HomeMy WebLinkAbout_SAWCROSS_RFP #06-20 LR_REFERNCE PACKAGE_FINALNumeric PriorityAcvity IDAcvity NameOriginalDuraonStartFinishTotalFloatWinter Springs WTP R1.0Winter Springs WTP R1.0Winter Springs WTP R1.021406-Oct-2030-Jul-210PRECONSTRUCTION MILESTONESPRECONSTRUCTION MILESTONESPRECONSTRUCTION MILESTONES5606-Oct-2023-Dec-201581A1000RFP 06-20 LR Issued006-Oct-20*02A1010Bid Due006-Nov-20*03A1020No!ce of Intent to Award (NOIA)020-Nov-20*1814A1030No!ce of Award (NOA)018-Dec-20*1615A1050Contract Execu!on023-Dec-20*9CONSTRUCTION MILESTONESCONSTRUCTION MILESTONESCONSTRUCTION MILESTONES14905-Jan-2130-Jul-2101A1040Pre-Construc!on Mee!ng006-Jan-21*11A1180Limited NTP (LNTP)005-Jan-21*02A1060Full No!ce to Proceed (NTP)002-Apr-2103A1070Ground Storage Tank Comple!on021-May-21504A1080HSP Service Transi!on006-Jul-21185A1110Contractural SUBSTANTIAL COMPLETION006-Jul-21186A1140Contractural FINAL COMPLETION030-Jul-210CHANGE ORDERS/PROJECT DELAYSCHANGE ORDERS/PROJECT DELAYSCHANGE ORDERS/PROJECT DELAYS502-Apr-2108-Apr-21811A1090Reserved502-Apr-2108-Apr-21812A1100Reserved502-Apr-2108-Apr-21813A1120Reserved502-Apr-2108-Apr-21814A1130Reserved502-Apr-2108-Apr-2181SUBMITTALS - PREPARATIONSUBMITTALS - PREPARATIONSUBMITTALS - PREPARATION1505-Jan-2125-Jan-21771A124015112.2.01 Bu:erfly Valves305-Jan-2107-Jan-21232A140015120.2.05 Chemical Injector/Diffuser1005-Jan-2118-Jan-21273A126015121.2.02 Dismantling Joints305-Jan-2107-Jan-21254A127015211.2.01 Duc!le Iron Pipe305-Jan-2107-Jan-21255A141015211.2.01 Duc!le Iron FiAngs305-Jan-2107-Jan-2106A125017050 Flow Meter1505-Jan-2125-Jan-2177SUBMITTALS - REVIEWSUBMITTALS - REVIEWSUBMITTALS - REVIEW3208-Jan-2122-Feb-21771A129015112.2.01 Bu:erfly Valves2008-Jan-2104-Feb-21232A138015120.2.05 Chemical Injector/Diffuser2019-Jan-2115-Feb-21273A131015121.2.02 Dismantling Joints2008-Jan-2104-Feb-21254A132015211.2.01 Duc!le Iron Pipe2008-Jan-2104-Feb-21255A142015211.2.01 Duc!le Iron FiAngs2008-Jan-2104-Feb-2106A130017050 Flow Meter2026-Jan-2122-Feb-2177PRODUCTION/FABRICATIONSPRODUCTION/FABRICATIONSPRODUCTION/FABRICATIONS4005-Feb-2101-Apr-21591A134015112.2.01 Bu:erfly Valves2005-Feb-2104-Mar-21232A139015120.2.05 Chemical Injector/Diffuser2016-Feb-2115-Mar-21273A136015121.2.02 Dismantling Joints1505-Feb-2125-Feb-21254A137015211.2.01 Duc!le Iron Pipe1505-Feb-2125-Feb-21255A144015211.2.01 Duc!le Iron FiAngs4005-Feb-2101-Apr-2106A135017050 Flow Meter1023-Feb-2108-Mar-2177TEMPORARY FACILITIES & SITE EXPLORATIONTEMPORARY FACILITIES & SITE EXPLORATIONTEMPORARY FACILITIES & SITE EXPLORATION6106-Jan-2101-Apr-2111A1450Mobilize Jobsite Trailers/Erect Staging Area306-Jan-2111-Jan-2112A1550Exploratory Excava!on - Iden!fy/Confirm Exis!ng U!l!es/Verify Connec!on Point Across All Phases/Exercise Valves1811-Jan-2104-Feb-2113A1630Prep. for Phase I Construc!on1004-Feb-2118-Feb-2114A1840Prep. for Phase II Construc!on1018-Feb-2104-Mar-2115A1930Prep. for Phase III Construc!on1004-Mar-2118-Mar-2116A1940Prep. for Phase IV Construc!on1018-Mar-2101-Apr-211PHASE I CONSTRUCTION GST-2 PIPING CONNECTIVITYPHASE I CONSTRUCTION GST-2 PIPING CONNECTIVITYPHASE I CONSTRUCTION GST-2 PIPING CONNECTIVITY2202-Apr-2103-May-2101A1580Install Wellipoint System for Excava!on Area302-Apr-2106-Apr-2102A1590Assemble New Piping Above Ground807-Apr-2116-Apr-2102A1520Install Temporary Chemical Feed Lines at G-1 & GST-2507-Apr-2113-Apr-2111OctNovDecJanFebMarAprMayJunJulAugQtr 4Qtr 1Qtr 2Qtr 31230-Jul-21, Winter Springs WTP R1.023-Dec-20, PRECONSTRUCTION MILESTONESRFP 06-20 LR IssuedBid DueNo!ce of Intent to Award (NOIA)No!ce of Award (NOA)Contract Execu!on30-Jul-21, CONSTRUCTION MILESTONESPre-Construc!on Mee!ngLimited NTP (LNTP)Full No!ce to Proceed (NTP)Ground Storage