HomeMy WebLinkAbout2021 07 12 Consent 302 - Waste Water Facilities Plan .44 Prt, • CONSENT AGENDA ITEM 302 CITY COMMISSION AGENDA I JULY 12, 2021 REGULAR MEETING 1959 00 WE TITLE Waste Water Facilities Plan SUMMARY The City of Winter Springs has initiated the process of selecting / designing the new treatment processes for East and West Waste Water Treatment. We will be investigating use of the State's Revolving Fund and grants to supplement City funding. Included in the proposed plan will be a capital improvement element and a rate study which is necessary when requesting loans or grants. This consultant will incorporate information from other consultants into this plan. The projects will take twelve months to complete at a cost of$246,700. RECOMMENDATION Authorize the City Manager to execute a Purchase Order with Kimley-Horn to prepare a Waste Water Facilities Plan which will be used for the future grant/loan applications for funding of the two new waste water treatment plants and other associated infrastructure. 1 Kimiey) Horn June 18, 2021 Dale Smith Public Works and Utilities Director City of Winter Springs 400 Old Sanford Oviedo Road Winter Springs, FL 32708 Re: Wastewater Facilities Plan Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "Consultant") is pleased to submit this letter scope (the "Scope")to the City of Winter Springs. FL ("City")for providing design and construction documents for a Wastewater Facilities Plan. This Scope is for a work release authorization under RFP#01-21 Civil Engineering Continuing Service Contract. Project Understanding The City desires to develop a comprehensive Wastewater Facilities Plan for the purpose of identifying and prioritizing capital projects.This scope of services describes the specific tasks to gather information, develop future needs, perform necessary hydraulic analysis, develop costs, report recommendations, and produce a prioritized list of capital project needs. The Wastewater Facilities Plan will focus on capital improvements required to serve the existing, 5, 10, and 20-year future needs of the utility service area. The Wastewater Facilities Plan will generally consist of the following elements. • Prepare system demand projections for the 5, 10, and 20-year time horizons. • Demand projections will include septic to sewer conversion projects identified by the City. • Prepare wastewater and reclaimed water master plans based on the 5, 10, and 20- year demand projections. • Review the FDEP wastewater treatment facility (W ffF) capacity analysis report (CAR) update provided by others. • Review and integrate a WWTF expansion/replacement plan provided by others. • Identify potential projectfunding sources with support to Angie Brewer and Associates, LC. With this project understanding in mind, the specific scope of services to be provided by Kimley-Horn are described below. Specific Scope of Basic Services Task 1 — Data Collection and Utility Demand Projections A. Kimley-Horn will prepare for and attend a project kick-off meeting with City staff. Project objectives, schedule, milestones, communication methods and frequencies, and base information will all be discussed. B. Kimley-Horn will collect and review updated utility information provided by the City. The 189 S OrangeAvenue, Suite 1000, Orlando,FL32801 2 Kimiey)OHorn City will provide Kimley-Horn with the following information: • Any available AutoCAD and/or GIS files of the City's existing wastewater collection system mapping. • The most recent 12-month electronic water billing records. • Discharge monitoring reports(DMR)and monthly operating reports(MOR)forthe past 5-years. • A complete inventory of the City's lift station equipment and physical data including existing pump curves,pump make and model,impeller diameter,wet well dimensions, invert depths, operating pressures, and forcemain sizes in MS Excel format. Kimley- Horn will provide the City with a formatted MS Excel spreadsheet to be used by the City to document the required data. • One year of lift station run-time history in MS Excel format (used for demand estimates). • Current (within 3 months of model development) lift station drawdown test results. Kimley-Horn will provide the City with the draw-down test procedure and results log. The City will provide