HomeMy WebLinkAbout2022 06 13 Consent 302 - Winter Springs Marketplace Partial (WS Town Center) Site Acceptance (Phase II) • CONSENT AGENDA ITEM 302
n, CITY COMMISSION AGENDA I JUNE 13, 2022 REGULAR MEETING
1959
TITLE
Winter Springs Marketplace Partial (WS Town Center) Site Acceptance (Phase
II)
SUMMARY
The approved (February 22, 2021) project, the Winter Springs Marketplace is a
master planned commercial center, and includes five (5) buildings all of which
will consist of faux second stories. The commercial project includes a grocery
store, a fitness center, a dentist office, one (1) fast food restaurant, a
proposed bank, and a future commercial piece on the corner of S.R. 434.
The site is at partial site acceptance, Phase II, and will include multiple phases.
On February 21, 2022, the City Commission approved partial site acceptance
for Phase I which included the following buildings;
• Crunch Fitness I Retail
• Dollar Tree I Retail
• Dental Office I Medical Office
Phase II will include the following building;
. Aldi I Grocer, retail
The remaining site acceptance phase(s) will include the following buildings;
Chipotle with drive-through and the Fast Food Replacement Site. The Fast
Food Replacement site is now under a new application for a proposed Fifth
Third Bank.
The development provides full ingress and egress directly into the site from
S.R. 434, from Roberts Family Lane and from Tuskawilla Road. Access to the
site will be provided via three (3) driveways; one (1) full access driveway to the
west of the development on Roberts Family Lane (not to be used by
commercial delivery trucks), one (1) existing right-in/right-out driveway (RIRO)
to the north of the development on S.R. 434, and one (1) existing right-
in/right-out (RIRO) driveway to the east of the development on Tuskawilla
Road.
1
The project includes onsite retention ponds, utilities, infrastructure with water
& sewer facilities, perimeter landscaping, irrigation, etc. The second phase of
site acceptance only includes the Aldi. The remaining phases will include
Chipotle, and a proposed Fifth Third Bank, and a future commercial piece on
the corner of S.R. 434.
RECOMMENDATION
Staff recommends the City Commission affirm Staff's recommendation
finding the site work to be built in substantial accordance with the Final
Engineering plans, subject to satisfactory completion of the remaining open
punch-list item(s).
2
CITY OF WINTER SPRINGS
COMMUNITY DEVELOPMENT DEPARTMENT
1126 East State Road 434
Winter Springs,Florida 32708
«� customerserviceCciwintersprin sg Rorg
1959
Project Closeout List for City Commission Partial Final Site Acceptance (Phase II)
PROJECT: Winter Springs Marketplace— SW of the intersection between SR434 and Tuskawilla Road
I. Complete all site work and pass the final engineering inspection. Contact the Community Development
Department at customerservice ckwintersprin_sg fl.orRsubject line "Site Acceptance", your project name, to
schedule a preliminary and/or final engineering inspection. The final inspection will occur after receipt of
the record drawings from the engineer-of-record.
• Construction Site Walk-through completed on January 19, 2022.
2. Submit a Bill of Sale for all infrastructure being turned over to the City for ownership and maintenance
(streets, utilities, sidewalks, etc.). Use the City's standard Bill of Sale form. Submit final document to the
Finance Department. This includes the cost sheet.
3. Submit 2-Year Maintenance Bond, Letter of Credit, or Cash Escrow Deposit(10% of the value of the
improvements to be owned and maintained by the City, as listed on the Bill of Sale)to the Finance
Department.
4. Obtain Approvals from all City Departments and Seminole County Fire Department.
5. Submit FDOT Permit Certification and provide City copy of FDOT approval.
6. Submit a copy of the FDEP Water Permit Approvals to the City.
Notes:
• City Commission site acceptance (in the form of a consent agenda item at a regularly
scheduled City Commission meeting) is required before a certificate of occupancy can be
issued for any buildings
• Agenda items for City Commission meetings must be prepared approximately three weeks prior to
the meeting date.
• If there are any questions, please email customerservice(a�wintersprin sg fl.org subject line "Site
Acceptance", and you project name.
• Additional items to be completed prior to closeout (this is not a complete punch list):
I.Final Landscape Walkthrough and approval shall occur prior to Final Full Site Acceptance.
2.Complete internal decorative signage.
2022/06/13 Page 1 of 1
3