 24,801.98 DATE 6965 PIAZZA �12ANJ��E A'i�EN21E, S�J17E 311 • 012,LAN�O, �I'G • 32835 �.7fON�E: 407-745-5604 �'AX: 407-745-5603 Kimley-Horn �.. lit.. Lift Station #7W Construction Services Eye .7 r Uwiures City of Winter Springs, FL Date: 9/312024 Estimate of Work Effort & Fee Principal Senior Engineer Engine Field Supervisor Coed Technician Clarical/Adnvn Hourly Hourly Hourly Hourly Hourly Hourly Totals Rate $199.41 Rate $179.78 Rate 5 $156'O6 Rate $92.48 Rate $80.92 Rate $63.58 Tasks-Consructlon Services hours Tool hours Total hours Total hours Total hours Total hours Total hums Total Conformed Documents 1 5 199.41 2 $ 358,36 2 S 312.12 0 $ - 4 $ 323.68 1 $ 63,58 10 $ 1,257,15 Pre -Construction Meeting 1 $ 199.41 1 $ 179.18 0 $ - 0 $ - 0 5 - 0 $ - 2 $ 378.59 Progress Meetings 12 S 2,392,92 12 S 2,150.16 0 $ - 0 $ - 0 $ - 0 $ - 24 S 4.543.08 Shop Draw,ngs & O&M SVbni"Is 16 5 3,190+56 30 $ 5.375.40 10 5 1,560.60 0 $ - 0 $ - 4 S 254.32 60 $ 10,380.88 Requests for lnformabon 6 $ 1,695.28 4 $ 716.72 0 $ - 0 $ - 0 $ - 3 $ 190.74 15 $ 2,502.74 Startup and Testing 0 $ - 8 $ 1,433.44 8 S 1,248.48 0 $ - 0 $ - 1 $ 63.58 17 $ 21745+50 Substabon Completon 0 $ - 2 $ 358,36 0 $ - 2 $ 184,96 0 $ - 1 $ 63,58 5 S 606.90 Final Compiedon and Clearance 1 $ 199.41 2 S 358,36 0 $ - 0 S - 0 $ - 1 S 63,58 4 $ 621.35 Record Drawrgs 1 $ 199.41 2 $ 358,36 2 $ 312.12 2 $ 184.06 8 $ 647.36 1 $ 63,58 16 $ 1.765.79 Subtotal: 40 5 71976,40 63 S 11,288.34 22 $ 3,433.32 4 $ 369.92 12 $ 971.04 12 $ 762,96 153 $ 24,801.98 Design Total 4 $3 7,976.40 63 3 11,288,34 22 3 37433.32 4 $ 369.92 12 $ 971,04 12 S 762,96 153 $ 24,801,98