HomeMy WebLinkAbout2023 08 14 Consent 303 - Pickleball Court LightingCONSENT AGENDA ITEM 303
CITY COMMISSION AGENDA | AUGUST 14, 2023 REGULAR MEETING
TITLE
Pickleball Court Lighting
SUMMARY
The City commission requested Lighting be added to the Pickleball complex currently
under construction. An ITB was sent out with all responses due on Friday July 28th at
2pm. Three responses were received. Accurate Power and Technology from Eustis,
Florida submitted a Bid of $156,745.98. Shaffer Electrical Contracting of Sanford,
Florida submitted a Bid of $167,591.00, and On Computer Services DBA Unified Power
of Lake Mary, Florida submitted a Bid of $195,005.00. Accurate Power and Technology
was the lowest and responsible bidder. In addition, a contingency of 20% is requested
for unexpected increase in scope. 20% equates to $31,349.20. The Bid of $156,745.98
and the contingency of $31,349.20 brings the project total to $188,095.18.
FUNDING SOURCE
RECOMMENDATION
Staff recommends accepting ITB #06-23-01 LH submitted by Accurate Power and
Technology for the installation of the Pickleball Court Lights. Accurate Power and
Technology submitted the lowest and responsible bid for $156,745.98. Funding will be
obtained from the Perk Up Parks Fund. A contingency of 20% is requested for
unexpected increases in scope. 20% equates to $31,349.20. The Bid of $156,745.98
and the contingency of $31,349.20 brings the project total to $188,095.18
In addition, authorize the the Interim City Manager and City Attorney to prepare and
execute any and all applicable contract documents consistent with this agenda item.
490
ITB 06-23-04 PH Creek Bank Stabilization Services
City of Winter Springs, Florida
1126 East State Road 434
Winter Springs, Florida 32708
INVITATION TO BID
PICKLEBALL COURT LIGHTING
BID REQUEST #: ITB 06-23-01 LH DATE: June 23, 2023
The purpose of this Invitation To Bid (ITB) is to solicit formal written Bids from experienced individuals, corporations,
partnerships and other legal entities (Bidder). The City of Winter Springs, FL (CITY) is seeking to obtain the Services of a
qualified vendor to provide and install Lighting Fixtures at The CITY’s Central Winds Park consistent with the Scope of Work
detailed in Appendix B
The City of Winter Springs Florida has installed professional standard Pickleball Courts in its Central Winds Park and now needs
to have similar standard lighting installed to increase the usability for its citizens.
Sealed Bids will be received by the City of Winter Springs (CITY) Procurement Department, located at Winter Springs City Hall,
1126 East State Road 434, Winter Springs, Florida 32708, until:
July, 28, 2023
2:00 p.m., local time
FOR
ITB #06-23-01 LH
Submission and Receipt of ITB’s:
Sealed Proposals will be received the City of Winter Springs Finance Department no later than 2:00 P.M., Eastern Time, on the
date established Part 1, Timeline of Events - Procurement Schedule, at the following address: Winter Springs City Hall, 1126
East State Road 434, Winter Springs, Florida, 32708 Attn: Stuart MacLean, Interim Procurement Manager
Proposals shall conform to the requirements outlined in the Request For Proposal. The CITY reserves the right to reject any and
all offers and to waive minor informalities. The CITY issues this Request for Proposal for the project requirements defined
herein, in order to select a Proposal for further contract negotiations and selection by the CITY may not necessarily result in the
formation of a contract.
PROPOSER shall submit their response to this RFP by:
Providing one (1) original, marked as such, three (3) copies, marked as such and one (1) electronic copy of your RFP response to
this office by the date and time indicated above. The outside of your package must be clearly labeled with the RFP number, title,
opening date and time, and the name and address of the PROPOSER. The CITY is not responsible for submittals via postal or mail
courier services, receipt by the post office or mail courier prior to the deadline does not constitute meeting the CITY’S receipt
deadline stated above.
