HomeMy WebLinkAbout2022 10 24 Consent 301 - Lift Station 7W Improvements • CONSENT AGENDA ITEM 301 Incnrinreted CITY COMMISSION AGENDA I OCTOBER 24, 2022 REGULAR MEETING 1959 TITLE Lift Station 7W Improvements SUMMARY Lift station 7W (LS 7W). LS 7W is a master lift station that receives direct flow from 4 lift stations and is downstream of 6 additional lift stations. The flow from this lift station is pumped directly to the West Water Reclamation Facility. This lift station was identified as a critical lift station in the 2022 Wastewater and Reclaimed Water Master Plan and included in the 2022 Capital Improvement Plan project list, design in 2022 and construction in 2023. The existing lift station is a triplex, buried-can style lift station that was installed in 1995. There have been a few modifications since its installation which has allowed the lift station to continue to operate for 27 years. The existing on-site generator was repurposed and is capable of providing secondary power to the lift station and Water Treatment Plant#3. This generator is outdated and parts to maintain the equipment are not readily available. The current pumps installed are 20 horsepower pumps, Fairbanks and Flygt are the manufacturers. The improvement will include, but are not limited to, the following items: Removing or abandoning the existing wet well Remove existing generator and consideration for installing the new generator inside the building • Designing a new lift station: wet well and valve vault to meet current resiliency standards • Reconfigure existing gravity system, remove vitrified clay pipe (VCP) and cast iron (CI) to be replaced with PVC pipe New generator with diesel storage New pumps, floats, control panels and variable frequency drive (VFDs) This agenda item would approve Kimley-Horn to redesign lift-station 7W with 15 a fee not to exceed $165,300. RECOMMENDATION Staff requests that the City Commission approve the construction services for lift station 7 improvements/redesign and enter into a contract with Kimley- Horn in the amount of$165,300 and for authorization for the City Manager and City Attorney to prepare and execute any and all applicable contract documents consistent with this Agenda item. 16 Kimley>>> Horn August 26, 2022 Public Works Director City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708 Re: Lift Station 7W Improvements Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "Consultant") is pleased to submit this letter scope (the "Scope") to the City of Winter Springs, FL ("City") for providing Lift Station 7W Improvements. This Scope is for a work release authorization under RFP #01-21 Civil Engineering Continuing Service Contract. Project Understanding The CITY has requested design improvements for lift station 7W(LS 7W). LS 7W is a master lift station that receives direct flow from 4 lift stations and is downstream of 6 additional lift stations. The flow from this lift station is pumped directly to the West Water Reclamation Facility. The Pump Station Assessment completed by Veolia in 2019 stated the condition of this lift station as "needs maintenance." This lift station was identified as a critical lift station in the 2022 Wastewater and Reclaimed Water Master Plan and included in the 2022 Capital Improvement Plan project list, design in 2022 and construction in 2023. The existing lift station is a triplex, buried-can style lift station that was installed in 1995.There have been a few modifications since its installation which has allowed the lift station to continue to operate for 27 years. The existing on-site generator was repurposed and is capable of providing secondary power to the lift station and Water Treatment Plant #3. This generator is outdated and parts to maintain the equipment are not readily available. The current pumps installed are 20 horsepower pumps, Fairbanks and Flygt are the manufacturers. The improvement will include, but not limited to, the following items: • Removing or abandoning the existing wet well • Remove existing generator and consideration for installing the new generator inside the building • Designing a new lift station: wet well and valve vault to meet current resiliency Standards • Reconfigure existing gravity system, remove vitrified clay pipe(VCP) and cast iron (CI) to be replaced with PVC pipe • New generator with diesel storage • New pumps, floats, control panels and variable frequency drive (VFDs) 189 S Orange Avenue., Suite 1000, Orlando, FL 32801 17 Kimley>>> Horn Kimley-Horn respectfully requests approval from the CITY to provide these general engineering services as requested by the CITY's staff and has prepared the following specific scope of services to be provided as requested. Specific Scope of Basic Services Task 1 —Design Services A. Kimley-Horn will attend a kick-off meeting with the City to review the project scope and discuss project elements to be included within the design plans. B. Kimley-Horn will use the buildout wastewater demands, established in the wastewater model and master plan, to prepare lift station design calculations to evaluate the ability of the lift station wet well to provide adequate volume. C. Kimley-Horn will prepare conceptual plans (30% design). Kimley-Horn will lead 30% design review meeting with City staff to review and receive comments. D. Kimley-Horn will enlist the services of an electrical engineering subconsultant to perform the required electrical design for the proposed lift station modifications. This work will include configuring the primary and secondary power(generator)for the new pumps and VFDs, lighting, and lightning protection. E. Kimley-Horn will coordinate the needed survey with the surveyor, ECHO UES, Inc., to provide a topographical survey of the existing parcel, existing lift station site and Subsurface Utilities Engineering (SUE) to locate and identify existing piping, conduit and other utilities under the surface. See attachments for the full surveyor's scope. F. Kimley-Horn will coordinate the needed geotechnical information with the geotechnical firm, Terracon, to perform (3) to (5) geotechnical borings, 35 feet deep, at the location of the proposed new wet well and two other locations. See Attachments for the full scope. G. Kimley-Horn will prepare 60% design plans, 60% specifications, and opinion of probable construction cost (OPCC) for the proposed lift station