Loading...
HomeMy WebLinkAbout2022 12 12 Informational 200 - Current Development Projects Summary • CITY OF WINTER SPRINGS, FLORIDA COMMUNITY DEVELOPMENT DEPARTMENT fneorp4ra[ed Current Development Projects Summary Pre-Applications and Non-Binding Reviews • Pre-application meetings are required for all projects before a formal submittal is permitted. During these meetings, applicants will outline their proposed project to staff and staff will provide feedback and explain the development review process. • Non-binding reviews are sometimes recommended by staff if a proposed project is potentially controversial. Non-binding reviews undergo a very high-level review by staff with some comments provided to the applicant. The intent is for the applicant to present the project to the City Commission to gauge their receptiveness to the proposed project. PROJECT NAME LOCATION LAST ACTION ITEM CURRENT STATUS Avid At Winter Springs West side of Tuskawilla Non-Binding Application Non-Binding presentation (Formerly Winter Springs Rd.just south of Milky under review at City Commission in Mixed Use) Way(County Enclave) December 1270 Belle Ave West side of Belle Ave. Pre-application meeting Awaiting formal submittal just south of SR 434 held on October 27 Exxelia (Expansion) Northeast corner of Pre-application Awaiting formal submittal Highway 17-92 and meeting held on July Shepard 14 The Adel at Lake Jesup North side of Orange Ave n/a Awaiting complete non- binding application Sutton Crossings Town Center Pre-application meeting Awaiting formal Southeast corner of SR held on July 22 application 434 and Tuskawilla,just south of Mobil station CASTO Winter Springs North side of SR 434 just Pre-application meeting Awaiting formal submittal east of Michael Blake on November 17 Blvd Dunkin' Donuts North side of SR 434 just N/A Pre-application meeting east of Michael Blake scheduled for December Blvd 15 14 Development Protects in Review • These are projects that have gone past the stage of a pre-application meeting and are in various stages of the development review process.These projects could be anywhere from confirming that the application is complete all the way through to approval of the project by the City Commission or even beyond that to final site acceptance. PROJECT NAME LOCATION LAST ACTION ITEM CURRENT STATUS Chase Bank Town Center Community Workshop Site Acceptance Pending Adjacent to Wendy's was held on 02/20/20 CUP and DA approved by the CC on 11/16/20. DA, Final Engineering, Waiver,&Aesthetic Plans approved by the CC 10/25/2021. Hickory Grove Town Center A Non-Binding review Preconstruction Townhomes was held at the CC on meeting held on Northeast of Bear Springs 02/25/2021. 06/01/22 132 Single-Family Drive and Blumberg Blvd. Homes(Attached) Community Workshop Second was held on 08/26/2021. preconstruction DA, Final Engineering, meeting held on Specimen Tree Removal, 8/19/22 Waivers,Variance,& Aesthetic Review PZB recommended approval on 02/10/22. Waivers 1&2,Variance, &Aesthetic Review approved by CC on 03/14/22. DA, Final Engineering, Specimen Tree Removal, &Waiver 3 approved by CC on 05/23/22. Fifth Third Bank Town Center Community Workshop Public Hearing at City held on August 15 Commission Southwest corner of SR (December 12) 434 and Tuskawilla Living Life Development North Side of W SR 434, N/A Resubmitted plans (ILF) west of Fountaintree Dr. under staff review(4th review) The Studios at Vistawilla Dr. New application Awaiting complete Tuscawilla Adjacent to Seminolesubmitted in July 2022 application materials Trail Animal Hospital 15