Kimley-Horn with drawdown test data in MS Word and Excel format. The drawdown test information will be used to calibrate the system model. Inaccuratetest results may cause delaysand additional workduring model calibration. Such delays and additional work will be considered additional services subject to reimbursement per the "Additional Services"terms below. • The recent WWTF capacity analysis reports and WWTF expansion/replacement plan reports. C. Kimley-Horn will review system permits and updated regulatory issues affecting the City's wastewater and reclaimed water systems. This task will include a review of the City's current operating procedures and programs with respect to the proposed FDEP Chapter 62-640 rule amendments. Kimley-Horn will identify potential program changes needed to comply with the proposed rule amendment and review the findings with City staff. The results of the reviewwill be compiled for City staff input and will be summarized in the Master Facility Plan report. D. Kimley-Horn will use data provided by the City, SJRWMD, and US Census Bureau to prepare utility system demand projections as the basis for future wastewater system growth. Kimley-Horn will also meet with City staff to discuss additional large-scale developments and specific projects that should be included in the analysis. The projections will include estimated demands resulting from converting the existing 766 septic systems within the City's service area to central sewer systems. E. Kimley-Horn will allocate future growth into specific-areas within the-service areaforthe purpose of calculating future utility needs and allocate utility demands. This allocation will be performed based on known projects, engineering judgment,and discussions with City staff. System demands will be calculated for the present year, 5, 10, and 20-year projections. Task 2—Wastewater Facility and System Hydraulic Modeling Analysis/Evaluation A. Kimley-Horn will utilize the current wastewater system model for the wastewater collection system hydraulic analysis. Using information provided by the City, Kimley-Horn will update 189 S OrangeAvenue, Suite 1000, Orlando,FL 32801 3 Kimiey) Horn the model to include new lift stations, force mains, and modifications to existing lift stations. Kimley-Horn assumes the existing model is fully functioning and generally up to date with only minor updates(such as new infrastructure and/or corrections to existing infrastructure locations) needed. Comprehensive modifications such as recreating corrupt files and major mapping/model file revisions are not included in this scope of work but can be performed as an additional service. The City's gravity system will not be included in the hydraulic model. However, portions of the City's gravity system that convey wastewater directly to lift stations or receive flows from force mains will be analyzed by estimating the gravity line capacity assuming minimum pipe slope. B. Kimley-Horn will assist the City in two lift station drawdown tests to support proper measurement and pumping assessment of each lift station. The testing procedure and measurements will be identified for City staff to review and participate for use in further drawdown testing of the City's lift stations. The drawdown testing results will have a significant impact on the proper assessment of the City's capacity within the existing collection system and proper assessment is critical to the planning assessment for the City. C. Kimley-Horn will produce a draft master map of the wastewater collection system for the City's review and comment. Kimley-Horn will meet with City staff to review corrections and updates to draft collection system mapping prior to finalizing the collection system mapping. D. Kimley-Horn will create sewer shed service areas for all lift stations within the City's collection system. Present day wastewater demands will be assigned based on water system billing records. The demand allocations will be compared to lift station run-time and pumping rate historyalong with measured wastewater treatment plant influentflows. The estimated demands will be verified by comparing the average per connection wastewater generation rate to the number of active connections within the lift station service area and wastewater