HomeMy WebLinkAbout2018 07 09 Consent 309 Playground Equipment PurchaseCOMMISSION AGENDA
ITEM 309
REQUEST:
Informational
Consent
X
Public Hearings
Regular
July 09, 2018 SB CC
Regular Meeting City Manager Department
The Parks and Recreation Department requests Commission authorize to enter into a
contractual agreement with REP Services, Inc. for purchase of playground equipment for
Winding Hollow Park in the amount of $89,100.26, plus a 10% contingency, piggybacking
off of Clay County Board of County Commissioners RFP 413/14-8.
SYNOPSIS:
The Winding Hollow Park playground is part of our systematic playground equipment
replacement/expansion process. The plan includes to replace the park's playground with
new playground equipment, for ages 2-5yrs. & 5-12yrs., additional containment borders,
surfacing and ADA accessibility walkways. Police Department has verified location and
reviewed all SEPTA guidelines for safety and given good recommendations for lighting and
vehicular safety. These items will be completed with the playground installation. Work is
scheduled to begin in August 2018.
CONSIDERATIONS:
. Winding Hollow playground equipment has reached its useful life expectancy.
. New footprint for playground has larger capacity to include unique play features as
well as traditional elements such as swings & slides.
. Risk Management and Parks & Recreation have recommended replacement
of Winding Hollow Park playground.
. WS Police has provided SEPTA review of playground area for safety of both 2-5 yr
old and 5-12 yr old playgrounds.
. Replacement/expansion will include new equipment, additional containment borders,
certified playground surfacing and ADA accessible walkways.
Consent 309 PAGE 1 OF 2 - July 09, 2018
New parts on old equipment are not covered by any manufacturer's warranty,
therefore, replacement is best option.
Pictures of proposed Winding Hollow playground equipment are attached (Exhibit
A).
After Winding Hollow Park is completed, our prioritized replacement schedule for all
parks playground equipment will be continued until all playgrounds are completed.
FISCAL IMPACT:
Project cost is $89,100.26, plus a 10% contingency, which will be funded from the Park
Impact Fee Fund and the General Fund.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas/Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at five (5) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff recommends the City Commission authorize to enter into a contractual agreement with
REP Services Inc. for purchase of playground equipment for Winding Hollow Park in the
amount of $89,100.26 plus a 10% contingency, and authorize the City Manager and City
Attorney to prepare and execute any and all applicable documents.
ATTACHMENTS:
A. Pictures of Proposed Winding HollowPark Pla round Equipment
Consent 309 PAGE 2 OF 2 - July 09, 2018
�
Page i of 3
REP SERVICES, INC.
Please mail POs, contracts and checks to:
Experts at Play & Outdoor Spaces
step Services, Inc.
Site Anietsibes ■ Playgmand iquipmrnf ■ Safety Surfacing a Shade
581 Technology Park, STE 1009
of ,„,74078V 96SB r.,.: 6&6.232 8532 f -0.