and electrical improvements. H. Kimley-Horn will prepare 90% design plans, 90% specifications, and opinion of probable construction cost (OPCC) for the proposed lift station and electrical improvements. I. Kimley-Horn will prepare 100% design plans, 100% specifications, and opinion of probable construction cost (OPCC) for the proposed lift station and electrical improvements. J. Kimley-Horn will prepare one (1) set of Construction Documents (CDs) which will include: • Cover Sheet 189 S Orange Avenue., Suite 1000, Orlando, FL 32801 18 Kimley>>> Horn • Existing Conditions/Demolition Plan • Site Plan • Paving, Grading and Drainage Plan • Utility Plans • Mechanical Plans • Structural Plans • SWPPP and Erosion Control Notes • Electrical Plans provided by subconsultant • Civil Details and Construction Specifications Task 2: Permitting Services A. Kimley-Horn will prepare an FDEP Notification/Application for Construction of A Domestic Wastewater Collection /Transmission System (62-604.300(8)(a)) submittal. The scope consists of preparation of one permit application and supporting documents and response to a maximum of two reasonable requests for additional information. All permit application fees will be paid by the City. B. Prepare and submit 100% drawings and specifications to the City's Building Department for preliminary review and comment. One (1) meeting with Building Department staff will be included to review comments. It is anticipated that the successful contractor will submit the formal permit application and permit fees to the City's Building Department after contract award. Permit fees not included in the design fee and shall be paid by the City, if applicable. C. Kimley-Horn will prepare a St. Johns River Water Management District (SJRWMD) ERP permit and National Pollutant Discharge Elimination System (NPDES) Permit application. The scope consists of preparation of two permit applications for the respective agencies and supporting documents with each application. Responses to a maximum of two reasonable requests for additional information are included with each application. All permit application fees will be paid by the City. These permits are anticipated due to the nearby drainage easements, creek, and flood plain. Task 3: Bidding and Award Services Upon authorization to proceed with the bidding and award phase of the project, Kimley-Horn will complete the following tasks for the bid phase: A. Provide one (1) hard copy of the Contract Documents (engineering design drawings and specifications) and any addenda, which may be issued to bidders. Also, one (1) digital copy will be provided which will include the following electronic documents: • Drawings and Specifications in PDF format 189 S Orange Avenue., Suite 1000, Orlando, FL 32801 19 Kimley>>> Horn • Drawings in AutoCAD format • Specifications in MS Word format • Signed & Sealed drawings in PDF format • Estimated Opinion of Probable Construction Cost in PDF format B. Attend and lead a pre-bid conference. C. Provide written response to questions from bidders, prepare and issue addenda to City staff as required to interpret, clarify, or expand the Bidding Documents. D. Assist the City in evaluating bids and provide a recommendation for the award of the construction contract. Schedule Kimley-Horn will begin services upon receipt of an executed Task Order. This authorization can be in the form of an email from the City Manager or issuance of a Purchase Order from the City. The above services will be provided as expeditiously as practicable to meet a mutually agreed upon schedule. Task Description Timeframe 1 Design Services 32 weeks 2 Permitting Services 12 weeks 3 Bidding and Award Services 4 weeks Method of Compensation Kimley-Horn will complete the above scope of services on a lump sum fee of $165,300.00 inclusive of office overhead expenses. A breakdown of the fee by task is as follows: Task Description Lump Sum Fee 1 Design Services $83,000 Subconsultant— ECHO $9,000 Subconsultant- Terracon $4,500 Subconsultant - Electrical $40,000 2 Permitting Services $17,200 3 Bidding and Award Services $9,600 Total $165,300 189 S Orange Avenue., Suite 1000, Orlando, FL 32801 20 Kimley>>> Horn Services provided under this authorization will be invoiced on a monthly basis. All invoices will include a description of services provided. In an effort to expedite invoices and reduce paper waste, Kimley-Horn submits invoices via email in an Adobe PDF format. We can also provide a paper copy via regular mail if requested.We request the City to include the invoice number and Kimley-Horn project number with all payments. Please provide the following contact information for invoices: Please email all invoices to Additional Services Services requested that are not specifically included in the general range of the services listed above can be provided under an amendment to this authorization or under a new and separate agreement. The following services may be made available for the City as additional services upon request: • Bypass pumping design for the installation of new manholes, wet well, or unforeseen modifications to the lift station. • Retaining wall design or structural analysis • Construction Phase Services • Dewatering Plan • Landscaping plans • Additional survey, geotechnical investigation, beyond those items mentioned in the scope above or the attachments to this scope. If you concur in all the foregoing and wish to direct us to proceed with the services, please have authorized persons execute a task authorization for this scope of services and transmit via email to Lance.Littrell(o-)_Kimley-Horn.com. We will commence services after we have received a fully-executed task authorization. We appreciate the opportunity to provide these services to you. Please contact me at your earliest convenience with any questions regarding this scope of services. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. By: Lance R. Littrell, P.E. Jon Martin, P.E. Senior Project Manager Senior Vice President 189 S Orange Avenue., Suite 1000, Orlando, FL 32801 21 Kimley>>> Horn Authorization City of Winter Springs, Florida By: Shawn Boyle, City Manager (Date) Shawn Boyle (Print or Type Name) sboyle winterspringsfl.org (Email Address) Attest: (Print or Type Name) 189 S Orange Avenue., Suite 1000, Orlando, FL 32801 22 Cl) C14 §§§\ \\§§§}}}§§) w §§ / - �q \ mo Ism. / � ` F \