treatment facility DMR reports. Future system demands for vacant parcels will be allocated based on future land use designations at maximum allowable density. E. Kimley-Horn will attempt to calibrate the model as close to measured field conditions as reasonably achievable. Generally, model predictions within 15% of observed pumping rates will be considered as acceptable. The City will be notified if this level of accuracy is not achieved with a reasonable amount of effort. If additional field data is required, Kimley-Horn will advise the City of those needs and re-calibrate the model until the system model is reasonably accurate. Additional services may be required to identify system problems that are contributing to prediction error and/or additional model calibration effort due to unforeseen conditions. F. Kimley-Horn will include additional modeling related to any septic to sewer study efforts to identify alternatives to provide service and evaluate potential system wide impacts, if needed. In-depth septic to sewer conversions beyond conceptual level can be completed through an additional services request. G. Kimley-Horn will prepare a series of system hydraulic models for the present year, 5- year, 10-year, and 20-year demand projections. Kimley-Horn will evaluate the existing collection system performance under these conditions and identify areas that are not EMMM 189 S OrangeAvenue, Suite 1000, Orlando,FL 32801 4 Kimiey)OHorn performing up to the City's hydraulic standards. and make system improvement recommendations needed to meet the hydraulic standards. Kirley-Horn will review the initial improvement recommendations with City staff and include staff's input for the final recommendations. H. Kimley-Horn will conduct a one-day workshop with City staff. During the workshop, Kimley-Horn will provide an overview of the hydraulic model, present the model results, and conduct additional live model analyses based on staff input. The results of the additional analyses conducted during the workshop will be included in the Wastewater Facilities Plan report. Task 3— Reclaimed Water System Hydraulic Modeling Analysis/Evaluation A. Kimley-Horn will create a reclaimed water system model to reflect the existing reclaimed water distribution system. Kimley-Horn will perform hydraulic modeling analysis to identify potential system deficiencies in meeting the current and future demand projections. B. Kimley-Horn will prepare a conceptual reclaimed water plan for expanding the existing distribution system based on the City's future plans. Kimley-Horn will use the reclaimed water model to identify distribution line size requirements to meet future demands of the expanded system. C. Kimley-Horn will include a reviewof the reclaimed water system hydraulic analysis during the one-day workshop review of the wastewater collection system results. The results of the additional analyses conducted during the workshop will be included in the Wastewater Facilities Plan report. D. To facilitate expedited project execution during the current fiscal year, Kimley-Horn will prepare a list of early projects priorto the completion of the Facilities Plan.These projects will be used bythe City to help facilitate expansion and connection of the City's reclaimed water and reduce the overall water use by the City. Task 4— Review WWTF Expansion Plan/CAR A. Kimley-Horn will review the preliminary condition assessment and review operational and maintenance history included within the City's Facility Expansion Plan (provided by others). Kimley-Horn will workwith City staff to identify renewal and replacement projects to be included in the 5-year CIP project list. Kimley-Horn will review project descriptions, conceptual project sketch,and an opinion of probable construction cost for each project The project information will be included in the Facility Plan report. B. Kimley-Horn will review the updated CAR completed by others and provided by the City prior to submittal to the FDEP in accordance with FAC 62-620 and FDEP guidelines. Kimley-Horn will provide comments for consideration prior to submitting to FDEP. Task 5 Capital Improvement Program Development A. Kimley-Horn will meet with City staff to update the City's 5-year utility capital improvement project plan. Kimley-Horn will provide brief project narratives and develop opinions of probable construction costs for each project. 