Lake Mary, FL 32746-7127
Proposed City of Winter Springs
Ship TBD at a later date
Bill City of Winter Springs
To: Parks and Recreation
To:
To: Parks and Recreation
1000 Central Winds Drive
1 EA
1000 Central Winds Drive
Winter Springs, FL 32708-2799
-2.0%
Winter Springs, FL 32708-2799
Attn: Chris Caldwell
n:
Attn: Chris Caldwell
Project No: 11871 Project Name: City of Winter Springs Winding Hollow P Project Contact: Chris Caldwell
Proposal No: 11871.03 Proposal Name: Winding Hollow Park Project
Location: 305 Winding Hollow Blvd
Proposal Expires: 7/25/2018
Winter Springs, FL 32708
Proposal Date: 6/25/2018
Play Area 2-5
For Questions Contact: Jacqui Rohrborn W 407-915-7860 ® jacqui@repservices.corn
Sales Consultant: Mary Langley 9 407-947-6318 ® mary@repservices.com
Opt/Rev: A/1 Printed: 6126/2018 -NA
Vendor: Landscape Structures
Proj Drawings: 11817-1-3
564054
Class
Part No
Qty
Description
i
Unit Price
Disc
Net Price
Ext Price
Miscellaneous
TY
1 EA
THANK YOU FOR THE OPPORTUNITY TO PRESENT
0.00
-2.0%
0.00
0.00
_
LSI PRODUCTS
Play Area 2-5
_
Ages 2-5 Yrs
SP197057A-001
1 EA
Motion w/Sand Table DB
13,253.00
-2.0%
12,987.94
12,987.94
Kids In Motion
IP152179A-002
1 EA
Saddle Spinner DB 12"Height
880.00
-2.0%
862.40
u883.96
862.40
IP1640748-001
1 EA
Single Bobble Rider DB
902.00
-2.0%
0.00
883.96
0.00
Signs IP182503A-001 1 EA Welcome Sign (LSI Provided)JAges 2-5 years Direct Bury 0.00 -2.0%
Surfacing
IP100626A-001
15 EA
30" Galvanized Stake
11.00
-2.0%
10.78
161.70
IP119214A-001
7 EA
Tuff -Timber 4'
39.00
-2.0%
38.221
267.54
IP130799A-001
1 EA
TuffTimbers Access Wedge
656.00
-2.09T/6
642.881
642.88
Play Area 2-5 Total:
$15,806.42
Play Area 5-12
Bridges &
PB120873B-010
1 EA
84"Disc Challengelw/Handhold Panels 24"Deck
2,257.00
-2.0%
2,211.86
2,211.86
Ramps
DifgAttached To 16"Dk DB
'Climbers
PB128608A-011
1 EA
Summit Climber1l Sides 72"Dk DB
1,038.00
-2.0%
1,017.24
1,017.24
P8152908C-001
1 EA
Deck Link w/HandrallsiPermalene infill panel 3 Steps
1,338.00
-2.0%
1,311.24
1,311.24
PB15335OC-003
1 EA
Chain Ladder 72"Dk DB
827.00
-2.0%
810.46
810.46
PB176079A-001
1 EA
Sunbeam Climber s
1,342.00
-2.0%
1,315.16
1,315.16
Decks
PB111228A-001
1 EA
Square Tenderdeck
770.00
-2.0%
754.60
754.60
PB1 1 1231A-001
1 EA
Triangular Tenderdeck
598.00
-2.0%
586.04
586.04
PB11964BA-001
1 EA
Tri -Deck Extension
576.00
-2.0%
564.48
564.48
PB152911B-004
1 EA
Curved Transfer ModulelLeft 40"Dk DB
2,081.00
-2.0%
2,039.38
2,039.38
Motion & More
PB111357A-001
1 EA
Chinning Bar Alum DB
405.00
-2.0%
396.90
396.90
Fun
_
PB120818A-001
1 EA
Playstructure Seat
290.00
-2.0%
284.20
284.20
PB120902A-001
1 EA
Handhold Leg Lift
158.00
-2.0%
154.84
154.84
Posts
PB111404A-001
4 EA
148"Alum Post DB
295.00
-2.0%
289.10
1,156.40
PB111404C-001
4 EA
132"Alum Post DB
124"Alum Post DB
277.00
264.00
-2.0%
-2.0%
-2.0%
271.46
258.72
729.12
1,085.84
258.72
729.12
PB 11 1404D-001 1 EA
PB154883A-002 1 EA
265"Steel Post For CoolToppers Single Post Roof DBI 744.00
72"Dk
_
Roofs
PB154884A-001
1 EA
CoolToppers Single Post DB Only
2,490.00
-2.0%
2,440.20
2,440.20
Signs
IP182503C-001
1 EA
Welcome Sign (LSI Provided)JAges 5-12 years Direct Bury