Tank Comple!onHSP Service Transi!onContractural SUBSTANTIAL COMPLETIONContractural FINAL COMPLETION08-Apr-21, CHANGE ORDERS/PROJECT DELAYSReservedReservedReservedReserved25-Jan-21, SUBMITTALS - PREPARATION15112.2.01 Bu:erfly Valves15120.2.05 Chemical Injector/Diffuser15121.2.02 Dismantling Joints15211.2.01 Duc!le Iron Pipe15211.2.01 Duc!le Iron FiAngs17050 Flow Meter22-Feb-21, SUBMITTALS - REVIEW15112.2.01 Bu:erfly Valves15120.2.05 Chemical Injector/Diffuser15121.2.02 Dismantling Joints15211.2.01 Duc!le Iron Pipe15211.2.01 Duc!le Iron FiAngs17050 Flow Meter01-Apr-21, PRODUCTION/FABRICATIONS15112.2.01 Bu:erfly Valves15120.2.05 Chemical Injector/Diffuser15121.2.02 Dismantling Joints15211.2.01 Duc!le Iron Pipe15211.2.01 Duc!le Iron FiAngs17050 Flow Meter01-Apr-21, TEMPORARY FACILITIES & SITE EXPLORATIONMobilize Jobsite Trailers/Erect Staging AreaExploratory Excava!on - Iden!fy/Confirm Exis!ng U!l!es/Verify Connec!on Point Across All Phases/Exercise ValvesPrep. for Phase I Construc!onPrep. for Phase II Construc!onPrep. for Phase III Construc!onPrep. for Phase IV Construc!on03-May-21, PHASE I CONSTRUCTION GST-2 PIPING CONNECTIVITYInstall Wellipoint System for Excava!on AreaAssemble New Piping Above GroundInstall Temporary Chemical Feed Lines at G-1 & GST-2Winter Springs WTP R1.01 of 2Start Date: 06-Oct-20Project Finish Date: 30-Jul-21Date Date: 06-Oct-20Print Date: 05-Nov-20Remaining Level of EffortActual Level of EffortPrimary BaselineActual WorkRemaining WorkCritical Remaining WorkMilestoneSummaryProject Construction Schedule Date RevisionCheckedApproved Numeric PriorityAcvity IDAcvity NameOriginalDuraonStartFinishTotalFloat3A1600Excavate and Shore Line Stop Pit319-Apr-2121-Apr-2104A1610Form Pour Linestop Concrete Saddle322-Apr-2126-Apr-2105A1510Prep for Linestop227-Apr-2128-Apr-2105A1530Install Linestop Remove Exis!ng Piping/Install New Piping129-Apr-2129-Apr-2105A1620Tie-in Temporary Chemical Feed Lines at GST-1 & GST-2129-Apr-2129-Apr-2106A1540GST-2 Out of Service229-Apr-2130-Apr-2107A1560Remove Linestop130-Apr-2130-Apr-2109A1570Install Cap103-May-2103-May-21010A1460Phase I Complete003-May-210PHASE II CONSTRUCTIONPHASE II CONSTRUCTIONPHASE II CONSTRUCTION1504-May-2124-May-2101A1640Install Wellpoint Dewatering for Tank Interconnect Piping304-May-2106-May-2102A1650Assemble Pipe from GST-2 BFV to Exis!ng 14" WM507-May-2113-May-2103A1660Disinfect & Bac'T New Por!on of Line514-May-2120-May-2104A1670Shutdown GST-1 Replace/Install New Interconnect/14"WM121-May-2121-May-2105A1680GST-1 Out of Service121-May-2121-May-2106A1690Place GST-1 In-Service021-May-2107A1470Phase II Complete124-May-2124-May-210PHASE III CONSTRUCTIONPHASE III CONSTRUCTIONPHASE III CONSTRUCTION2225-May-2123-Jun-2101A1700Remove Chlorine Injec!on Vault by HSPS125-May-2125-May-2102A1710Demo Concrete Driveway/Install Site Access Measures226-May-2127-May-2103A1720Remove Exis!ng Fencing & Install Temporary Fence128-May-2128-May-2104A1730Dewater and Prep Trench for New Piping331-May-2102-Jun-2105A1740Install New 30" & 42" Suc!on Piping, FiAngs & Valves803-Jun-2114-Jun-2106A1750Install New Chlorine Injec!on Vault & Piping215-Jun-2116-Jun-2107A1760Construct 30" Above Grade Header at HSPS217-Jun-2118-Jun-2108A1770Pressure Test & Disinfect Newly Installed Line321-Jun-2123-Jun-2109A1480Phase III Complete023-Jun-210PHASE IV CONSTRUCTIONPHASE IV CONSTRUCTIONPHASE IV CONSTRUCTION924-Jun-2106-Jul-2102A1850Demo HSPS Walls224-Jun-2125-Jun-2103A1860Prep for HSP#2 & HSP #3 Tie-in228-Jun-2129-Jun-2104A1870Isolate HSP#2 & HSP#3 Tie-In New Pipe130-Jun-2130-Jun-2105A1880Place HSP#2 & HSP#3 Online030-Jun-2106A1890Remove Temporary Chlorine Injec!on Point at GST-2/Transfer to Permanent