HomeMy WebLinkAbout2023 02 27 Consent 304 - Shore Road Restoration • CONSENT AGENDA ITEM 304
,n m=ared CITY COMMISSION AGENDA I FEBRUARY 27, 2023 REGULAR MEETING
1959
TITLE
Shore Road Restoration
SUMMARY
Due to severe flooding resulting from Hurricane Ian staging of Gee Creek
exceeded higher than normal elevations thus overtopping Shore Road at the
Gee Creek crossing. The overtopping caused severe degradation of the Shore
Road roadway facility making the roadway impassable to while leaving
exposed water and gas lines. Under the City's current State of Emergency City
staff requests the Commission's approval of the proposed roadway
improvements in order to restore the roadway facility to its pre-hurricane
condition. Cost for the full restoration is $198,342.01 .
RECOMMENDATION
Staff requests Commission approve the proposal prepared by Southland
Construction, Inc. for the full restoration of the Shore Road in the amount of
$198,342.01 and authorize City Manager and City Attorney to prepare any
and execute any and all necessary documents.
15
f �
T
ASOUTHLAND CONSTRUCTION, INC.
172 WEST FOURTH STREET
APOPKA, FLORIDA 32703
TEL (407) 889-9844
FAX (407) 886-4348
December 9, 2022
City of Winter Springs
1126 East State Road 434
Winter Springs, Florida, 32708
Attention: Shawn Boyle, MEcon, City Manager
Email: sboyle@winterspringsfl.org
RE: Shore Road Emergency Repair
Dear Shawn,
Please find enclosed our Scope and Proposal for the above referenced project. Southland Construction, Inc.
(Contractor) shall furnish to the City (Owner) all the materials and services outlined in this Proposal for the
Contract price of:
TOTAL: $198,342.01
The price quoted above is based upon the materials and services described more particularly in the scope and
proposal attached to this letter. The above contract price is based only on the specific materials and services
that are stated on the attached sheets and does not include any materials or services which subcontractor has
excluded from its bid. The above contract price represents the work described in scope of work developed by
Southland Construction, Inc. delivered to your attention on December 2, 2022.
This proposal is made with the understanding that the contractor has had ample time to review and comment on
the stated Scope of Work and proposed exclusions. Otherwise, this Proposal is made on this day, December 9,
2022 and the price quoted above will be valid for thirty(30) days from the date entered.
Should you have any questions after review, please do not hesitate to call me.
Sincerely Yours,
Southland Construction, Inc.
Eric Eliason
r�
Project Name: Shore Road Emergency Repair
December 8. 2822
Quote Number: DJ'2022
GENERAL SCOPE:
Southland Construction, Inc. proposes the following scope 0fwork:
1. See attached 221208CScope Breakdown.
SUBCONTRACTOR HAS EXCLUDED FROM ITS BID THE FOLLOWING:
1. P8[Onito
2. As Bui|tn
3. Design and analysis of hydraulics in Gee Creek impacting Bridge Structure and surrounding areas,
pricing and consideration can boproduced inaseparate proposal.
GENERAL NOTES:
1. Amutually agreeable schedule must b8established.
2. Asphalt Paving innot available between December 22' 2022and January 3. 2023.
Southland Construction, Inc. |7? West Fourth S/
Apopka. FL,32703
Phonu: 407-88Y'v844
Fax:407-886-1348
00
r �
Project Name: Shore Road Emergency Repair
December 9, 2022
Quote Number: 032022
TERMS AND CONDITIONS:
1. Notwithstanding anything to the contrary in the invitation to bid or in any of the bid documents(hereinafter referred to as the"Bid Package")in
response to which this scope and proposal has been submitted,and in the event that Owner notifies Contractor that Owner intends to accept
Contractor's proposal for the subject project,Contractor reserves the right to negotiate any and all terms and conditions of the contract
agreement between Contractor and Owner,even if a proposed contract agreement has been included in the Bid packages,and even if the Bid
Package states that the execution of the contract agreement in the form included in the Bid Package is mandatory.This scope and proposal
shall become effective as a contract when executed by Owner and Contractor.Alternatively,if this scope and proposal is not executed by
Owner and Contractor,all of the obligations of Contractor pursuant to this scope and proposal shall be conditioned upon the execution by
Contractor and Owner of a contract that contains terms and conditions reasonably acceptable to Contractor.
2. Notice to owner/bond will be filed on all projects.Through this action,Southland Construction,Inc.reserves its lien rights.
3. In the event Contractor is delayed by or has any other claim for damaged and/or an extension of time caused by Owner or other Contractor,
Contractor will negotiate its compensation and/or extension of time with Owner. An extension of time may not be Contractor's sole remedy for
such delays.Contractor may,but shall not be required to make up time for delays not directly caused by Contractor including but not limited to
delays cause by inclement weather,acts of God,strikes,unavailability or shortages of material and any government actions which can affect
subcontractor's ability to perform according to the terms of this agreement).
4. All pay documentation request forms will be furnished prior to first invoice period.
5. Owner shall be invoiced monthly for the above values.Payment is due Net 30 days from the date of invoice.
6. In the event it is necessary for the Contractor to place this contract in the hands of an attorney for the enforcement of any of the Contractor's
rights,including the collection of the contract price or any portion thereof from the contractor,the contractor shall be responsible for all of
Contractor's expenses incurred,including Contractor's expenses incurred in the filing of a lien or bond claim,court costs and a reasonable
attorney's fee.
7. Contractor's lien rights will not have to be waived in advance of receiving payment.
8. Southland Construction,Inc.will accept no back charges without prior written authorization.
REVIEWED AND AGREED TO BY:
Company Name
Company Representative and Title (Printed)
Signature Date
Southland Construction, Inc. 173 west Fourth St
Apopka, FL 32703
Phone: 407-589-9844
Fax:407-886-43=43
02/24/2023 10:20
221209C WINTER SPRINGS SHORE RD EMERGENCY
***Ben White BID TOTALS
Biditem Description -Status-Rnd Ouantity Units Unit Price Bid Total
101-1 MOBILIZATION F-New 1.000 LS 74,700.00 74,700.00
102-1 MAINTENANCE OF TRAFFIC F-New 1.000 LS 2,817.51 2,817.51
104-10-3 SEDIMENT BARRIER F-New 340.000 LF 3.50 1,190.00
104-11 FLOATING TURBIDITY BARRIER F-New 40.000 LF 15.00 600.00
110-1-1 CLEARING AND GRUBBING F-New 1.000 LS 34,610.00 34,610.00
120-6 EMBANKMENT F-New 813.000 CY 26.00 21,138.00
160-4 TYPE B STABLIZATION F-New 475.000 SY 25.00 11,875.00
285-709 OPTIONAL BASE,BASE GROUP 09 F-New 398.000 SY 35.00 13,930.00
334-1-13 SUPERPAVE ASPHALTIC CONC,TRAFFIC C F-New 43.780 TN 250.00 10,945.00
425-1-325 INLETS,CURB TYPE P-2,PARTIAL F-New 1.000 EA 2,500.00 2,500.00
520-1-8 CONCRETE CURB AND GUTTER(DROP CURB/MIAMI) F-New 168.000 LF 30.00 5,040.00
522-1 CONCRETE SIDEWALK AND DRIVEWAYS,4"THICK F-New 92.000 SY 45.00 4,140.00
515-1-2 PIPE HANDRAIL-GUIDERAIL,ALUMINUM F-New 60.000 LF 150.00 9,000.00
570-1-2 PERFORMANCE TURF-SOD F-New 689.000 SY 8.50 5,856.50
Bid Total > $198,342.01