Double Swoosh SlideJ72"Dk DB
30" Galvanized Stake
Tuff -Timber 4'
Tuffrimbers Access Wedge
0.00
1,782.00
11.00
39.00
656.00
-2.0%
-2.0%
-2.0%
-2.0%
-2.0%
0.00
1,746.36
10.781
38.22
642.88
0.00
1,746.36
183.26
343.98
642.88
Slides & Gliders PB I 3039OA-003 1 EA
Surfacing IP100626A-001 17 EA
IP119214A-001 9 EA
IP130799A-001 1 EA
Swings
IP174018A-001
1 EA
Guard Chains for 8' Beam Height
97.00
-2.0%d
95.06
95.06
IP176038A-001
1 EA
IFull Bucket SeatlProGuard Chains for 8' Beam Height
229.00
-2.0%
224.42
224.42
Proposal No: 1 1 871,03 Project Name: City of Winter Springs Winding Hollow Park
IP177332A-001 1 EA Single Post Swing Frame18' Beam Height Only
Proposal Date: 612512018 Page 2 of 3
981.00 -2.0% 981.38961.38
Play Area 5-12 Total: $21,314.02
Discount per the Clay County Contract #13114-8: $757.56 Product Subtotal:
$37,120.44
4 Sets of Signed & Sealed Engineering:
$2,500.00
Freight: Prepaid Ship Method: Best Way FOB: Destination Weight: 3,934 lbs Freight Charge:
$4,420.00
Landscape Structures Total:
$44,040.44
Vendor: Irvine Wood Recovery
Proj Drawings: 11871-1-3
564056
ClassPart
No
Qty
Description
Unit Price Disc
Net Price
Ext Price
Surfacing
RSI-EWF-C
171 CY
Engineered Wood Fiber for Playground, per cubic yard
28.75-5A%
27.31
4,670.44
Discount per the Clay County Contract #13114-8: $245.81 Product Subtotal:
$4,670.44
Freight: Prepaid Ship Method: Best Way FOB: Destination Freight Charge:
$819.00
Irvine Wood Recovery Total:
$5,489.44
Vendor: RSI Installer
564057
Item
tatty
_
Description
Unit Price
Ext Price
PERMIT FILING
1 EA
Labor charge for Licensed Contractor to file for building permit from the appropriate
750.00
750.00
jurisdiction.
NOTE: Permit Fees charged by the jurisdiction will be prepaid and invoiced separately and
may require a change order to your Purchase Order or Contract.
TRASH REMOVAL
1 LT
Remove and haul off existing equipment
2,950.00
2,950.00
TRASH REMOVAL
222 SF
Remove and haul off sidewalk
2.94
652.68
TRASH REMOVAL
3,170 LT
Remove and haul off mulch
1.50
4,755.00
OTHER
71 SF
Remove and replace Borders
16.20
1,150.20
INS -LSI
1 LT
Equipment Installation - Landscape Structures
13,765.00
13,765.00
INS -CON SLAB
270 SF
Slab concrete, 4" thick
8.15
2,200.50
,OTHER
1 EA
Backfill front and halfway down sides of borders
1,200.00
1,200.00
MINS-IRV
171 CY
1 EA
Installation - Irvine Engineered Wood Fiber
Supply and install 8 palettes of Sod.
17.00
2,907.00
5,750.00
MOTHER
5,750.00
1 EA
Each Palette to cover 450sf
Estimated 4% +1- Permit fees will be charged by the Building Department for the building
3,490.00
PERMIT FEE
3,490.00
permit and by the Clerk of the Circuit Court for the Notice of Commencement will be prepaid.
Validated receipts will be provided once permits) are paid.
RSI Installer Total:
$39,570.38
General Terms of Sale and Proposal Summary
Net 30
Product: $44,290.88
Installation: ! $39,570.38
Freight: $5,239.00
Proposal Total: j $89,100.26
Notes
The Clay County Contract #13114-8 provides a 5% discount on Irvine product. The maximum price for installation is 99% of the product price. (installation cap
does not include site prep, slabs, footings or engineering).