Vault101-Jul-2101-Jul-2107A1900Isolate HSP#1/Install New 18" Tie-In Piping102-Jul-2102-Jul-2107A1950Place HSP #1 Online002-Jul-2108A1910Cap and Place out of Service Exis!ng Mains105-Jul-2105-Jul-2109A1920Relocate Exis!ng Cl17 Chlorine Residual Meter106-Jul-2106-Jul-21010A1490Phase IV Complete006-Jul-210PHASE V CONSTRUCTIONPHASE V CONSTRUCTIONPHASE V CONSTRUCTION1007-Jul-2120-Jul-2101A1780Ini!al Clean-Up107-Jul-2107-Jul-2102A1790Rebuild HSPS Walls208-Jul-2109-Jul-2103A1800Repair Chain-Link Fence212-Jul-2113-Jul-2104A1810Repair Concrete Driveway/Seed & Mulch Grass Areas214-Jul-2115-Jul-2105A1820Paint HSPS Wall & Above-Grade Header116-Jul-2116-Jul-2106A1830Final Clean-Up219-Jul-2120-Jul-2107A1500Phase V Complete020-Jul-210PROJECT CLOSEOUTPROJECT CLOSEOUTPROJECT CLOSEOUT1806-Jul-2130-Jul-2101A1150Punchlist Walkthru w/ Owner & Engineer020-Jul-2102A1160Engineer to DraN Formal Punchlist & Deliver to Contractor121-Jul-2121-Jul-2103A1170Contractor to Execute Punchlist522-Jul-2128-Jul-2104A1190Demobilize229-Jul-2130-Jul-2105A1200Deliver Asbuilts to Engineer006-Jul-2118OctNovDecJanFebMarAprMayJunJulAugQtr 4Qtr 1Qtr 2Qtr 312Excavate and Shore Line Stop PitForm Pour Linestop Concrete SaddlePrep for LinestopInstall Linestop Remove Exis!ng Piping/Install New PipingTie-in Temporary Chemical Feed Lines at GST-1 & GST-2GST-2 Out of ServiceRemove LinestopInstall CapPhase I Complete24-May-21, PHASE II CONSTRUCTIONInstall Wellpoint Dewatering for Tank Interconnect PipingAssemble Pipe from GST-2 BFV to Exis!ng 14" WMDisinfect & Bac'T New Por!on of LineShutdown GST-1 Replace/Install New Interconnect/14"WMGST-1 Out of ServicePlace GST-1 In-ServicePhase II Complete23-Jun-21, PHASE III CONSTRUCTIONRemove Chlorine Injec!on Vault by HSPSDemo Concrete Driveway/Install Site Access MeasuresRemove Exis!ng Fencing & Install Temporary FenceDewater and Prep Trench for New PipingInstall New 30" & 42" Suc!on Piping, FiAngs & ValvesInstall New Chlorine Injec!on Vault & PipingConstruct 30" Above Grade Header at HSPSPressure Test & Disinfect Newly Installed LinePhase III Complete06-Jul-21, PHASE IV CONSTRUCTIONDemo HSPS WallsPrep for HSP#2 & HSP #3 Tie-inIsolate HSP#2 & HSP#3 Tie-In New PipePlace HSP#2 & HSP#3 OnlineRemove Temporary Chlorine Injec!on Point at GST-2/Transfer to Permanent VaultIsolate HSP#1/Install New 18" Tie-In PipingPlace HSP #1 OnlineCap and Place out of Service Exis!ng MainsRelocate Exis!ng Cl17 Chlorine Residual MeterPhase IV Complete20-Jul-21, PHASE V CONSTRUCTIONIni!al Clean-UpRebuild HSPS WallsRepair Chain-Link FenceRepair Concrete Driveway/Seed & Mulch Grass AreasPaint HSPS Wall & Above-Grade HeaderFinal Clean-UpPhase V Complete30-Jul-21, PROJECT CLOSEOUTPunchlist Walkthru w/ Owner & EngineerEngineer to DraN Formal Punchlist & Deliver to ContractorContractor to Execute PunchlistDemobilizeDeliver Asbuilts to EngineerWinter Springs WTP R1.02 of 2Start Date: 06-Oct-20Project Finish Date: 30-Jul-21Date Date: 06-Oct-20Print Date: 05-Nov-20Remaining Level of EffortActual Level of EffortPrimary BaselineActual WorkRemaining WorkCritical Remaining WorkMilestoneSummaryProject Construction Schedule Date RevisionCheckedApproved 10970 NEW BERLIN ROAD JACKSONVILLE, FL 32226-2270 904-751-7500 (VOICE) 904-751-0600 (FAX) WWW.SAWCROSS.COM (INTERNET) CONTRACTORS & ENGINEERS CGC 36203 CMC 56728 CUC 56787 UC 300564 EB8465 Winter Springs WTP No.1 HSPS Piping Replacement Sawcross inc. Project Approach OVERVIEW Contractual Substantial Completion = 90 calendar days Contractual Final Completion = 120 calendar days Liquidated Damages = $500/day Our success will be measured by the ability to work with residents and plant staff to accommodate nighttime shutdown