Loading...
HomeMy WebLinkAbout2024 03 25 Consent 301 - Tuskawilla Crossings Stormwater Pond - Pond 1 Emergency RepairCONSENT AGENDA ITEM 301 CITY COMMISSION AGENDA | MARCH 25, 2024 REGULAR MEETING TITLE Tuskawilla Crossings Stormwater Pond - Pond 1 Emergency Repair SUMMARY In response to the severely damaged stormwater pond, located in the Tuskawilla Crossings subdivision, the City of Winter Springs and Pegasus Engineering have undertaken the process, with Commission approval, to evaluate and reconstruct a large portion of the existing pond facility. The City and Pegasus have been working closely in this process with the St. John's River Water Mangement District (SJRWMD). SJRWMD has requested that during the design and permitting phase with the WMD the City temporarily install fill material at the breached location in order to avoid any further direct discharge to the downstream wetlands without pollution abatement and attenuation. Final reconstruction of the pond will occur once the design is final and permitted through the SJRWMD. FUNDING SOURCE Third generation sales tax revenue will provide sufficient funding for this temporary measure as required by the SJRWMD. RECOMMENDATION Staff requests Commission approval for the temporary emergency repair of Pond 1 located in the Tuskawilla Crossing subdivision. Staff recommends the contract be awarded to Outdoor With It, LLC with a low bid of $75,792.39. This repair is a temporary measure until such time that the final repairs are made to the overall pond facility. Other bids were: Southern Development and Construction ($184,752.00), CL Green Inc. ($135,000.00) and Florida Site Services ($79,252.40). 16 Contract Date 2/28/2024 Estimate # 1182 Name / Address City of Winter Spings 1126 East State Road 434 Winter Springs, FL 32708 CL Green, Inc. P.O. Box 868 Windermere, FL 34786-0868 Pond Bankment Repair Estimate good for 30 days! Thank you. Phone # 407-909-0900 E-mail clg@clgreeninc.com Web Site www.clgreeninc.com Total Job Site Item Description Cost Total Machine Machine time and labor 135,000.00 135,000.00 Mobilization x2 Machine transportation fees Sod Bahia on repair embankment Fill Fill dirt material 1,200 cy compaction work Compaction work Compaction Test Compaction Test Materials Will use mats to protect pedestrian Trail Dumpsters Dump for green debris Trucking Dump truck time, and dump fees Pumps Pumps if needed Authorized Signature:_________________________________ Print name:___________________________________Date__________ *Excess is 1422 Trailhead Point *No permits *No other washout repair *No extra grass $135,000.00 17 Florida Site Services PROJECT NAME:Tuskawilla Pond Repair ATTN:Stuart Maclean DATE: 2/29/2024 Description Quantity Unit Unit Price Total General Conditions, Mob General Conditions 1.0 LS 9,638.00$ 9,638.00$ General Conditions, Mob 9,638.00$ Erosion Control & Maintenance Silt Fence 200.0 LF 2.90$ 580.00$ Erosion Control Maintenance 1.0 LS 2,939.00$ 2,939.00$ Erosion Control & Maintenance 3,519.00$ Mats and Yard Restoration Light Clearing & Grubbing 1.0 LS 6,100.00$ 6,100.00$ Install / Remove Mats for Yard/Drive Protection 1.0 LS 11,809.60$ 11,809.60$ Restore and Sod Yards 167.0 SY 28.21$ 4,711.07$ Restore Concrete 28.0 SY 136.64$ 3,825.92$ Street Sweep 4.0 Ea.1,024.80$ 4,099.20$ Mats and Yard Restoration 30,545.79$ Earthwork & Grading Import Clean Fill 700.0 CY 43.76$ 30,632.00$ Grading Slope 400.0 SY 5.80$ 2,320.00$ Sod Pond Slopes 905.0 SY 2.87$ 2,597.35$ Earthwork & Grading 35,549.35$ Total Base Bid 79,252.14$ Option to Repair and Sod SE Corner of Pond Import Clean Fill 128.0 CY 43.76$ 5,601.28$ Grading