March 7, 2023
Mr. Philip Hursh, P.E.
City of Winter Springs Director of Public Works
400 Old Sanford Oviedo Road
Winter Springs, FL 32708
RE: City of Winter Springs Emergency Repairs after Hurricanes
Northern Way Bridges over Howell Creek(Bridge #775703 and#775709)
FBT Project Number 22-100.01
Dear Mr. Hursch:
Florida Bridge and Transportation, Inc. (FBT) performed several site visits to determine the extent
of the required repairs and the to observe the contractor's progress performing the repairs. FBT
finds the structural integrity of the bridges have been restored to the condition prior to the storms.
The bridges can be opened to traffic once the repairs are completed and the City has accepted the
construction. The bridges are the "South" Bridge (#775703) on Northern Way located 0.5 Miles
South of Winter Springs Blvd (according to FDOT bridge inspection reports) and the "North"
Bridge (#775709) on Northern Way located 0.4 mi West of Vistawilla Drive (per FDOT inspection
reports). The repairs at both sites consisted mostly of reconstructing the embankment due to scour,
and other associated items such as rebuilding damaged portions of approach slabs and guardrail.
The North Bridge (#775709) had significantly more erosion damage resulting from a water main
which burst as a result of the storm. For this site, FBT ran some calculations to verify the integrity
of the wingwall during construction. The contractor was informed the corrective measures included
restoring the creek bed material at the outside face of the wingwall, constructing new FDOT Rubble
Riprap (bank and shore), sealing the joints in the precast walls with geotextile fabric (to minimize
the migration of fines through the wall), and backfilling the areas (evenly on both sides of the wall
to the greatest extent possible), and replacing the north approach slab with barriers and sidewalk.
The contractor monitored the top of the wingwall for excessive deflections as the fill was being
placed. No calculations were necessary at the South Bridge (#775703). The attached 3-page
document was provided to the contractor to define the repair procedure for the North Bridge.
With the repairs being completed, the bridges can be opened to traffic and use by the general public.
Let me know if you have any questions or comments.
TIIITIl7�
Very truly yours, ��`ci�jEDERr��
Florida Bridge and Transportation, Inc.
CEN
No 145957
G ,
DgilIN s rl by Mark Nletlermann
DN:C If Mark Niatlermann, V • • V
d-If 861SPOR39993AD9C, `� v /�
Mark Nledermann P.E. Mark Niedermann D-�LRORIDABRIDGEPND RANSPORTA ON �7 STATE OF
9699
President DaEa29 2 29),392 . ��0,<; OR I
1,F111111"00,ONAL0J
633 Dartmouth Street Orlando, ]FL 327804*Phone(407) 513-9709 Fax(407)513-9712
Northern Way(North Bridge No 775709) Repairs
lift
F
'' r
Repairs at NW wingwall[washout area)
and north approach slab North
5 Xr
yam.
L
NORTH
a
y Yrs,�, ♦. �+ ..,�, Iq.�;�"S+.`T f 9��_
r l
Aerial View at Site
North Wingwall Repairs:
The hurricanes caused some scour outside the wingwall and the burst water main caused erosion inside the wingwall
and under the bridge's approach slab. The corrective measures include restoring the creek bed material at the outside
face of the wingwall, constructing new FDOT Rubble Riprap (bank and shore), sealing the joints in the precast walls with
geotextile fabric(to minimize the migration of fines through the wall), and backfilling the areas (evenly on both sides of
the wall to the greatest extent possible), and replacing the north approach slab with barriers and sidewalk. Monitor the
top of the wingwall for excessive deflections as the fill is being placed.
;\ y
Via. gyp ,
IN end of;ww.
the wingwall`
4 t*
end of wingwall �L
nearest the bridge 1
end bent
a
slope the rip rap up(toward the free end)along the 1E r
outside face of the wing wall
Ile,
When
-
i
�t
• .�:� _ 271. J r 6t{rf lff 1.
CC'
fn
placing fill inside
Approach Slab replacement:
Replace the existing north approach slab (at least from the centerline of the roadway to the washout area) and place
new compacted embankment under the approach slab. Preliminary measurements performed by FBT showed the
embankment settled below the approach slab at least 22 feet from the outside edge of the approach slab (extending to
the centerline of the roadway). You may find the settlement continued beyond the centerline so be prepared to replace
the entire north approach slab.