Loading...
HomeMy WebLinkAbout2023 03 07 Florida Bridge and Transportation, Inc. (FBT) Northern Way Bridges over Howell Creek Emergency Repairs Letter (Bridge #775703 and #775709) FBT Project No: 22-100.01 li II, Florida Bridge and Tra nsportatioffn, Inc. Engineers eers I FBT PIARIDABRIDGE &TRANSPORTATION March 7, 2023 Mr. Philip Hursh, P.E. City of Winter Springs Director of Public Works 400 Old Sanford Oviedo Road Winter Springs, FL 32708 RE: City of Winter Springs Emergency Repairs after Hurricanes Northern Way Bridges over Howell Creek(Bridge #775703 and#775709) FBT Project Number 22-100.01 Dear Mr. Hursch: Florida Bridge and Transportation, Inc. (FBT) performed several site visits to determine the extent of the required repairs and the to observe the contractor's progress performing the repairs. FBT finds the structural integrity of the bridges have been restored to the condition prior to the storms. The bridges can be opened to traffic once the repairs are completed and the City has accepted the construction. The bridges are the "South" Bridge (#775703) on Northern Way located 0.5 Miles South of Winter Springs Blvd (according to FDOT bridge inspection reports) and the "North" Bridge (#775709) on Northern Way located 0.4 mi West of Vistawilla Drive (per FDOT inspection reports). The repairs at both sites consisted mostly of reconstructing the embankment due to scour, and other associated items such as rebuilding damaged portions of approach slabs and guardrail. The North Bridge (#775709) had significantly more erosion damage resulting from a water main which burst as a result of the storm. For this site, FBT ran some calculations to verify the integrity of the wingwall during construction. The contractor was informed the corrective measures included restoring the creek bed material at the outside face of the wingwall, constructing new FDOT Rubble Riprap (bank and shore), sealing the joints in the precast walls with geotextile fabric (to minimize the migration of fines through the wall), and backfilling the areas (evenly on both sides of the wall to the greatest extent possible), and replacing the north approach slab with barriers and sidewalk. The contractor monitored the top of the wingwall for excessive deflections as the fill was being placed. No calculations were necessary at the South Bridge (#775703). The attached 3-page document was provided to the contractor to define the repair procedure for the North Bridge. With the repairs being completed, the bridges can be opened to traffic and use by the general public. Let me know if you have any questions or comments. TIIITIl7� Very truly yours, ��`ci�jEDERr�� Florida Bridge and Transportation, Inc. CEN No 145957 G , DgilIN s rl by Mark Nletlermann DN:C If Mark Niatlermann, V • • V d-If 861SPOR39993AD9C, `� v /� Mark Nledermann P.E. Mark Niedermann D-�LRORIDABRIDGEPND RANSPORTA ON �7 STATE OF 9699 President DaEa29 2 29),392 . ��0,<; OR I 1,F111111"00,ONAL0J 633 Dartmouth Street Orlando, ]FL 327804*Phone(407) 513-9709 Fax(407)513-9712 Northern Way(North Bridge No 775709) Repairs lift F '' r Repairs at NW wingwall[washout area) and north approach slab North 5 Xr yam. L NORTH a y Yrs,�, ♦. �+ ..,�, Iq.�;�"S+.`T f 9��_ r l Aerial View at Site North Wingwall Repairs: The hurricanes caused some scour outside the wingwall and the burst water main caused erosion inside the wingwall and under the bridge's approach slab. The corrective measures include restoring the creek bed material at the outside face of the wingwall, constructing new FDOT Rubble Riprap (bank and shore), sealing the joints in the precast walls with geotextile fabric(to minimize the migration of fines through the wall), and backfilling the areas (evenly on both sides of the wall to the greatest extent possible), and replacing the north approach slab with barriers and sidewalk. Monitor the top of the wingwall for excessive deflections as the fill is being placed. ;\ y Via. gyp , IN end of;ww. the wingwall` 4 t* end of wingwall �L nearest the bridge 1 end bent a slope the rip rap up(toward the free end)along the 1E r outside face of the wing wall Ile, When - i �t • .�:� _ 271. J r 6t{rf lff 1. CC' fn placing fill inside Approach Slab replacement: Replace the existing north approach slab (at least from the centerline of the roadway to the washout area) and place new compacted embankment under the approach slab. Preliminary measurements performed by FBT showed the embankment settled below the approach slab at least 22 feet from the outside edge of the approach slab (extending to the centerline of the roadway). You may find the settlement continued beyond the centerline so be prepared to replace the entire north approach slab.