Offers received after July 28, 2023 at 2:00 p.m., will be rejected.
Deadline for questions is July 05, 2023
An Addenda will be issued by noon on July 07, 2023 if questions are received and require clarification for all Bidders.
491
ITB 06-23-04 PH Creek Bank Stabilization Services
If you have any questions regarding this Invitation To Bid, please contact Stuart MacLean, Procurement Manager,
at (407) 327-7581, or via email at smaclean@winterspringsfl.org
PROPOSAL AND ADDENDUM DOCUMENTS CAN BE DOWNLOADED FREE OF CHARGE FROM:
www.demandstar.com
or
https://www.winterspringsfl.org/rfps
492
493
494
495
496
497
498
499
500
501
502
503
504
505
195,005.00
506
507
Michael Bauer
(407) 421-2698
mikeb@cpsfl.com
Computer Power Systems 3421 State Road 419 Winter Springs,FL 32708
Phone: 407.327.7373
www.cpsfl.com
Page 1 of 1
Proposal #: 154653
Date: 7/17/2023
Pickleball Court - Turnkey Lighting w/ LSI Fixtures
Invoice To:End User:
Finance Department
City of Winter Springs
1126 East State Road 434
Winter Springs FL 32708
City of Winter Springs
Hound Ground, 900 E State Road 434, Winter Springs , FL 32708, US
Description Rate Quantity Price
Inclusions:
• Labor and materials included to provide a full turn-key lighting package with LSI fixtures at the new Winter
Springs pickleball courts.
• Provide and install twenty-four (24) direct burial concrete posts with twenty-six (26) LSI Zone lighting fixtures.
• Install light fixtures and set concrete poles with auger and boom truck.
• Provide and install approximately 1500’ of PVC raceway.
• Provide and install new circuitry for lighting circuits as discussed during walk through.
• Provide and install twenty-four (24) flush grade pull boxes near pole light locations.
• Trencher rental is included.
Exclusions:
• Repairs to existing systems outside the scope of this project.
Clarifications:
• Proposal is based on using LSI lighting fixtures for USA Pickleball official lighting partner.
• Additional direct burial poles have been provided to increase the foot-candles on the outer perimeter of pickelball
courts to meet a minimum of 20 foot candles.
• Labor is figured as straight time during a normal workweek – Monday through Friday.
• Due to the current volatility of commodities, this proposal is valid for thirty-days from date of proposal.
$195,005.00 1 $195,005.00
Site Total:$195,005.00
Summary
Hound Ground, 900 E State Road 434, Winter Springs , FL 32708, US $195,005.00
Tax $0.00
Total $195,005.00
508
Date:6/16/2023 Page 1 of 1
Email
LSI Industries
10000 Alliance Road
Cincinnati, OH 45242
Voice Number : 513-666-4242
Project: Winter Springs Pickleball
Location: Winter Springs, FL
32ft 32ft 32ft 32ft 32ft
Calculations use a LED Maintained Lamp Lumen factor based upon 50,000
hours of life, derived from IES TM21-11.
Based on the information provided, all dimensions and luminaire
Locations shown represent recommended positions. The engineer
and / or architect must determine applicability of the layout
to existing or future field conditions.
Note: Types A & A1 fixtures are tilted 15 degrees above horizonta, Except for the 50L fixtures. those willbe a zero tilt.l
The light levels shown are maintained using a .94 light
loss factor (LLF). Light loss factors are used to adjust
the light output of a luminaire operating in a controlled
laboratory environment to the output obtained under actual
field conditions. The LLF used in these calculations includes
both recoverable and non-recoverable factors. Recoverable
factors include luminaire dirt depreciation (LDD).
Non-recoverable factors include optical system variations,
and depreciation in initial luminaire lumen output. The use of the
light loss factor shown requires making certain assumptions about
the lighting system, the specific application, and the maintenance
of the system over time. Therefore, actual light levels measured
in the field may vary from the calculated values, especially in
regards to individual location measurements.
