Loading...
HomeMy WebLinkAbout2019 03 11 Consent 301 City Hall Parking Lot ResurfacingCOMMISSION AGENDA ITEM 301 REQUEST: Informational Consent X Public Hearings Regular March 11, 2019 KS LR Regular Meeting City Manager Department Public Works Department requests the City Commission authorize a change order in the amount of $3,241.90 to The Middlesex Corporation for the additional overages incurred due to unforeseen pavement conditions during resurfacing of the City Hall parking lot. SYNOPSIS: This item provides an amendment ($3,241.90) to the current purchase order to The Middlesex Corporation for the milling and resurfacing of the entire City Hall parking lot. CONSIDERATIONS: At the October 08, 2018 City Commission meeting, the City Commission authorized the issuance of a purchase order to The Middlesex Corporation for the asphalt resurfacing of the City Hall parking lot in the amount of $87,235.00, plus a 10% contingency (see Exhibit A). Due to unforeseen and less than adequate pavement base conditions, additional work and materials were required. The work included the proper stabilization and leveling of various locations around the parking lot and new kiosk area. The additional work was necessary to provide an acceptable finished product with no determent to the standard useful life of asphalt pavement. The additional work and materials exceeded the previous total authorization of $95,958.50 by $3,241.90 (4% over the original contingency), for a total project cost of $99,200.40 (see Exhibit B). FISCAL IMPACT: Consent 301 PAGE 1 OF 2 - March 11, 2019 The requested funds for an additional 4% contingency is $3,241.90, for a total authorization of $99,200.40, funded by the Infrastructure Surtax Fund (3rd Generation Sales Tax). COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends that the City Commission authorize a change order in the amount of $3,241.90 to The Middlesex Corporation for the additional overages incurred due to unforeseen pavement conditions during resurfacing of the City Hall parking lot. This amount will be funded by the Infrastructure Surtax Fund (3rd Generation Sales Tax). ATTACHMENTS: Exhibit A - October 8, 2018 Consent Agenda Item 301 Exhibit B - The Middlesex Corporation Final Payment Application Consent 301 PAGE 2 OF 2 - March 11, 2019 COMMISSION AGENDA ITEM 301 REQUEST: Exhibit A Informational Consent X Public Hearings Regular October 08, 2018 KS BF Regular Meeting City Manager Department The Community Development Department requesting the City Commission's authorization to issue a purchase order to The Middlesex Corporation for the asphalt resurfacing of the City Hall parking lot in the amount of $87,235.00 plus a 10% contingency, piggybacking off Seminole County Contract #IFB-602096-14BJC. SYNOPSIS: This item provides for the milling and resurfacing of the entire City Hall parking lot. CONSIDERATIONS: . The City Hall parking lot was recently evaluated for signs of pavement deterioration, age, and drainage. Based on Staff s evaluation of the parking lot, along with the additional construction work around City Hall that have recently damaged the asphalt, Staff recommends resurfacing of the asphalt parking lot. The asphalt resurfacing project will include milling and resurfacing of the paved parking areas and installation of a new asphalt drive-thru lane for the utility payment kiosk, which is currently under construction. The City Hall main entrance driveway from SR 434 will be resurfaced during the upcoming construction of the SR 434 westbound turn lane at City Hall. Striping will be completed under a separate purchase order. Work is expected to take place in late October. The work will be performed in