Slope 112.0 SY 5.80$ 649.60$ Sod Pond Slopes 112.0 SY 2.86$ 320.32$ Option to Repair and Sod SE Corner of Pond 6,571.20$ Payment and Performance Bond Add 1% Exclusions: 1 2 3 4 5 6 7 8 250 International Parkway ● Heathrow, FL 32746 ● Suite 128-1 ● (Phone) 888-711-8121 No removal/handling of asbestos Seed and mulch of site Construction Testing/Inspection and cost of permits Tie to state plane coordinates; certified benchmarks and brass disks. a.) Final layout of buildings is by others Payment and Performance Bond Dust control and erosion control when not actively working on site Excavation, backfill, and disposal of a.) hazardous material b.) Unsuitable Soil Excavation and backfill of building footers, foundations, or elevator shafts 18 We have based our price on the following: 1 2 3 4 5 6 7 8 9 10 Import quantities were generated and furnished by engineer. FSS shall be paid unit price for overruns Acceptance of this proposal based on satisfactory financial arrangement. Acceptance of this proposal based on satisfactory review of Owners/General Contractors contract with owner and//or General This is a unit price proposal. Our price is valid for thirty (30) days Deletion of quoted items by mutual agreement Existing grades as shown on drawings Relocation of existing utilities is not included. Location of utilities installed by others is not included. Cleanup included only for FSS work. 19 Oviedo, FL 32765 2544 Connection Point Southern Development & Construction Shane Cox 321-251-0535 Contact: Phone: Fax: Job Name:Quote To:City of Winter Springs Emergency Retention Pond Repairs Date of Plans:Attn: Stuart MacLean Phone:Revision Date:407-327-7581 Email:smaclean@winterspringsfl.org Proposal Date:2-29-2024 HCSS 24-041 AMOUNTITEM DESCRIPTION QUANTITY UNIT UNIT PRICE MOBILIZATION LS1.00 10 17,000.00 17,000.00 CONSTR. LAYOUT / AS-BUILTS LS1.00 20 14,700.00 14,700.00 SINGLE ROW SILT FENCE LF600.00 50 7.00 4,200.00 CLEAR & GRUB LS1.00 70 19,400.00 19,400.00 POND DEWATERING -LS1.00 80 21,300.00 21,300.00 CAUSEWAY ACCESS / RESTORATION LS1.00 85 41,962.00 41,962.00 IMPORT FILL TCY800.00 90 69.00 55,200.00 SOD POND SLOPES (BAHIA)SY1,000.00 110 7.00 7,000.00 SEED - RESTORE LOT 1422 SY2,000.00 130 2.00 4,000.00 GRAND TOTAL 184,762.00 NOTES: PROJECT SPECIFIC NOTES * COST - This is Fixed Cost Proposal * TIME - Upon a Notice to Proceed, this work shall be complete withing 20 calendar days * Starting Date - It is anticipated the start date is March 11th, 2024 * Staging of Equipment & Fill material will occur at lots 1422 & 1426 - Trailhead Point and restore with seeding * Silt fence shall be installed around lots 1422 & 1426 & to provide access across the trail to the work zone * Access to the work zone will include crossing the Cross Seminole Trail. It's proposed to close the trail, however it's anticipated the traveling public will still use it. As we access the work zone, we will have personnel monitoring the trail & it's use. * Access to repair the berm, will included pumping the exiting pond into the manhole in which the City is currently utilizing. Based on the documents provided, it appears this storm system discharged to the Tract B-1 Conservation. * Once the existing pond is pumped to a manageable level, an earthern causeway is contructed to access the north side of the pond an make the repairs. * At the completion of the repairs, the earthen causeway is removed GENERAL CONDITIONS/ CONTRACT 1. This proposal is based on the following Plans: Titled: Tuskawilla Crossing Page 1 of 2 20 Prepared By:Pegasus Dated: 1/2024 This proposal is based on the above referenced drawings only. Work and/or details shown in other drawings/ specifications is not included in this proposal. 