Loading...
HomeMy WebLinkAbout2023 02 13 Informational 200 - Current Development Projects Summary • INFORMATIONAL AGENDA ITEM 200 ,n m=ared CITY COMMISSION AGENDA I FEBRUARY 13, 2023 REGULAR MEETING 1959 TITLE Current Development Projects Summary SUMMARY RECOMMENDATION Staff recommends the City Commission receive and review this information. 9 • CITY OF WINTER SPRINGS, FLORIDA COMMUNITY DEVELOPMENT DEPARTMENT fneorp4ra[ed Current Development Projects Summary Pre-Applications and Non-Binding Reviews • Pre-application meetings are required for all projects before a formal submittal is permitted. During these meetings, applicants will outline their proposed project to staff and staff will provide feedback and explain the development review process. • Non-binding reviews are sometimes recommended by staff if a proposed project is potentially controversial. Non-binding reviews undergo a very high-level review by staff with some comments provided to the applicant. The intent is for the applicant to present the project to the City Commission to gauge their receptiveness to the proposed project. PROJECT NAME LOCATION LAST ACTION ITEM CURRENT STATUS 1270 Belle Ave West side of Belle Ave. Pre-application meeting Awaiting formal submittal just south of SR 434 held on October 27 Exxelia (Expansion) Northeast corner of Pre-application Awaiting formal submittal Highway 17-92 and meeting held on July Shepard 14 The Adel at Lake Jesup North side of Orange Ave N/A Awaiting complete application Dunkin' Donuts North side of SR 434 just Pre-application meeting Awaiting formal submittal east of Michael Blake held on December 15 Blvd Dittmer RV Storage Southwest corner of Pre-application meeting Awaiting formal submittal Shepard Rd. and Seven held on January 12 Oaks The Oaks at Lake Irene South side of SR 434 lust N/A Pre-application meeting (Primarily in Seminole east of Hwy 17-92 scheduled for February County) 16 The Grove(Expansion) North side of Old Sanford N/A Pre-Application meeting Oviedo Rd. scheduled for February 7 Fast Food Restaurant North side of SR 434 lust N/A Pre-Application meeting (Unidentified) east of SR 417 to be scheduled 10 Development Protects in Review • These are projects that have gone past the stage of a pre-application meeting and are in various stages of the development review process.These projects could be anywhere from confirming that the application is complete all the way through to approval of the project by the City Commission or even beyond that to final site acceptance. PROJECT NAME LOCATION LAST ACTION ITEM CURRENT STATUS Hickory Grove Town Center Waivers 1&2,Variance, Preconstruction Townhomes &Aesthetic Review meeting held on Northeast of Bear Springs approved by CC on 06/01/22 132 Single-Family Drive and Blumberg Blvd. 03/14/22. Second Homes(Attached) DA, Final Engineering, preconstruction Specimen Tree Removal, meeting held on &Waiver 3 approved by 8/19/22 CC on 05/23/22. Fifth Third Bank Town Center Plans approved by City Pre-Construction Commission on January 9 Meeting held on Southwest corner of SR January 26 434 and Tuskawilla Living Life Development North Side of W SR 434, N/A Community Workshop (ILF) west of Fountaintree Dr. scheduled for February 22 Ace Hardware Town Center N/A Aesthetic Review Southeast corner of SR underway 434 and Tuskawilla,just south of Mobil station Excelsior Town homes Excelsior Pkwy N/A Awaiting complete East side of Moss Rd. application materials Tuskawilla Self-Storage County Enclave N/A Awaiting public hearing (Not in city limits) East side of Tuskawilla date to be set by Rd.just south of Michael Seminole County Blake Blvd. 11