189 S OrangeAvenue, Suite 1000, Orlando,FL 32801 5 Kimiey)OHorn B. Kimley-Horn will work with City staff to update the CIP priority list. Kimley-Horn will prepare for and attend up to two working meetings with staff to reach consensus on a draft CIP. C. Kimley-Horn will prepare documentation for the City's utility system financial planning consultant to provide capital improvement project estimates for inclusion in the City's budgeting analysis. Kimley-Horn will modify the 5-year CIP list based on the recommendations made by City staff and the City's financial planning consultant. D. Kimley-Horn will revise the 20-year long range CIP to identify improvements beyond the 5-year planning horizon. The 20-year CIP will identify utility system requirements that are anticipated beyond the 5-year planning horizon. E. Kimley-Horn will prepare a draft Wastewater Facilities Plan document. The Wastewater Facilities Plan will include a section that identifies and describes potential funding sources for the recommended CIP projects. F. Following a draft review and receipt of comments from the City, Kimley-Horn will revise the draft Wastewater Facilities Plan documentto incorporate staff comments and finalize for the final Wastewater Facilities Plan. Kimley-Horn will provide up to three hard copies and one electronic PDF copy of the final Wastewater Facilities Plan. G. Kimley-Horn will prepare for and attend a presentation of the final Wastewater Facilities Plan at a City Commission workshop. Task 6 Usage Rates Study Support A. The City will contract directly with the City's financial planning consultant to support a utility revenue sufficiency analysis to be completed by the City's financial planning consultant. The revenue sufficiency analysis will consist of the input of all financial, statistical, capital, and operational data and assumptions, preparation of a comparative rate survey, two interactive work sessions with City staff to review the results of the analysis and develop scenarios, individual presentations of the analysis to each Commissioner, participation at two public meetings, and review of a report documenting the results of the analysis generated by the financial planning consultant. 189 S OrangeAvenue, Suite 1000, Orlando,FL 32801 6 Kimiey)OHorn Schedule These services will be completed as expeditiously as possible. An estimate of the project schedule is as follows: Task Description Timeframe 1 Utility Demand Projections Report 12 weeks 2 Wastewater Facility and System Hydraulic Modeling 12 weeks Analysis/Evaluation 3 Reclaimed Water System Hydraulic Modeling Analysis/Evaluation 6 weeks 4 Review WWTF Expansion Plan/CAR 4 weeks 5 Capital Improvement Program Development 6 weeks 6 Usage Rates Study Support 6 weeks These timeframes are non-consecutive and may overlap. The overall project time is project to be completed within 12 months. Method of Compensation Kimley-Horn will perform these services for the total lump sum fee of$246,700.00, inclusive of office overhead expenses. Invoiceswill be billed on a percent basis per task.A breakdown of the fee by task is as follows: Task Description Lump Sum Fee 1 Utility Demand Projections Report $29,300.00 2 Wastewater Facility and System Hydraulic Modeling $70,130.00 Analysis/Evaluation 3 Reclaimed Water System Hydraulic Modeling/Evaluation $44,800.00 4 Review WWTF Facility Expansion Plan/CAR $10,520.00 5 Capital Improvement Program Development $69,600.00 6 Usage Rates Study $22,350.00 Total $246,700.00 Services provided underthis will be invoiced on a monthly basis. All invoices will include a description of services provided. In an effortto expedite invoices and reduce paper waste, Kimley-Horn submits invoices via email in an Adobe PDF format. We can also provide a paper copy via regular mail if requested. Include the invoice number and Kimley-Horn project number with all payments. Please provide the following information: Please email all invoices to 189 S OrangeAvenue, Suite 1000, Orlando,FL32801 7 Kimley>>> Horn Additional Services Services requested that are not specifically included that may be requested by the City will be provided under a new and separate