phases such that areas of the City Hall parking lot will remain open at all times for customer and employee parking. Consent 301 PAGE 1 OF 2 - October 08, 2018 FISCAL IMPACT: The project cost is $87,235.00 plus a 10% contingency, for a total authorization of $95,958.50, funded by the Infrastructure Surtax Fund (3rd Generation Sales Tax). COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends that the City Commission authorize the issuance of a purchase order to The Middlesex Corporation for the asphalt resurfacing of the City Hall parking lot in the amount of $87,235.00 plus a 10% contingency, piggybacking off Seminole County Contract #IFB-602096-14BJC, funded by the Infrastructure Surtax Fund. ATTACHMENTS: Exhibit A - Middlesex Bid Form (1 page) Consent 301 PAGE 2 OF 2 - October 08, 2018 Exhibit A ASPHALT RESURFACING OF CITY HALL PARKING LOT PRICING FORM ITEM NUMBER DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL 1 MOBILIZATION LS 1 Pig', J�Uc� X1� /(p Jra OO /U 2 3 MAINTENANCE OF TRAFFIC EROSION PROTECTION LS 1 'CSC; 0 F? U . a� LS 1 J 005 300, O p 4 MILLING OF EXISTING ASPHALT (V AVG DEPTH) SY 5,900 1.55 '/'/'/S.00 5 SUPERPAVE ASPHALTIC CONCRETE SP -9.5 (TRAFFIC C) TN 345 6 CITY HALL KIOSK AREA 1 2 OtJJ Z f` o?u O U TOTAL PRICE (SUM OF ITEMS #1 THROUGH #7): PAY ITEM NOTES: 2 Includes the cost of a II items needed for traffic control, (barricades, flagmen, temporary variable message signs, etc.) in accordance with FDOT standards 4 Quantity based on lie, lbs per square yard per 1 -inch lift Unit price includes all equipment, labor, and materials including bituminous material (plant mixes, prime coats, and tack coats) and all other Incidental costs to complete the work. 5 6 The lump sum item for the City Hall Kiosk Area includes all preparation Eosts for the installation of anew vehicle drive thru area. The estimated square yardage for this area is 151 SY. The lump sum item includes mobilization, maintenance of traffic, re -grading, compartion, and rolling of the new asphalt millings plus any miscellaneous work needed for a complete installation, restoration, and cleanup. The asphalt quantity of this lump sum item is included within Bid Item #6. Progress Bill I Exhibit B From: The Middlesex Corporation Invoice: 48327-04 One Spectacle Pond Road Unit Price Littleton, MA 01460 Date: 02/07/19 Quantity This Period Application #: 0 To: City of Winter Springs Customer Reference: 1126 East S.R. 434 City Hall Pkg Lot -Mobilization Winter Springs, FL 32706 Invoice Due Date: 03/09/19 16,500.00000 Payment Terms: Net 30 days Contract: 48327. City of Winter Springs 2017-2018 Paving Performed 214, 215, 2/7 City Hall Item Description Contract Quantity U/M Unit Price Contract Amount Quantity Previous Quantity This Period Quantity Amount JTD Previous Amount This Period Amount JTD 16 City Hall Pkg Lot -Mobilization 1.000 LS$ 16,500.00000 16,500.00 0.00 1.000 1.000 0.00 16,500.00 16,500.00 17 City Hall Pkg Lot -MOT 1.000 LS$ 8,000.00000 8.000.00 0.00 1.000 1.000 0.00 8,00.00 8,000.00 18 City Hall Pkg Lot- Erosion Pro 1.000 LS$ 300.0000 300.00 0.00 0.00 0.000 0.00 0.0 0.00 19 City Hall Pkg Lot -Milling of E 5,900.00 SY 1.55000 9,145.00 0.00 6,248.000 6,248.000 0.00 9,684.40 9,684A0 20 City Hall Pkg Lot-Superpave As 345.00 TN 82.00000 28,290.00 0.00 372.00 372.000 0.00 30,504.00 30,504.00 21 City Hall Pkg Lot -Kiosk Area 1.00 LS$ 25,00.00000 25,000.00 0.00 1.000 1.000 0.00 25,00.00 25,000.00 22 City Hall Pkg Lot -Leveling 116.000 TN 82.000 9;512.00 0.00 116.00 116.00 0.00 9,512.0 9,512.00 Total for Items 0.00 99,200.40 99,200A0 Total Billed To Date: 99,200.40 Less Retainage: 0.00 Less Previous Applications: 0.00 Total Due This Invoice: 99,20.40