HomeMy WebLinkAbout2024 03 11 Awards/Presentations 101 - Utility/CIP UpdateAWARDS AND PRESENTATIONS ITEM 101
CITY COMMISSION AGENDA | MARCH 11, 2024 REGULAR MEETING
TITLE
Utilities CIP Project Update
SUMMARY
FUNDING SOURCE
RECOMMENDATION
UTILITY CAPITAL
IMPROVEMENT
PLAN (CIP)
PROJECT UPDATE
March 11, 2024
AGENDA
•Introduction
•Ongoing Projects
o Potable Water
o Wastewater
o Reclaimed Water
•2024 Capital Improvement Plan
•Consumptive Use Permit Update
•Wastewater Plants Design and Construction Update
POTABLE WATER
Project Name Project Description
Potable Water System
Optimization/Modifications
•Technical support to optimize water quality and aesthetics at all WTPs;
includes water quality sampling, sulfide removal evaluation, chlorine
injection relocation, etc.
Lead & Copper Rule
Revision
•Development of lead service line inventory
•Development of sampling plan
•Coordination with FDEP / health department
•Per FDEP rule,compliance date of October 2024
Fire Hydrant Testing and
Inventory
•Annual Fire Hydrant Flow Test Data for Seminole County Fire Dept.
•Includes inventory, inspection, hydrant exercising, painting, etc.
•Log data into City’s GIS system and provide information to SCFD
Water Treatment Plant #3
Electrical Upgrades
•Design to add diesel generator and variable frequency drives
•Construction 2024
Cross Connection Control
Plan
•Update CCCP manual
•Inspect and test backflow preventors
WASTEWATER
Project Name Project Description
Wastewater Treatment
Plant Design
•Design and construction phase services for the replacement of the East
and West Water Reclamation Facilities
•Engineering, survey, geotechnical, civil/site, environmental, structural
Revenue Sufficiency
Analysis
•Evaluate the City’s operating and maintenance budget
•Evaluate the City’s Capital Improvement Plan (CIP)
•Establish rates to increase revenue to implement the CIP, keep minimum
fund balance and maintain good standing with State Revolving Fund
(SRF) loan requirements
Lift Station 7W •Design to replace existing 1980’s lift station
•Improve lift station reliability
•Relocated to be further away from Gee Creek
RECLAIMED WATER
Project Name Project Description
Lake Jesup Reclaimed Water
Augmentation Station - Feasibility
Analysis
•Assess physical condition of plant and provide rehabilitation
recommendations
•Hurricane Ian damage
•St. John’s River Water Management District – 2024 grant
funding requested
Reclaimed System Disposal Evaluation
(RIBS)
•Evaluation to confirm functional capacity of the Rapid
Infiltration Basins
•Provide subsequent recommendations to potentially improve
disposal sites
•Engineering, survey, geotechnical
Winter Springs Village RWM
Extension
•Design of pipeline extension to provide reclaimed water to
users
•Convert irrigation from potable water to reclaimed water
CAPITAL IMPROVEMENT PLAN - 2024
Project Type Project Name Project Description
Water Water Pipeline Inventory
and Replacement Phasing
Plan
•Develop plan to efficiently and effectively remove or
replace old or damaged pipelines throughout the City
•CIP budgeted $500,000/yr
Water Residential Water Meter
Replacement Phasing
Plan
•Evaluate and replace meters throughout the City
•Develop a priority list for replacement
•CIP budgeted $1,000,000/yr
Water &
Wastewater
Water and Sewer Design
and Construction
Specifications update
•Updated specifications
•Add Inspection and Close-out checklist for new
development
Water &
Wastewater
2024 Financial Forecast •Review revenues received since rate increase and
compare it to budgeted CIP project costs
•Includes evaluating the cost of outsourcing staff verse
hiring directly
Reclaimed
Water
Reclaimed Water Main
Extensions
•Additional reclaimed water main extensions to convert
irrigation water from potable to reclaimed water
GRANT PURSUITS
•Resilient Florida Grants
•Hazard Mitigation Grant Program (HMGP)
•FDEP State Revolving Funds (SRF)
•St. John River Water Management District Funding
CONSUMPTIVE USE PERMIT (CUP) UPDATE
86.76
99.37
104.42
93.37 94.93
113.48
119.15
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
0
20
40
60
80
100
120
140
2017 2018 2019 2020 2021 2022 2023Per Capita Consumption (gpcd)Raw Water Pumpage (MGD AADF)Raw Water Pumpage vs. Per Capita Consumption
Avg Raw Water Pumpage
(MGD AADF)
City's Per Capita Consumption
(gpcd)
CFWI Per Capita Consumption Limit
(gpcd)
•Water use trend has
continued to increase
more than projected
•City exceeded CUP in
2022 and 2023
•Collaboratively working
with St. Johns River
Water Management
District
CONSUMPTIVE USE PERMIT (CUP) UPDATE
City Ongoing Efforts
•Continued verification of all Raw Well and WTP meters
•Additional reclaimed expansion offsets
•Lake Jesup Augmentation Station pursuing funding through SJRWMD
•CIP planned potable water main replacements
•Efforts to minimize water loss
•Water conservation efforts
•High water usage analysis
•Requesting community support
•Irrigation conservation/education
EAST & WEST WASTEWATER PLANTS – PLANNING HISTORY
•Planning History
•Conceptual Design Report : 2020 - 2021
•Wastewater Master Plan developed and adopted : 2022
•Revenue Sufficiency Analysis : 2022/2023
•SRF Funding for design of Wastewater Plants : 2023
•City RFQ for Wastewater Plants Design : 4/2023
•Commission passes Wastewater Plants Design and Construction
Services : 12/2023
EAST & WEST WASTEWATER PLANTS – DESIGN/CONSTRUCTION
•Current Activities
•Evaluation of flow and load data to finalize facility sizing/process equipment
•Data collection / site analysis
•Environmental
•Survey
•Geotechnical
•Next steps
•Detailed design
•CMAR selection process
•Pre -permitting
•Continued funding coordination
THANK YOU!