Loading...
HomeMy WebLinkAboutSoutheastern Surveying and Mapping Corporation GIS Map and Database Updates 2019 04 01Steven L. Anderson, Jr., PSM, PLS Digitizing Sheets Parcels Myron F Lucas, PSM Charles M. Arnett, PSM Wastewater Features Reclairined Features James E. Mazura,k, PSM Michael D. Brown, PSM 6 0 Thomas K. Mead, PSM, PLS Eric E. Cain, PSM 0 Timothy 0. Mosby, PSM John K, Carr, PSM b. Central Winds PUMP IIOUSC Reclaim By-pass 0 James L. Petersen, PSM Michael L. Dougherty, PSM 0 0 William C. Rowe, PSM James M. Dunn, 11, PSM c. Chesnut Street Storm Corrections 0 Tony G. Syfrett, PSM, PLS Thomas F. Ferguson, PSM 0 0 Thomas P. Young, Jr., PSM, LISP Ronnie A. Figueroa, PSM, GIS,P d. Durimar Estates 0 Kirk R. Hall, EL LISP Tate B. Fllowers, PSM, PLS 92 0 0 Brad A. Stroppel, EL LISP Robert W. Gardner, PSM 12 0 Brian E. Latchaw, GISP Brian R. Garvey, PE, LISP 66 0 Patrick J. Philfips, GISP Daniel J. Henry, PSM, PLS Southeastern Surveying and Mapping Corporation Donna L. Hendrix, CST IV Ryan E, Johnson, PSM Gary B. Krick, PSM Serving the Southeast Since 1972 Mark W. Klaers, CST IV David M. Rentfrow, CST IV Brad J. Lashley, PSM, PLS 100% Employee Own�ed Steve D. Snrl CST IV Land Surveying & Mapping Services - Sub -Surface Utility Designation & Location Services - Geographic Information Systems - GPS Asset Inventories January 1.8, 2019 VIA E -Mail: bsmithC&,winterspringsfl.org Bryant Smith III, P.E., CPM City Engineer City of Winter Springs 407-327-8979 (Office) 321-427-1228 (Cell) RE: Proposal for GIS Map and Database Updates - 2019 Dear Mr. Fields, As per your request, we are pleased to, submit our Proposal for updating the City's ISIS Database reflecting the changes requested by you on 11/29/2018. 1. Infrastructure GIS Database Update Digitizing Sheets Parcels Basemap Features Water Features Wastewater Features Reclairined Features Storrawater Features a, Central Winds Park Roadway lin2rovements sbuilt Survey 6 0 57 0 0 2 34 b. Central Winds PUMP IIOUSC Reclaim By-pass 0 0 0 0 0 3 0 c. Chesnut Street Storm Corrections 0 0 0 0 0 0 6 d. Durimar Estates 0 8 1 92 0 0 0 e. Integra 360 12 0 1013 177 66 0 173 f. Intersection 434,& Tuscora 0 0 0 0 5 0 0 g, Intersection 434 & Tuskawilla 6 0 57 0 0 0 32 h. Kim Court 0 0 0 9 7 0 2 i. Market Square 0 0 0 2 0 0 0 j. Nature Ct 1 0 0 0 0 0 0 2 k. Nursery Road Ph 111 0 7 15 8 7 0 15 1, Nursery Road Ph IV 0 2 30 27 8 0 10 1 m. Offices at Winding (Hollow 0 3 42 16 1 14 0 14 6500 All American Blvd 1130 Hipway'90 Orlando, FL 32810 Chipley, FL 32428 407.292.8580 850.638.0790 407.292.0141 Fax 850.638.8069 Fax Lakeside Executive Center 8641 Baypine Road Suite 5 Jacksonville, FL 32256 904.737 5990 904.737.5995 Fax 119 West Main Street 10 East Lake Street Tavares, FIL 32778 Kissimmee, FL 34744 3523414880 407.944.4880 352.343.4914 Fax 407.944.0424 Fax University Corporate Park 410 HoneysuckNe Read 110770 North 46th Street Dothan, AL 363,05 Suite C-300 334.648.0288 Tampa, FL 33617 813 898.2711 813.,898.2712 Fax icenses. PSM: Florida Professional Surveyor & Mapper - PLS: Alabarna Professional Land Surveyor - PE: Professional Engineer Certifications, El: Engineering Intern - GiSP: Geographic Information Systems Professional - CST. Certified Survey Technician Page 2 L