HomeMy WebLinkAbout2024 04 08 Consent 302 - Potable Water Pipe Inventory and Improvement PlanCONSENT AGENDA ITEM 302 CITY COMMISSION AGENDA | APRIL 8, 2024 REGULAR MEETING TITLE Potable Water Pipe Inventory and Improvement Plan SUMMARY The City has requested services to be provided by Kimley-Horn to create a Potable Water Pipeline Inventory and Improvement Plan which will allow the City to identify priority areas throughout the City that need pipeline replacements or improvements. Kimley-Horn will use the City’s GIS system add attributes such as age, material, recorded repairs, and associated costs to make needed improvements. From this data, a phased repair/ replacement plan will be developed. FUNDING SOURCE CIP –(410-36-3600-560650-005) $95,700.00 RECOMMENDATION City staff recommends the Commission approve Consent Agenda item for Potable Water Pipe Inventory and Improvement Plan 21 kimley-horn.com 200 South Orange Avenue, Suite 600, Orlando, FL 32801 407-898-1511 February 19, 2024 Bilal Iftikhar Director of Utilities City of Winter Springs 400 Old Sanford Oviedo Road Winter Springs, FL 32708 Re: Potable Water Pipeline Inventory and Improvement Plan Kimley-Horn and Associates, Inc. (“Kimley-Horn” or “Consultant”) is pleased to submit this letter scope (the “Scope”) to the City of Winter Springs, FL (“City”) for providing professional services to update the City’s Building and Permitting Process. This Scope is for a work release under RFP #01-21 Civil Engineering Continuing Service Contract. Project Understanding The City has a GIS system which will be utilized to create a phased improvement plan. Kimley- Horn will add layers to the GIS system that includes but not limited to age, material, number of repairs, and cost to reline or cost to replace the existing piping. These attributes will allow the City to establish a cost per year budget and identify priority areas throughout the City that need improvements. Scope of Services Task 1 – Project Management and Coordination Kimley-Horn will coordinate with the Client to schedule a project Kickoff meeting. The purpose of the meeting is to confirm overall project/property limits that the GIS program will include at full buildout along with proposed project schedule and data needs. At the meeting the initial area to be included in the first phase of data development, referred to as the sample study area will be confirmed. Based on the proposed study area, following the meeting Kimley-Horn will provide to the client a list of requested data sources, a proposed draft list of layers and attribute schema to be developed as part of the initial phase. The Client will provide Kimley Horn with all applicable resource data (CAD, GIS, survey, Excel, etc.) to be used for data collection and attributing for this Task. A. Kimley-Horn will conduct regular coordination calls/meetings with Client staff. It is anticipated these meetings will be held at minimum once a month and as-needed throughout the twelve-month schedule. Total number of meetings will not exceed twenty-four (24) within a twelve-month period. Meetings will be used to review the status of project tasks, Client priorities and needs, as well as provide updates to the proposed buildout phasing plan schedule. Task 2 – GIS Database Setup and Interactive Application Development Kimley-Horn will assist with developing attribute fields data from various sources provided by the Client to the Client’s existing GIS database framework and data schema based on the agreed upon GIS database scheme presented as part of Task 1. A. Study area/phasing determination and data layers to be developed will be confirmed at project kickoff and the draft GIS database will be provided to client for review prior 22 kimley-horn.com 200 South Orange Avenue, Suite 600, Orlando, FL 32801 407-898-1511 to full attributing. This task is not to exceed ten (10) hours. Proposed baseline dataset layers and proposed attribute (up to 3 attributes per data layer) data will include: Ex. Domestic Water (Feature Age, Size, Material, Repair History) • Valves • Hydrants • Meters B. Kimley Horn will develop GIS data from any existing GIS data, CAD data, As-Built surveys, and/or other sources provided by the Client. Kimley-Horn will fully compile, verify, and process data into GIS format for the final GIS database, and integration into the City’s existing GIS system. This task is not to exceed eighty (80 hours) over a 12-month period. C. Once GIS data is developed and populated with the existing information, it will be open and addressed for comments. This task is not to exceed twelve (12) hours. D. All data sources will be combined, verified, and converted as necessary in order to be fully integrated into the clients ArcGIS Enterprise system for editing/publishing. This task will require the purchase/use of an ESRI Enterprise Creator License purchased by the City for use by Kimley-Horn to assist in the integration of the compiled data into the existing GIS system. This task is not to exceed sixteen (16) hours over a 12-month period. Task 3 – Field Data Collection/Verification A. Kimley-Horn will coordinate with City staff to develop a priority route and/or area for field data collection and data verification. A priority matrix will be developed via items including, but not limited to, pipe age, material, flow criticality, size, and repair history. B. Utilizing the Clients existing ArcGIS Enterprise system, Kimley-Horn will assist with subsequent field data collection systems set-up and management utilizing the clients ArcGIS Field Maps application capabilities. Kimley-Horn will develop one (1) draft Field Collector application for the client. Asset data-sets from Task 2 will be loaded into the Field Maps application and configured for editing/creating GIS data in the field. This task is not to exceed thirty-two (32) hours. Once proposed hours are exceeded, contract agreement to change as necessary. Hours proposed are based on assumption of workload, but scope may change resulting from availability of data. C. Kimley-Horn will assist the client with data collection utilizing the application for up to sixteen (8) hours monthly as needed. This task is not to exceed ninety-six (96) hours over a 12-month period. D. Kimley-Horn will assist with up to ten (10) hours of on-site field collection training to be provided to the client prior to field collection. 