Loading...
HomeMy WebLinkAbout2021 06 14 Consent 301 - Seminole Crossing Townhomes (WS Town Center) Site Acceptance .44 P'rt' • CONSENT AGENDA ITEM 301 CITY COMMISSION AGENDA I JUNE 14, 2021 REGULAR MEETING 1959 00 WE TITLE Seminole Crossing Townhomes (WS Town Center) Site Acceptance SUMMARY The approved (12/09/2019) residential single-family home (attached) project is within the Winter Springs Town Center District, located on the northeast corner of Michael Blake Boulevard and Tree Swallow Drive, the north side of E SR 434 and east of Tuskawilla Rd. on -8.33 acres of land. The project includes the construction of 114-unit townhome subdivision and a single story cabana with a swimming pool. The proposed development will include a connection on Tree Swallow Drive from Michael Blake Blvd., stormwater is master planned into The Blake Apts. retention pond, utilities infrastructure w/ water & sewer facilities, perimeter landscaping, irrigation, etc. This agenda item is for the conditional acceptance of the site improvements. The site work has been constructed in substantial compliance with the Final Engineering Plans approved by the City Commission, except as noted on the attached punch-list, Exhibit A. RECOMMENDATION Staff recommends the City Commission validate the Staff recommendation finding the site work to be built in substantial accordance with the Final Engineering plans, subject to satisfactory completion of the remaining open punch-list item(s). 1 CITY OF WINTER SPRINGS COMMUNITY DEVELOPMENT DEPARTMENT 1126 East State Road 434 Winter Springs,Florida 32708 customerservicegwinterWrin sg fl.org 1959 Project Closeout List for City Commission Final Site Acceptance PROJECT: Seminole Crossing Townhomes—Northeast corner of Michael Blake Blvd & Tree Swallow Dr. 1. Complete all site work and pass the final engineering inspection. Contact Rachel Gironella at 407-327- 5973 or email RGironella(a�,WinterSprin sg FL.org to schedule a preliminary and/or final engineering inspection. The final inspection will occur after receipt of the record drawings from the engineer-of- record. • Construction Site Walk-through completed on February 2021 2. Submit a Bill of Sale for all infrastructure being turned over to the City for ownership and maintenance (streets, utilities, sidewalks, etc.). Use the City's standard Bill of Sale form. Submit final document to the Finance Department. This includes the cost sheet with Engineer of Record's certification. 3. Submit 2-Year Maintenance Bond, Letter of Credit, or Cash Escrow Deposit(10% of the value of the improvements to be owned and maintained by the City, as listed on the Bill of Sale)to the Finance Department. 4. Obtain Approvals from all City Departments and Seminole County Fire Department. 5. Submit FDOT Permit Certification and provide City copy of FDOT approval. 6. Submit a copy of the FDEP Water Permit Approvals to the City. Notes: • City Commission site acceptance (in the form of a consent agenda item at a regularly scheduled City Commission meeting) is reiluired before a certificate of occupancy can be issued for any buildings • Agenda items for City Commission meetings must be prepared approximately two weeks prior to the meeting date. • If there are any questions,please call Rachel Gironella at 407-327-5973 or email RGironella(a�WinterSprin sg FL.org • Additional items to be completed prior to closeout (this is not a complete punch list): 1. Final lift of asphalt 2. Final striping 3. Complete signage installation 4. Complete street lighting installation 2021/06/04—Exhibit A Page 1 of 1 2