work with minimal disruptions from noise and without plant down time. We have identified several project risks which include; 1) Underground utility conflicts 2) Existing water table and dewatering 3) Condition and exercise of existing valves 4) Lead time on special DI fittings and valves 5) Addressing the concerns of neighbors during nighttime connection tie-ins. We plan to address these concerns in several ways; 1) Use the lead time of the ductile iron fittings to focus attention on extension exploratory digging to help us identify; a. Existing piping connections b. Current water table and the need for additional dewatering measures 2) During the Temporary Facilities phase, our crews will work with plant staff to help identify and exercise shut off valves to ensure proper operation prior to critical shutdowns 3) We will utilize the long material lead time to perform extensive locates and site preparation. We recommend to extend the Full Notice to Proceed (NTP) until the valves and fittings have been delivered to the site. 4) We will attempt to address neighbors with advance notice of intended nighttime shutdown work. We have identified three critical dates at which nighttime activities will be needed. All other construction activities can be addressed during normal working hours. In addition, we will take extra measures to ensure minimal equipment is being used and materials are stagged in advance as to keep equipment movements at a minimum during the evening. PRE-CONSTRUCTION MILESTONES We expect city staff to issue a Notice of Intent to Award (NOIA) or Notice or Award (NOA) to the Contractor within the first 30 days after opening the bids. Either of these formal procurement letters will help the Contractor to start the purchasing process with our vendors which includes the procurement of the valves, ductile iron fittings, flow meter and chemical injection quill. We have 10970 NEW BERLIN ROAD JACKSONVILLE, FL 32226-2270 904-751-7500 (VOICE) 904-751-0600 (FAX) WWW.SAWCROSS.COM (INTERNET) CONTRACTORS & ENGINEERS CGC 36203 CMC 56728 CUC 56787 UC 300564 EB8465 reached out to our vendors and they have informed us several fittings which will have a lead time of 8 weeks once the order is placed. CONSTRUCTION MILESTONES We have identified eight construction milestones. 1) Notice of Award / Notice of Intent to Award (NOA/NOIA) 2) Pre-Construction Meeting (start milestone) 3) LIMITED Notice to Proceed (LNTP) (start milestone) 4) FULL Notice to Proceed (NTP) (start milestone) 5) Ground Storage Tank Completion (finish milestone) 6) HSP Service Transition (finish milestone) 7) Contractual Substantial Completion (finish milestone) 8) Contractual Final Completion (finish milestone) SUBMITTALS, PRODUCTION & FABRICATION Our schedule indicates a critical path that is controlled by the lead time on several key ductile iron fittings, specifically 14”, 20” and the 42”x 30” reducer. We propose using the lead time of the fittings to our advantage with a start on exploratory measures. TEMPORARY FACILITIES & SITE EXPLORATION Erect our temporary staging areas and start exploratory digging to locate existing underground utilities and identify utility conflicts and water tables at each of the five constructions phases. Accomplishing this work in advance of the NTP will enable our crews to quickly complete each construction phase. Crews will also work with plant operators to exercise all existing valves to ensure isolated connections can be made. Remove permanent fence and install temporary fencing to accommodate the new 42” WM. PHASE I CONSTRUCTION Crews will assess the potential for groundwater during the Temporary Facilities & Exploratory Digging