2. This proposal is based on the following Soils Report: Prepared By: Not Provided Dated: 3. Unless provided for otherwise in this proposal, this proposal is valid for 30 days from the date of the proposal. If a contract or other agreement is not executed within 30 days, then this proposal is subject to be reviewed for adjustment. 4. This work is based on a completion 20 days after a exectued Notice to Proceed, or an agreed project schedule as an attachment to the contract jointly prepared by Owner and SDC. Page 2 of 2 21 MARSH ROAD WIDENING AND ROUNDABOUT IMPROVEMENTS 2022-2023 Orange County, Florida. OWNER INFORMATION DESIGNER City of Winter Garden Jon Williams Pegasus Engineering 300 W. Plant Street City Manager EOR Fursan Munjedm, P.E. Winter Garden, Florida, 34787 RFP # 080059 301 W State Road 434, Ste 309 JWilliams@cwgdn.com Winter Springs, FL 32708 407-656-4111 fursan@pegasusengineering.net DETAIL OF WORK PERFORMED Value $ 9,238,255 This multi-phase project included the widening of Marsh Road ( 3,300 lf) from West of Johns Lake Overlook Drive to East of Avalon Road and a new roundabout at Johns Lake Overlook Drive. The work consists of pavement reconstruction and widening, 29,00 cy of earthwork, 4,200 lf of storm drainage, 1,500 lf of Type II Pond underdrain, 8,100 sf of permanent sheet pile wall with concrete barrier & bullet rail, 20,000 sy of base & asphalt paving, curb & gutter, concrete sidewalks, brick pavers, sodding, signing & pavement marking, and utility relocations / adjustments. PREMIER HEAVY CIVIL CONTRACTOR LAND CLEARING • UNDERGROUND UTILITY • GRADING • EARTHWORK • ROADWAYS 2544 Connection Point. Oviedo, FL 32765 | www.SDCFL.com | (407) 977-9898 22 WOLF BRANCH SINK DRAINAGE IMPROVEMENTS 2021 Lake County, Florida. OWNER INFORMATION DESIGNER Lake County BOCC Terry Scott Lake County Public Works 315 W. Main Street JScott@LakeCountyFL.gov Tavares, Florida 32778 352-253-9024 DETAIL OF WORK PERFORMED Value $ 272,729 This project is located in Mount Dora off Wolf Branch Road and involved the installation of underdrain and improved pond bottom soils to aid in the recovery of two dry ponds in the Wolf Branch drainage basin. Other work associated with this project included over-excavation of the pond bottom, placing clean fill, sodding and drainage construction. PREMIER HEAVY CIVIL CONTRACTOR LAND CLEARING • UNDERGROUND UTILITY • GRADING • EARTHWORK • ROADWAYS 2544 Connection Point. Oviedo, FL 32765 | www.SDCFL.com | (407) 977-9898 23 FIVE POINTS CONNECTOR ROAD & STORM WATER POND 2019-2020 Seminole County, Florida. OWNER INFORMATION DESIGNER Seminole County BOCC Steve Miller, P.E. Pegasus Engineering 1104 East 1st Street Smiller02@seminolecoiuntyfl.gov Sanford, Florida, 32771 407-665-5674 DETAIL OF WORK PERFORMED Value $ 5,550,505 The 15-acre site underwent specialized clearing using floating machinery, encompassing 109,000 cubic yards of excavation, 35,000 cubic yards of subsoil excavation, 600,000 square feet of geogrid installation, 34,000 linear feet of wick drains and a temporary surcharge embankment, along with 2,100 linear feet of storm drainage. Additionally, 3,700 square yards of base and asphalt paving were executed. Remarkably, the project was successfully concluded six months ahead of the scheduled timeframe. PREMIER HEAVY CIVIL CONTRACTOR LAND CLEARING • UNDERGROUND UTILITY • GRADING • EARTHWORK • ROADWAYS 2544 Connection Point. Oviedo, FL 32765 | www.SDCFL.com | (407) 977-9898 24 OVIEDO ON THE PARK 2017-2019 City of Oviedo, Seminole County, Florida. OWNER INFORMATION