authorization or can be performed using an amendment to this scope of services. Kimley-Horn can complete these or other related services upon written authorization by the City. • GIS Database Development • Creating/developing the Wastewater Master hydraulic model • Creating/developing the Reclaim Master hydraulic model • Creating/developing the Water Master hydraulic model • Lift station analysis and efficiency assessments using our patent pending XAC- PAC (pronounced zac-pac) to evaluate existing lift stations motor, pump and hydraulic effectiveness • Additional lift station drawdown testing services and field assessments beyond those specifically listed above If you concur in all the foregoing and wish to direct us to proceed with the services, please have authorized persons execute a task authorization for this scope of services and transmit via email to Lance.Littrell(a)Kimley-Horn.com. We will commence services after we have received a fully-executed task authorization. We appreciate the opportunity to provide these services to you. Please contact me at your earliest convenience with any questions regarding this scope of services. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. By: Lance R. Littrell, P.E. Jon Martin, P.E. Senior Project Manager Senior Vice President 189 S OrangeAvenue, Suite 1000, Orlando,FL32801 8 Kimiey)OHorn Authorization City of Winter Springs, Florida By: Dale Smith, Public Works and Utilities Director (Date) Dale Smith (Print or Type Name) dsmith _wintersprinasfl.org (Email Address) Attest: (Print or Type Name) 189 S OrangeAvenue, Suite 1000, Orlando,FL32801 9 Kimley>>> Horn Tabl e A DESCRIPTION: DIRECT LABOR (MAN-HOURS) SR %A'NV Facilities Plan PRLNC PROD. PROD. PROJ PRO' TECHNICAL PROJECT EXP. LINE rN CHARGE MGR MGR ENG 2 ENG I ANALYST SUPPORT ADMIN SUB TOTAL Electricat Upgrades Desipi and Consumcdon NO.I TASK 7 Data Collection and Utilit•Demand Projections Kick Off Meetine and Pre aiadon 5 6 6 2 $3,074 Collect and Review Data Provided By City 6 18 32 10 $9,152 Develop and Frn-mulate Demand Projection, 6 24 40 4 570,596 Allocate Future Cnowth Areas-Demand Probctions 4 10 30 2 ,$6,470 TaskTmal 529,292 2 Wastewater Facility and System Hydraulic Modeling Amlysis/Evaluation Update Existing Wastewater S ystcm Modcl PI-ovided By City 3 12 20 32 5 $9,953 Lift Station Drawdown Testi (2stations) 4 10 12 4 $4,790 Master Ma Develo enentand Review 2 8 12 24 2 $6.662 Inte ate Demands,Lift Station and FM System Fi eld Dtlta 2 20 8 30 4 $8,910 Model Calibration based en Collected Data 2 6 34 48 6 S12,874 Septic to Sewer Modeling 1 4 12 16 1 $4.701 Seenariu Develo Inept and Model Simu1a6— 4 16 32 48 6 514.654 Model Review Workshop 8 10 12 16 4 $7,590 TaskTotal 570.134 3 Reclaimed Water Svstem HvdrauGe Modeling/Evaluation Create the Reclaimed Water Sy.tcm Model 2 12 36 44 4 513,448 Reclaimed Water Plan 6 18 24 28 2 Sl 1,452 Reclaimed Water System Model Workshop 8 10 12 16 4 $7,590 Evaluate the Reclaimed System for Early Out Project Support 12 28 40 572,332 Task Total 544,822 4 Review W WTF Facility Expansion Plan/CAR(By Other) Review Condition Assessment,Expansion Plan,and 5-year CIP List with OPCCs 4 12 8 24 4 $7,368 Review CAR Sunmittal and Comments 4 8 6 2 $3,152 Task Total S10,520 5 Capital Improvement Program Development Updates-yearutilityeapitalimprovemetuprojectplan 81 1 18 16 32 4 511,442 Ul)date CIP Priori uv List 10 20 12 32 6 511,830 Financiat Plarwinq Cotvuhaut Support&CIP Revisions 4 12 8 16 4 $6,368 20-Year,CIP Improvements 4 14 81 20 3 $7,101 Wastcwatcr Facilities Daft 12 24 30 40 6 12 517,846 Wastewater Facilities Final Report 4 8 12 26 4 6 $8.252 Cit,CornJusionWorlishop 12 16 8 4 $6.764 Task Total 569,603 6 Usage Rates Stud Uility Revenue Saficiency Analysis Support to Financial Consultant 6 10 4 $3.530 (2)Workshos with City Stiff 8 12 16 6 $6.598 Commissioner Presentations 10 151 0 4 10 $6,155 2)Public Meetings 6 81 4 2 8 $4.152 Review ofReveunue Sufficiency Analysis Report 4 6 0 $1,914 Task Tom I 522,349 TOTALHOURS 0i 1711 01 31)51 308 682 18 125 $0 $246,720 LABOR $/HOUR $ 260.00 1$ 240.00 1$195.00 1 159.001S 14,5.001's 125,00 1 S 130.00 IS 85.00 SUBTOTAL $ $ 41,040.00 $ $ 62sos.00 s 44,660,00 $ ss.2saoo s 2,340.00 5 10625.00 s $246,720 • • :• S OrangeAvenue, Suite 1000, Orlando,FL32801 �1 :•: 10