HomeMy WebLinkAbout2018 08 13 Consent 301 SSNOCWTA Appointment
COMMISSION AGENDA
Informational
Consent
ITEM301
>
Public Hearings
Regular
August 13, 2018KSLR
Regular MeetingCity ManagerDepartment
REQUEST:
The City Manager requests the Commission appoint Mayor Lacey to the South
Seminole and North Orange County Wastewater Transmission Authority (SSNOCWTA) to
fill the current vacancy for the City of Winter Springs representative, as required by
Legislative Act 78617 (Senate Bill 1341).
>
SYNOPSIS:
There is currently a vacancy for a City of Winter Springs representative on the governing
board of the South Seminole and North Orange County Wastewater Transmission Authority
(SSNOCWTA). The vacancy is required to be filled by the City pursuant to the
requirements of Legislative Act 78617 (Senate Bill 1341), which created SSNOCWTA in
>
1978.
CONSIDERATIONS:
SOUTH SEMINOLE AND NORTH ORANGE COUNTY WASTEWATER
TRANSMISSION AUTHORITY (SSNOCWTA):
From their website:
"The South Seminole and North Orange County Wastewater Transmission Authority
(SSNOCWTA) was created by an Act of Florida Legislature in 1978 as a separate local
agency of the government with powers designed to meet the particular needs of the area
in relationship to transmission of wastewater to a regional sewage treatment plant (Iron
Bridge Treatment Facility).
Consent 301 PAGE OF August 13, 2018
13-
The Authority, an Independent Special District, encompasses a service area of
approximately 68 square miles. It owns and operates an untreated wastewater
transmission system located in portions of Seminole County, Orange County, and the
Cities of Casselberry, Winter Park, and Maitland. The Authority provides such service
to Seminole County, the Cities of Maitland, Casselberry, and Winter Park, and can
provide transmission service to the City of Winter Springs.
The facilities owned by the Authority within the service area consist of 32 metering
points, 19 pump stations, and approximately 32 miles of transmission force mains
ranging in size from 8inch to 36inch diameters. The Authority also owns a section of
>>
42inch and 48inch diameter gravity sewer lines and discharges into the City of
>>
Orlandos 84inch diameter gravity sewer for the final leg of transmission and ultimately
>>
treatment at the City of Orlandos Iron Bridge Treatment Facility. The Authoritys
>>
present committed flow through the system is 13.203 million gallons per day (MGD).
The Cities of Maitland, Casselberry, Winter Park, Winter Springs, and Seminole County
are entitled to representation on the governing board. Each governmental entity appoints
one member and one alternate member. The alternate member is authorized by each
respective entity to act in all matters for the member during absence of the member at
any duly authorized board meeting. The term of office is four alternating years
terminating in successive years on September 30."
The South Seminole and North Orange County Wastewater Transmission Authority
holds Regular Meetings on the fourth Thursday of every other month at 9:00 a.m.. Most
meetings are held at the South Seminole and North Orange County Wastewater
Transmission Authority's Board Office 410 Lake Howell Road, Maitland, Florida.
>
The following is the remaining schedule of meetings for 2018:
September 27, 2018
November 15, 2018
FISCAL IMPACT:
There is no noted Fiscal Impact related to this Appointment.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney/Staff, and is available on the Citys Website, LaserFiche, and
>
the Citys Server. Additionally, portions of this Agenda Item are typed verbatim on the
>
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the Citys Website, LaserFiche, and the Citys
>>
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas/Agenda Item information, Homeowners Associations/Representatives
>
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at six (6) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
Consent 301 PAGE OF August 13, 2018
23-
RECOMMENDATION:
Staff recommends that the Commission appoint Mayor Charles Lacey as the City of Winter
Springs representative to the governing board of the South Seminole and North Orange
County Wastewater Transmission Authority (SSNOCWTA) in accordance with Legislative
Act 78617.
>
ATTACHMENTS:
None
Consent 301 PAGE OF August 13, 2018
33-