A Public Private partnership development between City of Oviedo PAC Land Development Mayor Dominic Persampiere Mr. Tom Cavanaugh 1000 Alexandria Boulevard 730 Bonnie Brae Street Oviedo, Florida 32765 Winter Park, Florida 32789 DETAIL OF WORK PERFORMED Value $21,000,000 over the 4 Phase Project New Construction of 7,256 linear feet of minor arterial roads from Alafaya Trail, E. Michell Hammock Rd to Oviedo Blvd. in Seminole County, project included underground utilities, directional bores, MOT, dewatering, clearing, erosion control, milling, stabilized subgrade, lime rock base, asphalt, demucking, embankment, curb, driveways, endwalls, retaining walls, traffic signalization, hardscape, sidewalk and conduit. Project also included new 4 way intersection with traffic control lights at the connection of E. Mitchell Hammock Road to City Plaza Way and two new turn lanes on Alafaya Trail and E. Mitchell Hammock Road. PREMIER HEAVY CIVIL CONTRACTOR LAND CLEARING • UNDERGROUND UTILITY • GRADING • EARTHWORK • ROADWAYS 2544 Connection Point. Oviedo, FL 32765 | www.SDCFL.com | (407) 977-9898 25 Thank you for choosing Outdoor With It LLC. We hope to work with you in the future. Sincerely, Elizabeth Geraghty/Randall Geraghty X_____________________ X___________________ Owners/Operators Customer signature Print www.Facebook.com/outdoorwithit/ X___________________ X_____________________ Outdoor With It LLC Date Outdoor With It LLC 650 Lake Harney Rd Geneva, Fl 32732 Outdoorwithit@gmail.com 321-303-2045 03/07/24 City of Winter Springs, Florida Project location 1126 East State Road 434 1533 & 1529 Graceful Doe Lp Winter Springs, FL 32708 Winter Springs, FL 32708 Tuskawilla Crossings berm Failure Proposal • Entrance to the pond and access for equipment will be between address 1529 Graceful Doe Lp and 1533 Graceful Doe Lp • We will be putting ground mats down between the houses for trucks/equipment to cross between properties. • Backfill of retention pond burm that washed out from overflow along the Cross Seminole Trail with 70 dump truck loads at 18 Cubic yards per truck with truck tickets for each load. Estimation of total cubic yards to be used is 1,260. • Reform the bank by grading and compacting to match remaining existing bank on both sides of the washout. • Excavate trees that are falling into the berm washout and haul them away. • Excavate grass and muck in berm washout and haul away. • Install an estimated 18,800 sqft of Bahia sod in the washout area and where trucks/equipment travel to and from berm blowout to the entrance of the pond from street. • Restoration between houses 1533 & 1529 St Augustine grass estimated 800sqft • All damages and or restoration from trucks and or equipment between houses will be restored after job is completed back behind the houses to its original look with before and after pictures being taken. • If there is any leftover dirt from my estimated 70 loads, we will spread and fill in the other previous washout areas along the bank by 1533 &1529 houses. • Curb and sidewalk between 1533 &1529 houses to be repaired after all equipment and mats are off the job. Any extra dirt and/or sod needed outside this proposal will be made in a change order to the City of Winter Springs paid to Outdoor With It. Estimated dirt and sod are based off the discussion between City of Winter Springs and Outdoor With It while on the site visit. Total Cost $75,792.39 26 Tuskawilla Crossing - Bids Received February 29, 2024 Bidder Southern Development and Construction CL Green Inc. Florida Site Services Outdoor With It 27 Quoted Amount $184,762.00 $135,000.00 $79,252.40 $75,792.39 28