Infrastructure GIS Database Update (continued Digitizing Sheets Parcels Basemap Features Water Features Wastewater Features Reclaimed Features, Stormwater Features n, PetS,uites 2 0 30 10 4 0 14 o. RaceTrac 5 0 35 8 6 0 22 p. Red Bug Self Storage 2 0 12 10 9 0 23 q. Scanned GIS Updates 0 0 0 11 0 0 0 r. Solary Canal STA 1 0 0 0 0 0 7 s. Southern Oaks Ph 2 11 0 106 140 33 0 184 t. The RiZE (Grandville) 11 0 130 18 4 0 113 u, Trotwood Park 2 0 74 0 0 0 19 v, Tuskawilla crossings 0 0 357 465 468 1 455 423 w. U-1-ined Piping 1 0 0 0 502 0 0 x, Vistawilla ALF 5 0 78 10 22 0 64 y. White Dove Storm Update I 1 0 0 0 1 0 0 25 2,. Subdivision Plat Parcels GIS Database Update D!gitizing Sheets Parcels BasernFeatures a. Catalyst 3 9 4 b. Enclave at Dunrnar 1 5 0 c. Foxmor Unit 2 0 3 0 d. Integra 3 30 0 e. Northern Oaks 0 58 1 0 f. Southern Oaks - Phase 3 0 120 0 g. Tuskawilla Crossings Phase 1 0 350 0 3. Annexation FLUM and Zoning GIS Database Update Digitizing Sheets Parcels a. Annexation Updates 0 4 b. Future Land Use Map (FLUM) Updates 0 17 c. Zonign Map Updates 0 13 DELIVERABLES: a. Updated ArcGIS Geodatabases containing the City's GIS Data delivered on CD, b. Updated PDF Copies of Citywide Maps C, Updated PDF Copies of plan sets of 24"06" Sheets for Water and Wastewater utilities infrastructure. Z-, Page 3 SCHEDULE - All mapsand data will be delivered within 110 business days after receipt of signed copy of this contract and a purchase order as a notice to, proceed,. PROFESSIONAL FEE: Our fee for the above referenced work will be Thirty Five Thousand Nine Hundred Sixty'Three Dollars and 58/100 (M,961,58) as shown in the hourly labor details attached as Exhibit "A". Payment is expected within thirty (30) days from date of invoice. We look forward to the opportunity to work with you on this project, Please feet free to call me if you have any questions about this proposal, Sincerely, Brian R. Garvey, P.E. CIS Division Manager Attachments: Exhibit "A" If the above scope, period of service and method of compensation meets with your approval, please execute below and fax to Southeastern Surveying and Mapping Corporation as notice to proceed along with the notice of commencement. If your firm prefers using its standard PROFESSIONAL SERVICES AGREEMENT lieu of this proposal letter, this document MUST BE furnished to Southeastern Surveying and Mapping Corporation, negotiated, and executed prior to the commencement of any service. ,Send all Agreements to: Orlando Corporate Office 65,010 All American Boulevard Orlando, FL 328110. F'ax: 407-2,92-0141 Email: info@soutfieasternsurveying.corri Your firm agrees that by (1) signing and returning this Proposal, or (2) partial or complete performance under this Proposal (such as but not limited to submitting a written Notice to Proceed), and SOUTHEASTERN SURVEYING AND MAPPING CORPORATION has not received, negotiated and/or executed a PROFESSIONAL, SERVICES, AGREEMENT, then it is agreed that THE TERMS AND CONDITIONS IN THIS PROPOSAL SHALL GOVERN THE SERVICES RENDERED. Furthermore, if requested, your firma acknowledges that by accepting this Proposal, SOUTHEASTERN SURVEYING AND MAPPING CORPORATION will provide your firm with an insurance certificate that (1) contains