Loading...
HomeMy WebLinkAboutKimley-Horn Winter Springs Villages Connction to Reclaim Water Main Extension and Construction Services - Amendment 1 - 2024 06 26Kimley»>Horn June 12, 2024 Bilal Iftikhar Utilities Director City of Winter Springs 400 Old Sanford Oviedo Road Winter Springs, FL 32708 Re: Winter Springs Villages Connection to Reclaimed Water Main Extension and Construction Services — Amendment 1 Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "Consultant") is pleased to submit this amendment to the letter scope (Amendment 1) to the City of Winter Springs, FL ("City") for providing additional design services for Winter Springs Villages Reclaimed Water Main Extension. These additional services were prompted by the request to extend the reclaimed water main along Michael Blake Boulevard (blvd) to SR 434 to pick up additional potable water users. This results in additional survey, design, site visits, and project coordination. This Scope is for a work release under RFP #01-21 Civil Engineering Continuing Service Contract. Project Understanding The extension would create a reclaimed water main loop along Michael Blake Boulevard to SR 434. There is a reclaimed water main stub -out on Michael Blake Blvd to which this extension would connect. This extension would pass the Seminoles Crossing neighborhood and The Blake apartments giving more users access to reclaimed water. Scope of Services Task 1 —Design Services Kimley-Horn will prepare engineering design drawings for the construction of this additional pipeline extension, a length of approximately ± 3,000 LF of proposed reclaimed water main. Engineering design drawings will be submitted to the City for review at 90% and 100% design. A preliminary list of additional drawings is presented below: Civil Water Main Plan and Profiles (approx. 6 sheets) Civil Details (approx. 1 sheet) Kimley-Horn will coordinate the needed survey with the surveyor, ECHO UES, Inc., to provide a topographical survey of the existing and proposed reclaimed water main corridor. Survey will consist of the area within rights -of -way along Michael Blake Boulevard from State Road 434, along Michael Blake Boulevard prior to Fern Hammock Street. The survey documentation will include topographical information, visible improvements, manholes, inlets with top and invert elevations, existing landscaping and underground utilities. Underground utility locates from non -City utilities will be located as they are flagged by their respective owners. Further, right-of-way lines within the limits of the survey will be identified as part of the survey. Schedule Kimley-Horn will begin services upon receipt of an executed Task Order. These services will be completed as expeditiously as possible. Kimley»>Horn Method Vi Compensation Kimley-Horn will perform these services for the total lump sum fee of $65,900.00, inclusive of office overhead expenses. A breakdown of the fee by task is as follows: Task Description Lump Sum Fee 1 Design Services $381755.00 Surveyor $34,525000 Total $733280.00 Services provided under this will be invoiced on. a monthly basis. All invoices will include a description of services provided. If you concur in all the foregoing and wish to direct us to proceed with the services, please have authorized persons execute a task authorization for this scope of services and transmit via email to Julia.felter(kimley-horn.com. We will commence services after we have received a fully -executed task authorization. We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. By: Julia Felter, P.E. Project Engineering Authorization City of Winter Springs, Florida By: )irecto,rofttilities Mal Iftikhar (Print or Type Name) Biftikhar(cD,winterspringsfl.org (Email Address) Attest: -- rIsh h Tayy&di (Print or Type Name) (Date) Lance R. Littrell, P.E. Vice President