phase. Crews will first start the installation of dewatering measures, if needed. After which crews will assemble the 20” & 14” piping above ground. Next, crews will start the installation of the temporary chemical line for staging near the 20” WM. The trench will then be excavated, and protective shoring measures installed. The concrete saddle will then be poured prior to the installation of the line stop. The line stop will be installed and crews will cut and remove the existing 14” WM, drop in and install the pre-assemble 20” & 14” piping, swab, disinfect, and connect the temporary chemical feed line and place GST-2 back into service. All of this will occur during a single shift. The shutdown will occur during low use periods at the plant which we will assume to be evening hours. All light towers will be aimed away from neighboring residents. Construction 10970 NEW BERLIN ROAD JACKSONVILLE, FL 32226-2270 904-751-7500 (VOICE) 904-751-0600 (FAX) WWW.SAWCROSS.COM (INTERNET) CONTRACTORS & ENGINEERS CGC 36203 CMC 56728 CUC 56787 UC 300564 EB8465 equipment movements will be as minimal as possible, and operators will be encouraged to avoid backup motions to reduced audible backups signals. PHASE II CONSTRUCTION Crews will start at the tie-in connection at the 20” tee for GST-2. Crews will stop short at the 45- degree fitting before the 14” WM (to be placed out of service). We will schedule a shutdown for GST-1 to occur during plant low flow operations, we will assume evening hours. Crews will cut, remove and cap the existing 14” WM. Lower into place a prefabricated and pressure tested section of pipe. Crews will then swab, disinfect, and place GST-1 back into service. The 20” BFV will be opened and GST-1 placed back online. PHASE III CONSTRUCTION Crews will begin work to extend the previously installed chemical feed line to the new chemical injection vault. Installation of the WM starting at the 30” BFV and working southeast towards the road crossing and HSPS above ground header. Steel road plates will be installed at the crossing to ensure access is always maintained to the plant. Crews will then Bac’T and pressure the line. PHASE IV CONSTRUCTION The pipe tie-in will be coordinated with plant staff during low-demand times, we assume to be at night. Crew will isolate flow from HSP#2 and HSP #3 leaving HSP #1 online. Once this has been achieved, crews will demo and remove suction lines to HSP #2 and HSP #3 and install the new suction pipe, swab and disinfect, and connect to the new 30” header and place HSP#2 and HSP#3 back online. The following day, crews will then shutdown HSP #1, remove the existing suction pipe and connect the new pipe to the suction header, swab, disinfect and place HSP #1 online. Relocate the existing CL meter and cap and remove the existing WM from service. PHASE V CONSTRUCTION Phase will involve the project restoration. Crews will spend the next 30 calendar days restoring the plant driveway, installation of the permanent fence, sod restoration, and demobilization. PROJECT CLOSEOUT During project closeout, the owner will be issued all copies of testing paperwork and final project record drawings while crews work to complete all punch list items. 10970 NEW BERLIN ROAD JACKSONVILLE, FL 32226-2270 904-751-7500 (VOICE) 904-751-0600 (FAX) WWW.SAWCROSS.COM (INTERNET) CONTRACTORS & ENGINEERS CGC 36203 CMC 56728 CUC 56787 UC 300564 EB8465 CLOSING SUMMARY Plant and neighborhood impacts are critical to this project. I hope we have demonstrated a plan that will address issues of importance to the City of Winter Springs and to Sawcross. We stand confident that our plan will bring success to all parties involved.