23 kimley-horn.com 200 South Orange Avenue, Suite 600, Orlando, FL 32801 407-898-1511 E. Once Task 3 Item A is complete, the GIS data layers with completed attribution will be submitted to the client for up to two (2) rounds of review and comments. Data revisions are not to exceed sixteen (16) hours over a 12-month period. Deliverables • Meeting agendas and meeting notes • Copies of the GIS Database and Data Layers (also in CAD format) • One ArcGIS Field Maps Collection Application (stored on the Client’s own ArcGIS System) Schedule Kimley-Horn will begin services upon receipt of an executed Task Order. These services will be completed as expeditiously as possible. Method of Compensation Kimley-Horn will perform these services for the total lump sum fee of $95,700.00, inclusive of office overhead expenses. A breakdown of the fee by task is as follows: Task Description Lump Sum Fee Task 1 Project Management and Coordination $18,410.00 Task 2 GIS Database Setup and Interactive Application Development $35,390.00 Task 3 Field Data Collection/Verification $41,900.00 Total $95,700.00 Services provided under this will be invoiced on a monthly basis. All invoices will include a description of services provided. In an effort to expedite invoices and reduce paper waste, Kimley-Horn submits invoices via email in an Adobe PDF format. We can also provide a paper copy via regular mail if requested. Kimley Horn requests that the City include the invoice number and Kimley-Horn project number with all payments. Additional Services • Additional Reviews, meeting, updates not identified in the above Scope of Services • Use of subcontractor, and/or third-party to verify buried pipe not included in Scope of Services. Services requested that are not specifically included in the general range of the services listed above can be provided under an amendment to this authorization or under a new and separate agreement. If you concur in all the foregoing and wish to direct us to proceed with the services, please have authorized persons execute a task authorization for this scope of services and transmit via email to Julia.felter@kimley-horn.com. We will commence services after we have received a fully-executed task authorization. 24 kimley-horn.com 200 South Orange Avenue, Suite 600, Orlando, FL 32801 407-898-1511 We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. By: Julia Felter, P.E. Lance R. Littrell, P.E. Project Manager Vice President Authorization City of Winter Springs, Florida By: City Manager (Date) (Print or Type Name) __________________ (Email Address) Attest: (Print or Type Name) 25 EXHIBIT A - CONSULTANT'S COMPENSATION PROPOSAL BREAKDOWN OF FEES TOTAL Rate ($/Hour): Kimley-Horn and Associates, Inc.Labor Hours Cost Labor Hours Cost Labor Hours Cost Labor Hours Cost Labor Hours Cost Labor Hours Cost Labor Hours Cost Labor Hours Cost Project Management and Coordination Task 1 6 $1,560 27 $6,480 18 $3,510 14 $2,730 20 $2,500 6 $780 10 $850 87 $18,410 Project Kickoff meeting and initial data list development and data sources 3 $780 12 $2,880 12 $2,340 4 $780 10 $1,250 2 $260 2 $170 41 $8,460 Project status and coordination calls 3 $780 15 $3,600 6 $1,170 10 $1,950 10 $1,250 4 $520 8 $680 46 $9,950 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 Sub-Total Project Management and Coordination 6 $1,560 27 $6,480 18 $3,510 14 $2,730 20 $2,500 6 $780 10 $850 87 $18,410 GIS Database Setup and Interactive Application Development Task 2 11 $2,860 93 $22,320 26 $5,070 16 $3,120 12 $1,500 4 $520 0 $0 146 $35,390 Development of initial GIS database feature classes and schema 0 $0 10 $2,400 3 $585 0 $0 0 $0 0 $0 0 $0 13 $2,985 GIS Database Development & Attributing 5 $1,300 65 $15,600 15 $2,925 12 $2,340 4 $500 2 $260 0 $0 91 $22,925 Address One Round of Comments 3 $780 10 $2,400 3 $585 4 $780 4 $500 0 $0 0 $0 20 $5,045 Consolidate and Publish Data Layers 3 $780 8 $1,920 5 $975 0 $0 4 $500 2 $260 0 $0 22 $4,435 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 Sub-Total GIS Database Setup and Interactive Application Development 11 $2,860 93 $22,320 26 $5,070 16 $3,120 12 $1,500 4 $520 0 $0 146 $35,390 Field Data Collection/Verification Task 3 15 $6,120 46 $10,910 30 $8,200 23 $6,835 57 $7,475 0 $0 12 $2,360 160 $41,900 Field Data Maps Setup & Application Development 5 $1,300 12 $2,880 3 $585 3 $585 $0 0 $0 2 $170 22 $5,520 Field Data Collection Assistance 7 $1,820 12 $2,880 22 $4,290 15 $2,925 40 $5,000 0 $0 4 $340 85 $17,255 Address One Round of Comments 0 $0 10 $2,400 5 $975 5 $975 5 $625 0 $0 2 $170 22 $5,145 Field Maps Staff Training 3 $3,000 12 $2,750 $2,350 $2,350 12 $1,850 0 $0 4 $1,680 52 $13,980 Sub-Total Field Data Collection/Verification 15 $6,120 46 $10,910 30 $8,200 23 $6,835 57 $7,475 0 $0 12 $2,360 160 $41,900 Expense Task TOTAL LUMP SUM FEE:32 $10,540 166 $39,710 74 $16,780 53 $12,685 89 $11,475 10 $1,300 22 $3,210 393 $95,700 Project Manager $195 Support Staff $85 Analyst $125 Technical Support $130 Principal-in- Charge Senior Professional $260 $195 Senior Project Manager $240 26