HomeMy WebLinkAbout2018 11 19 Consent 301 Tuskawilla Crossings - Phase 1 Site AcceptanceCOMMISSION AGENDA
ITEM 301
November 19, 2018
Regular Meeting
REQUEST:
Informational
Consent
X
Public Hearings
Regular
KS
City Manager
Department
The Community Development Department requesting the City Commission validate the
Staff recommendation finding the sitework for the Phase 1 portion of Tuskawilla
Crossings to be built in substantial accordance with the Final Engineering plans, subject to
the enclosed punchlist.
SYNOPSIS:
Sitework for the Phase 1 portion of Tuskawilla Crossings project is substantially complete
and has been conditionally approved by the applicable City Departments. This agenda item
provides the site acceptance necessary before a certificate of occupancy can be issued by the
Building Official.
CONSIDERATIONS:
APPLICABLE CODE:
Section 9-178. Required Improvements to be completed prior to building on lots;
exceptions.
(c) Where the building official has an authoritative method of assurance that the
improvements will be completed in accordance with approved plans, such as
withholding occupancy, the building official may issue building permits upon
advising the developer that all or partial occupancy will be restricted until satisfactory
completion of the improvements has be accomplished.
(d) ... Certificates of occupancy will not be issued until all improvements are
accepted by the city commission.
Consent 301 PAGE 1 OF 2 - November 19, 2018
SUMMARY:
The Tuskawilla Crossings project consists of a 379 -unit single family residential
subdivision by Lennar Homes. The project is located southeast of SR 434 and Tuskawilla
Road. The project area is approximately 133 acres and includes a central amenity area and
a commercial outparcel. The final engineering plans were approved by the City
Commission at the April 24, 2017 City Commission meeting. The Developer's Agreement
was approved on April 24, 2017, and the First Modification of Developer's Agreement
was approved on August 13, 2018. Sitework began April 28, 2017.
This agenda item is for the conditional acceptance of the Phase 1 (Exhibit B) site
improvements. The sitework has been constructed in substantial compliance with the
Final Engineering plans approved by the City Commission, except as noted on the
attached punchlist, Exhibit A. All items on the punchlist must be complete, subject to
staff approval, prior to issuance of the certificate of occupancy.
FISCAL IMPACT:
There is no fiscal impact associated with this agenda item.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas/Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at six
(6) different locations around the City. Furthermore, this information is also available to any
individual requestors. City Staff is always willing to discuss this Agenda Item or any
Agenda Item with any interested individuals.
RECOMMENDATION:
Staff recommends that the City Commission validate the Staff recommendation finding the
Phase 1 portion of the Tuskawilla Crossings sitework to be built in substantial accordance
with the Final Engineering plans, subject to satisfactory completion of the remaining open
punchlist items.
ATTACHMENTS:
1. Exhibit A - Site Acceptance Punchlist (2 pages)
2. Exhibit B - Phasing Plan (1 page)
Consent 301 PAGE 2 OF 2 - November 19, 2018
Exhibit A
City of Winter Springs
Project Closeout List for City Commission Final Site Approval
Tuskawilla Crossings — Phase 1
1. Complete all sitework and pass the final engineering inspection. Contact Bryant Smith,
P.E. at 407-327-8979 to schedule a preliminary and/or final engineering inspection. The
final inspection will occur after receipt of the record drawings from the engineer -of -
record.
2. Submit a Bill of Sale for all infrastructure being turned over to the City for ownership
and maintenance (streets, utilities, sidewalks, etc.). Use the City's standard Bill of Sale
form.
3. Submit 2 -Year Maintenance Bond, Letter of Credit, or Cash Escrow Deposit (10% of the
value of the improvements to be owned and maintained by the City, as listed on the Bill
of Sale)
4. Obtain Approvals from all City Departments and Seminole County Fire Department
5. Submit FDOT Permit Certification and provide City copy of FDOT approval
6. Submit a copy of the FDEP Wastewater Permit Approvals to the City.
Notes:
• City Commission site acceptance (in the form of a consent agenda item at a
regularly scheduled City Commission meeting) is required before a certificate
of occupancy can be issued for any buildings
• Agenda items for City Commission meetings must be prepared approximately
two weeks prior to the meeting date.
• If there are any questions, please call Bryant Smith, P.E. at 407-327-8979
Additional items to be completed prior to closeout (this is not a complete punchlist):
• Final lift of asphalt
• Final striping
• Complete signage installation
• Complete stormwater pond grading
• Complete lift station and enclosure
• Complete street lighting installation
• Site cleanup
• Repair damaged curb and sidewalks
aLaao�Ec�oaAwiNcs\cn�—oo�—�„�wawma co�s„y\ss o,awi„e�\ss=��n\iow���\os ri„ai E�ei„een„g\Prvo���y aio�—m�,ou�eeameo-v.a.z a a,�/e�/zo» e
A �
----; ---
� 'I
i
s�y
z
� € a
/
LF
ertF
S
(D
3
7� rt
O --1O 0 0 � O W
Iv Iv Iv
' ® / O O O O
7Al C ZF'I
Z
CA
p. (-n
/1a O 00 O m CD
�< Q
O (A a 00 D
O 00 6T 6T O UP
FIT
O N
O
00
nm
19 TD -F- LT1 w O
<�
D
>o m D D D
m D fn cn cn
In m m m
2m wy w N) j
w D i
- xa
m
x
OVERALL PHASING PLAN
-`` ' " = 150' C COFFEIAPPIAN ENGINEERING, LLC
FINAL SUBDIVISION PLAN
j1E� p fit = — PROEM, z;°<
CAL-001 2221 LEE ROAD, SUITE 17 _
v ,[ �cLAsmN TUSKAWILLA CROSSINGS
= s�cE. WINTER PARK, FLORIDA 32789
*' CITY OF WINTER SPRINGS, FLORIDA
j C8.O v2472o» (407) 960-5e68