Loading...
HomeMy WebLinkAbout2021 05 10 Consent 301 - Wendy's (WS Town Center) Site Acceptance .44 Prt. • CONSENT AGENDA ITEM 301 CITY COMMISSION AGENDA I MAY 10, 2021 REGULAR MEETING 1959 00 WE TITLE Wendy's (WS Town Center) Site Acceptance SUMMARY This commercial project is within the Winter Springs Town Center District, located at 1218 E SR 434 Winter Springs, FL 32708, Parcel ID# 06-21-31-507- 0000-0020, north side of E SR 434 and east of Tuskawilla Rd. on —0.59 acres of land consisting of the construction of a 2,183 SF two-story (faux 2nd floor) fast food restaurant building with a drive-thru lane and service window. The proposed development will include twenty-four (24) parking spaces, one access driveway connection on Sea Hawk Cove from Michael Blake Blvd. and Eagle Edge Ln., stormwater is master planned into The Blake Apts retention pond, utilities infrastructure w/water & sewer facilities, perimeter landscaping, irrigation, etc. This agenda item is for the conditional acceptance of the site improvements. The site work has been constructed in substantial compliance with the Final Engineering Plans approved by the City Commission, except as noted on the attached punch-list, Exhibit A. RECOMMENDATION Staff recommends the City Commission validate the Staff recommendation finding the site work to be built in substantial accordance with the Final Engineering plans, subject to satisfactory completion of the remaining open punch-list item(s) and subject to the following condition; Developer shall provide and grant to the City a utility easement to supersede the existing 15' square utility easement shown on the northeast corner of the property on the Winter Springs Apartments Replat, Seminole County Plat Book 82, Page 63, and also in the WSTC Ocean Bleu Replat, Seminole County Plat Book 84, Page 37. The new utility easement shall be approximately 35' by 15' along the Sea Hawk Cove property line and shall be in a form acceptable to the City Attorney. The Developer shall be responsible for supplying the 1 sketch and legal description of the easement area. The condition shall be completed before a CO is issued. In addition, the date of final acceptance for the bonds shall not be filled out until this condition is met. 2 CITY OF WINTER SPRINGS COMMUNITY DEVELOPMENT DEPARTMENT 1126 East State Road 434 Winter Springs,Florida 32708 customerservice(a�wintersprinesg fl.org 1959 Project Closeout List for City Commission Final Site Acceptance PROJECT: Wendy's No. 12660— 1218 E SR 434 1. Complete all site work and pass the final engineering inspection. Contact Rachel Gironella at 407-327- 5973 or email En ine�erinizkWinterSprin s_s_ F�L.org to schedule a preliminary and/or final engineering inspection. The final inspection will occur after receipt of the record drawings from the engineer-of- record. • Construction Site Walk-through completed on April 29, 2021 2. Submit a Bill of Sale for all infrastructure being turned over to the City for ownership and maintenance (streets, utilities, sidewalks, etc.). Use the City's standard Bill of Sale form. Submit final document to the Finance Department. This includes the cost sheet. 3. Submit 2-Year Maintenance Bond, Letter of Credit, or Cash Escrow Deposit(10% of the value of the improvements to be owned and maintained by the City, as listed on the Bill of Sale)to the Finance Department. 4. Obtain Approvals from all City Departments and Seminole County Fire Department. 5. Submit FDOT Permit Certification and provide City copy of FDOT approval. 6. Submit a copy of the FDEP Water Permit Approvals to the City. Notes: • City Commission site acceptance (in the form of a consent agenda item at a regularly scheduled City Commission meeting) is required before a certificate of occupancy can be issued for any buildings • Agenda items for City Commission meetings must be prepared approximately two weeks prior to the meeting date. • If there are any questions,please call Rachel Gironella at 407-327-5973 or email En ineerin WinterSprin sg FL.org • Additional items to be completed prior to closeout(this is not a complete punch list): o Install stop sign and thermoplastic stop bar at Sea Hawk Cove exit. 2021/04/30 Page 1 of 1 3