Loading...
HomeMy WebLinkAboutProjects Experience3-4 RFP No. 06-20 LR Winter Springs WTP No. 1 Suction Piping Replacement Project Experience Project: OC Y17-722 SWRF Sodium Hypochlorite Storage & Feed System Owner Contact: Terra Riffitt Phone Number: 407.947.9802 Contract NTP: July 10, 2017 Substantial Completion: December 31, 2018 Bid/Contract Value: $2,746,940.00 Final Contract Amount: $2,775,868.00 PCG Project Manager: John Graf PCG Superintendent: Clint Davis Construction of Sodium Hypochlorite Storage & Feed Systems for Orange County Utilities and located in Orlando, FL. North System- Installation of three (3) new 15,600 gallon single wall, vertical fiberglass rein- forced plastic storage tanks under new metal roofed structure, three (3) sinplex metering pump skids and one (1) triplex meting pump skid. South System—Installation of two (2) 9,900 gallon single wall vertical fiberglass reinforced plastic storage tank under new metal roofed structure with concrete containment system, two (2) duplex metering pump skinds. Both systems include dosing points to the chlorine contact chamber and ROF controllers. Project: Howard F Curren AWTP Junction Chamber No. 1 Rehab, Phase 2 Owner Contact: Jim Greiner Phone Number: 813.274.8456 Contract NTP: November 1, 2020 Substantial Completion: July 9, 2012 Bid/Contract Value: $1,207,380.00 Final Contract Amount: $1,642,367.00 PCG Project Manager: Tom Pearly PCG Superintendent: Randy West Project for City of Tampa and located in Tampa, FL. Restoration of 11,000 SF of concrete, removal of existing liner, concrete restoration, surface prepara- tion, install steel stop logs,. Installation of sluice gates and actuators, furnish and install four (4) ex- haust fans, install three (3) access openings and miscellaneous electrical work. A By-pass system was used to maintain plant during switch over. RFP No. 06-20 LR Winter Springs WTP No. 1 HSPS Suction Piping Replacement Project Experience Project: Orange County ERR Destination Parkway Force Main Repair Owner Contact: James Montalvo Phone Number: 407.506.2120 Contract NTP: March 22,2019 Substantial Completion: December 31, 2019 Bid/Contract Value: $1,500,000.00 Final Contract Amount: $1,146,827.00 PCG Project Manager: Wyatt Hazy PCG Superintendent: Maurice Brown This project was an emergency repair project for Orange County Utilities located in Orlando, FL. Replaced 1,200 LF of 36” PCCP force main with 36” PVC DR 21/25 force main. Installed 2 each 36” PCCP Line Stops with 1,200 LF of above ground by pass pipe using 24” HDPE. Modifications and repairs included removal of 1,200 LF of 36” PCCP FM and installation of new 36” PVC pipe, installation of two36” plug valves using cut in PCCP x DIP adapters, 36” DR21 PVC Pipe and 36” MJ Sleeves. Installation included 36” DR 21/25 PVC Pipe, 36” MJ Fittings, 36” Plug Valve, 36” Gate Valves. Tie in of existing 20’ force main including new buried 20” plug valves with transition to the newly installed 36” PVC force main. Pressure testing, restoration and turn key delivery. This work required a 2 hour overnight pump station shut down for installation of 20” valve on dis- charge header for future upgrade considerations. RFQ No. 06-20 LR Winter Springs WTP No. 1 HSPS Suction Piping Replacement Project Experience Project: Hexam Water Treatment Plant Improvements Owner Contact: Mark Morgan Phone Number: 352.754.4759 Contract NTP: February 1, 2010 Substantial Completion: January 31, 2011 Bid/Contract Value: $2,439,000.00 Final Contract Amount: $2,374,452.00 PCG Project Manager: Jack Lieder PCG Superintendent: Ben Torres This project was for Hernando County and located in Spring Hill, Florida. Construction included a new 2 MG water storage tank, high service pump station (75 HP Horizontal Split Case & 2-40 HP vertical Turbine, disinfection system and emergency generator facility at the site and installation of two new well pups and well pump houses.  RFQ No. 06-20 LR Winter Springs WTP No. 1 HSPS Suction Piping Replacement Project Experience Project: Y10-704 NWWRF Reclaimed Water Storage & Repump Facility Owner Contact: James Montalvo Phone Number: 407.506.2120 Contract NTP: April 1,2010 Substantial Completion: May 25,2011 Bid/Contract Value: $2,017,000,.00 Final Contract Amount: $2,054,687.00 PCG Project Manager: Ketan Patel PCG Superintendent: Ben Torres  This project was completed for Orange County Utilities and is located in Orlando, Florida.  This project consisted of the installation of new reclaimed water storage and pumping system, including new 2 MG ground storage tank, three vertical turbine distribution pumps (2-50HP-750gpm & 1-100 HP 1500 gpm), variable frequency drive units, electrical and control building, clearing, grading, stormwater swales, approximately 3,800 LF of 24’ reclaimed water main.