Date:6/16/2023
Filename: WINTER SPRINGS4.AGI
26 32 34 35 35 34 34
32 36 41 46 41 37 39
41 44 48 47 46 41 42
44 46 47 45 42 39 37
47 52 51 46 39 33 31
52 53 52 46 39 33 31
53 53 53 47 39 34 31
48 53 52 48 40 35 32
47 52 52 49 44 39 37
48 49 53 52 48 42 42
39 42 47 50 43 38 39
31 36 38 38 36 34 35
34 34 34 35 34 32 30
39 36 39 43 38 33 33
42 40 42 41 40 37 38
36 37 36 35 34 35 34
30 30 29 29 29 29 29
29 29 28 28 29 29 29
30 30 29 29 29 29 30
32 32 31 30 30 31 32
36 37 36 34 34 36 36
42 40 42 41 40 37 41
39 36 39 42 37 34 35
34 34 34 35 33 32 31
31 33 35 36 35 33 31
34 35 39 44 39 35 34
38 38 42 43 42 39 39
35 37 37 37 37 38 36
37 39 41 41 41 40 39
41 44 45 46 47 46 43
48 52 54 55 56 55 51
57 60 67 69 69 64 61
30 32 34 35 35 35 34
34 34 38 43 39 37 39
38 38 40 41 42 40 42
35 36 35 35 37 37 37
31 31 30 30 30 30 30
32 31 30 30 29 30 30
34 32 31 31 30 30 30
36 34 33 32 32 32 32
43 40 38 36 37 37 36
49 44 43 42 42 40 42
44 39 40 43 39 36 39
38 36 35 35 34 34 34
34 34 35 35 34 32 26
39 37 41 46 41 36 32
42 41 46 47 48 44 41
37 39 42 45 47 46 44
31 33 39 46 51 52 47
31 33 39 46 52 53 52
31 34 39 47 53 53 53
32 35 40 48 52 53 48
37 39 44 49 52 52 47
42 42 48 52 54 49 48
39 38 43 50 47 42 39
35 34 36 38 38 36 31
COURT 1
COURT 2
COURT 3
COURT 4
COURT 5
COURT 6
COURT 7
COURT 8
COURT 9
COURT10
COURT11
COURT12
COURT13
COURT14
Luminaire Schedule
Symbol Qty Label Arrangement Description LLF Luminaire Lumens
Calculation Summary
Luminaire Watts Total Watts
18 A SINGLE ZNL-78L-CT-50 (ZONE LARGE) @ 25' MTG. HT.
Label CalcType Units Avg Max Min Max/Min
COURT 1
0.940 80625 648 11664
Illuminance Fc 39.68 48 26 1.85
COURT 2 Illuminance Fc 43.68
2 A1 TWIN ZNL-78L-CT-50 (ZONE LARGE) @ 25' MTG. HT. 0.940 80625 648 2592
4 A2 SINGLE ZNL-50L-CT-50 (ZONE LARGE) @ 25' MTG. HT. 0.940 54622 375 1500
53 31 1.71
COURT 3 Illuminance Fc 42.86 53 31 1.71
COURT 4 Illuminance Fc 36.46 43 30 1.43
COURT 5 Illuminance Fc 29.64 32 28 1.14
COURT 6 Illuminance Fc 36.68 42 31 1.35
COURT 7 Illuminance Fc 36.86 44 31 1.42
COURT 8 Illuminance Fc 50.29 69 37 1.86
COURT 9 Illuminance Fc 36.86 43 30 1.43
COURT10 Illuminance Fc 31.18 36 29 1.24
COURT11 Illuminance Fc 39.11 49 34 1.44
COURT12 Illuminance Fc 39.68 48 26 1.85
COURT13 Illuminance Fc 43.68 53 31 1.71
COURT14 Illuminance Fc 42.89 54 31 1.74
REXELREXEL ORLANDO
JAY HENDLEY
JOSEPH.HENDLEY@REXELUSA.COM
407-760-6019
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565