the project name and (2) lists your firm as the certificate holder, The person executing this document must indicate that he/she is a Principal and/or Corporate Officer. ou Page 4 If the signatory is not a Principal and/or Corporate Officer, a Letter of Authorization on company letterhead signed by a Principal and/or Corporate Officer, MUST be provided that specifically provides that signatory has the authority to bind the parties by entering into this agreement, ACCEPTED BY: J Principal or Corpq6te Officer Title Printed Name Date A i o Exhibit "A" Listing of Hourly Labor Details - GIS Base Utility Map Update - 2019 Winter Springs Base & Utility Map Update - 2019 01/18/19 SCOPE OF WORK Project Nlgr (6r) GISAnalyst- DB Admin (hr) GIS Tech (hr) GIS Analyst - QA/QC (hr), Total Fee I. Infrastructure GIS Database Update $185M Ia. Central Winds Park Roadway Improvements 'Asbuilt Survev 0.3 O.2 5.8 0,7 $646,40 b.Centi-al'A'indsPuiiiplioLiseReclaiiiiB)'-Iiass 0 0 11.1 0 $8.90 c. Chesnut Street Storm Corrections 0 0 0.3 $24.48 d. Dunmar Estates 0.3 0.2 4.8 0.6 $547,40 c. Integra 300 18 1.9 533 6.6 $5.968,90 f. Intersection 4334 & Tuscora 0.2 U $ 17,80 1 g, Intersection 434 & Tuskawil Ia h. Kim Court i. Market Square 0.1 0 t7 0.1 0 0 2.4 0,6 (1.1 0.3 17.1 11 $267.00 $63A0 $8.90 J. Nature (..t 0 0 0.1 0 $8.90 k. Nursery Road Ph 111 0.1 0.1 2,7 03 $293.70 1. Nursery Road Ph IV 0 1 C7,1 2.7 0.3 $293,70 in. Offices at Winding Hollow 0,2 C1.1 3.2 0.4 $,.361.617 m Petsuites 0.1 11.1 2.2 0.3 $249.20 o. RaccTrac 0.2 11.1 3.0 0A $343.80 p. Red Bug Sell' Storage 0,2 31.1 3.2 17.4 $361.60 q. Scanned GI S. t Jpdates 0.4 0 $35.60 r. Solar�y Canal STA t7 0 0.6 0.1 $63.40 s. Southern Oaks Ph 2 13 0,9 25,2 3.1 S2,81TOO tA'he RiZE (Grandville) 0.6 0.4 11.8 1.5 $1.320.60 Lt. 'Frotwood Park 0.1 OJ 16 0.3 $284.80 v. Tuskawi]Ia crossings 5 33 95�,3 11.7 $10.651.70 %v. U -1 -hied Piping 1.4 0.9 25.9 31 $2.902.70 x. Vistawilla ALF 0.4 0.3 7.5 0.9 $841.10 y, White Dove Storm t Ipdate 0.1 1 1.7 0.2 $194.70 2. Subdivision Plat Parcels GIS Database -Update a, Catalyst 0.1 0.1 1.6 02 $185M b. Enclave at DUnmar 0 0 0.3 07 $26.70 c, I'mmor Unit 2 0 0 0.4 1I $35.60 d, Integra 0 Southeastern Surveying & Mapping Corp. Page 1 of 2 ExhiNt "'A" Listing of Hourly Labor Details - GIS Base Utility Map Update - 20119 Winter Springs Base & Utiliq, Map Update - 2019 01/18/19 3. Annexation FLUNIT and Zoning GIS Database Update Project GIS Analyst - 0 GIS Analyst - 0,2 SCOPE OF WORK Mgr DB Admin GIS Tech (hr) QA/QC (hr) Total Fee c. Zoning N4ap I 7pdates (hr) (hr) 0,2 0 $17,80 . . . . ....... ......... . . . c. Northern Oaks 03 0.2 5.7 0.7 $637.50 1'. Southern Oaks - Phase 3 0.7 0.4 12.6 1.5 $1.405.20 'rossings Phase 1 1..9 1.3 36.3 4.3 $4,065-30 3. Annexation FLUNIT and Zoning GIS Database Update a. Printing and Assembly 0A 0.3 a. Annexation Updates 0 0 0,2 0 $17.80 b. Future Land Use Map (FLUM) T,Jpdates 0 0 0,2 0 $17.80 c. Zoning N4ap I 7pdates 0 0 0,2 0 $17,80 . . . . ....... ......... . . . 4. Package Deliverable a. Printing and Assembly 0A 0.3 8.0 1.0 $895.60 Project Subtotal (hr) 16.7 113 322.0 39.4 Labor Rate ($/br)., $134 $too $89 $100 Project Total (S) $2,238 $1,130 $28,656 $3,940 Southeastern Surveying & (Mapping Corp. Page 2 of 2