HomeMy WebLinkAbout2021 09 13 Consent 304 - Torcaso Restrooms South Side • CONSENT AGENDA ITEM 304
,n m=ared CITY COMMISSION AGENDA I SEPTEMBER 13, 2021 REGULAR MEETING
1959
TITLE
Torcaso Restrooms South Side
SUMMARY
Recently the home at 120 Flamingo was purchased by the City. The home and
land is located between city property which connects to Torcaso Park. The
South side of the park already has refurbished basketball courts. The plan is
to build a second Pavilion on the south side of the pond connecting it to the
Pavilion on the North side by a boardwalk across the pond. Also, we plan for
a dog park on the property on the corner of Flamingo and N. First Street. The
North side of the park has Restrooms near the playground and the location of
the new Pavilion. With all these activities on the south side of the park the
acquisition of the small home is opportunistic to renovate it into restrooms
and a storage room for the park. The renovation would be much more
economical than building a structure from scratch. The last two restroom
structures cost the city between $200,000 and $300,000. The renovation of
this facility would be around $100,000.
RECOMMENDATION
In Summary, It is staff's recommendation to renovate the home into two
restrooms and a storage facility. A majority of the work involved will be
accomplished by City Staff. It is estimated that the renovation to cost
$100,000. A 10% contingency is being requested for any unknown scope
increases with renovations. The Total project cost, not to exceed and
including the contingency is $110,000. Additionally, authorization for the City
Manager and City Attorney is requested to prepare and execute any and all
applicable contract documents consistent with this Agenda item.
93
CITY OF WINTER SPRINGS
FLAMINGO COST ESTIMATE
ITEM ESTIMATED COST
Architect 8,500
Electrical Engineer 2,000
Mechanical Engineer 2,000
Permit 1,000
Dumpster for removal of debris 3,000
New Roof (Metal - Blue to match Pavilion) 8,500
Landscaping / SOD 5,000
Block Mason to close in sliding glass door /Windows 5,000
Cinder Block & Morter 1,500
Doors and Windows 5,000
Partitions for both bathrooms 3,500
Wood for Framing Walls 2,500
Sheetrock 5,000
Tile/Thinset for Walls 48" high 15,000
Toilet's (5) 2,500
Sinks (4) 1,000
Urinals (2) 1,000
Paint for walls 1,000
Paint for Floors 1,500
Paint for Outside of Restrooms 1,500
Light Fixtures (Inside and Out) 1,000
Plumbing Materials 2,000
Remove Garage (roof Rotted) 4,000
Concrete 5,000
Plywood for boarding up windows inside 500
Temp Labor 2,000
Home Depot Blanket (for misc items, Nails, Screws) 1,000
Lowes Blanket (for misc items, Nails, Screws) 1,000
Fergusson Blanket (Misc Plumbing items) 1,000
Misc 6,500
TOTAL 100,000
94
�z
W
W� s
El
CL
. 04V.
r o
VI O �
y r
N
r
i
e
blow,
.og-
T
•
• • 1
• 1 •
• • 1 1 •
1 1 1 1 • • 1
• 1
• • 1 • 1 • 1
• • • 1 1 1 • • • 1 •
1 • •
N 't
• J a1r
• w �
Yy
r r
Y 1 ,
f
C
A � S
5
{
ti.
}
R ,
:1
i
R"
1 � •
1:
e
0
0
0
o �
•o
U -0
U -0
0
o
0
o
0
x
w
rn
rn
O
n�
W
O
O
Cn/1�
�1r1
I L.L
i
'Ti
O
O
r
E
0
0
L
c�
m d- o
m
E
E
o
c
E L.L
CN
L
co
m CV
X
w
L r Co
o co
m
k
-
r
' `. EL
iSz
O
0
.� •
1 r�r