HomeMy WebLinkAbout2023 03 27 Consent 301 - Construction Contract for Wade Street Roadway Restoration • CONSENT AGENDA ITEM 301
,n m=ared CITY COMMISSION AGENDA I MARCH 27, 2023 REGULAR MEETING
1959
TITLE
Construction Contract for Wade Street Roadway Restoration
SUMMARY
Due to severe rainfall resulting from Hurricane Ian the culvert crossing on
Wade Street,just north of George Street, was overwhelmed with tremendous
flow. The rate of discharge was greater than the culvert was capable of
handling. As a result of the overflow at the culvert crossing, the Wade Street
roadway and downstream culvert headwall was demolished. The proposed
improvements will entail restoration of the roadway facilities to their pre-
hurricane condition while also providing additional capacity for the upstream
inlets.
RECOMMENDATION
Staff requests Commission approve an amount not to exceed $185,080.00 for
Southland Construction, Inc. to perform roadway and stormwater restoration
and enhancements on Wade Street at the culvert crossing just immediately
north of George Street and authorization for the Interim City Manager and
City Attorney to prepare and execute any and all applicable contract
documents consistent with this Agenda item.
15
ASOUTHLAND CONSTRUCTION, INC.
172 WEST FOURTH STREET
APOPKA, FLORIDA 32703
TEL (407) 889-9844
FAX (407) 886-4348
March 15, 2023
City of Winter Springs
400 Old Sanford Oviedo Road
Winter Springs, Florida, 32708
Attention: Mr. Philip Hursh, Interim City Manager
Email: phursh@winterspringsfl.org
RE: Wade Street Emergency Repair
Mr. Hursh,
Please find enclosed our Scope and Proposal for the above referenced project. Southland Construction, Inc.
(Contractor) shall furnish to the City (Owner) all the materials and services outlined in this Proposal for the
Contract price of:
TOTAL: $185,080.00
The price quoted above is based upon the materials and services described more particularly in the scope and
proposal attached to this letter. The above contract price is based only on the specific materials and services
that are stated on the attached sheets and does not include any materials or services which subcontractor has
excluded from its bid. The above contract price represents the work described in scope of work developed by
Southland Construction, Inc. delivered to your attention on March 15, 2023.
This proposal is made with the understanding that the contractor has had ample time to review and comment on
the stated Scope of Work and proposed exclusions. Otherwise, this Proposal is made on this day, March 15,
2023 and the price quoted above will be valid for thirty (30) days from the date entered.
Should you have any questions after review, please do not hesitate to call me.
Sincerely,
Southland Construction, Inc.
Ben White
16
Project Name: Wade Street Emergency Repair
March 15, 2023
Quote Number: 01-2023
GENERAL SCOPE:
Southland Construction, Inc. proposes the following scope of work:
1. See attached 230228 Scope Breakdown.
SUBCONTRACTOR HAS EXCLUDED FROM ITS BID THE FOLLOWING:
1. Permits
2. As Builts
GENERAL NOTES:
1. A mutually agreeable schedule must be established.
2. Grates for Item 425-1-573, Type G DBI, may require up to 4-6 weeks to produce and be available to
project.
3. Coordination with utility providers for work affected by active utilities within work area is provided and
included by Southland. No work can begin until all utilities have been located, identified, and all
providers have been contacted and requested to field inspect their service to provide direction for work
affecting their service or to provide additional services to protect, repair, or relocate their facilities during
embankment and restoration activities.
Southland Construction, Inc. 172 west Fourth St
Apopka,FL 32703
Phone: 407-889-9844
Fax: 407-886-4348 17
Project Name: Wade Street Emergency Repair
March 15, 2023
Quote Number: 01-2023
TERMS AND CONDITIONS:
1. Notwithstanding anything to the contrary in the invitation to bid or in any of the bid documents(hereinafter referred to as the"Bid Package")in
response to which this scope and proposal has been submitted,and in the event that Owner notifies Contractor that Owner intends to accept
Contractor's proposal for the subject project, Contractor reserves the right to negotiate any and all terms and conditions of the contract
agreement between Contractor and Owner,even if a proposed contract agreement has been included in the Bid packages,and even if the Bid
Package states that the execution of the contract agreement in the form included in the Bid Package is mandatory.This scope and proposal
shall become effective as a contract when executed by Owner and Contractor.Alternatively,if this scope and proposal is not executed by
Owner and Contractor,all of the obligations of Contractor pursuant to this scope and proposal shall be conditioned upon the execution by
Contractor and Owner of a contract that contains terms and conditions reasonably acceptable to Contractor.
2. Notice to owner/bond will be filed on all projects.Through this action, Southland Construction, Inc. reserves its lien rights.
3. In the event Contractor is delayed by or has any other claim for damaged and/or an extension of time caused by Owner or other Contractor,
Contractor will negotiate its compensation and/or extension of time with Owner. An extension of time may not be Contractor's sole remedy for
such delays. Contractor may, but shall not be required to make up time for delays not directly caused by Contractor including but not limited to
delays cause by inclement weather,acts of God,strikes, unavailability or shortages of material and any government actions which can affect
subcontractor's ability to perform according to the terms of this agreement).
4. All pay documentation request forms will be furnished prior to first invoice period.
5. Owner shall be invoiced monthly for the above values. Payment is due Net 30 days from the date of invoice.
6. In the event it is necessary for the Contractor to place this contract in the hands of an attorney for the enforcement of any of the Contractor's
rights,including the collection of the contract price or any portion thereof from the contractor,the contractor shall be responsible for all of
Contractor's expenses incurred, including Contractor's expenses incurred in the filing of a lien or bond claim,court costs and a reasonable
attorney's fee.
7. Contractor's lien rights will not have to be waived in advance of receiving payment.
8. Southland Construction, Inc.will accept no back charges without prior written authorization.
REVIEWED AND AGREED TO BY:
Company Name
Company Representative and Title (Printed)
Signature Date
Southland Construction, Inc. 172 West Fourth St
Apopka,FL 32703
Phone: 407-889-9844
Fax: 407-886-4348 18
c 000cScS0000000vio � o 0
E-� � Noo, 000, �no � NONocoN co
69
M M --�
aaaa � � � H � � waaa � a ��
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
E�
O
A
A
U
a U � C7 SOW E-� oQ �,
E�
A � � OUiL1HOaUUZUUwaOU