The Clay County Contract #13114-8 provides a 2% discount on LSI product. The maximum price for installation is 45% of the product price. (Installation cap
does not include site prep, slabs, footings or engineering).
Basis of Proposal:
Our proposal is based upon our discussion
(This schedule starts when all needed information to direct engineering has been gathered.)
Estimated project completion schedule
4- Weeks: Engineering
4- Weeks+l- Permitting, finishes, etc.
4- Weeks Longest manufacturing lead time.
1 - Week Shipping
4- Weeks Installation of equipment'
IT- Weeks TOTAL WEEKS
Note that RSl is committed to do all it can to meet the needs of your project.
'The Installation schedule will be determined based on prepared site and installation crew availability.
RSI will respond in a timely fashion after receipt of Permit to proceed.
Scope of Proposal Includes:
9 Engineered Drawings
Proposal No: 11871.03 Project Name: City of Winter Springs Winding Hollow Park Proposal Date: 6125/2018 Page 3 of 3
• Permit Filing
• Permit Fees
• Play Equipment
• Surfacing
• Standard Colors/Materials
• Removal and Haul off
• Installation
To be provided by the customer, as applicable:
• Site Plan or Survey
• Soils testing
• Tree Survey
• Accessibility to site (for installers and equipment)
Please note the vendor requirements itemized below.
Landscape Structures:
When placing an order, please select colors from those shown on pages 236-238 of the catalog.
Protective surfacing material must have a critical height value to meet the maximum fall height for the equipment and be accessible (ref. ASTM F3101).
Irvine Wood Recovery:
Engineered Wood Fiber:
*** IPEMA CERTIFIED ASTM F1292-13 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment and
ASTM F2075 -10a Standard Specification for Engineered Wood Fiber for Use as a Playground Safety Surface Under and Around Playground Equipment.
Drainage is extremely important to the long term performance of your playground surfacing. A minimum of a 12" depth of surfacing material must be
maintained at all times.
"` This is a natural product. Particle size, texture and color may vary from a tan to a dark brown due to the natural conditions of the environment.
Freight prices are subject to an energy/fuel surcharge if implemented between the time of quote and placement of order.
RSI Installer:
Installation Does NOT Include:
• Site security to prevent theft or vandalism of equipment.
• Water and 110 Electric.
• Underground Utilities Located and Marked prior to installation.
• Storage.
• Does not include soil density or concrete testing
Installation Charges on this proposal are based on NO UNFORESEEN conditions in the area, above or below the surface. If unforeseen conditions arise, the
installation charges will change to reflect additional costs associated with dealing with those circumstances. Examples of this include, but are not limited to:
site not ready upon installer's arrival, underground utilities, or difficulties with footers due to coral rock or ground water in the holes.
The undersigned warrants that he/she is an authorized representative of the company noted and has the requisite authority to bind said company and/or
principal. If any particular billing is not paid when due, all outstanding balances, regardless of prior terms, will become immediately due and owing upon
demand. Interest on past due amounts will be assessed at 1 A % per month or the maximum interest rate permitted by applicable law, whichever is less.
Should it become necessary for either party to this contract to institute legal action for enforcement of any provisions of this contract, the prevailing party
shall be entitled to reimbursement for all court costs and reasonable attorney's fees incident to such legal action. The parties hereto agree that proper venue
for any legal action in any way related to this contract shall be in Seminole County, FL.
Accepted By:
City of Winter Springs
Company Name Authorized By Printed Name Date
As Its: , (Title)
NEW CONCRETE WALK
(ACCESSIBLE ROUTE)
EXISTING CONCRETE
WALK TO BE REMOVED
AND REPLACED WITH SOD
55'
(4) NEW TUFFTIMBER
BORDERS
I5150)\I NEIE9s!
gnmi 5yRI wJPWA®1 \
1w
ns TRCA'D®1 aesTMe
S13 YESR6
PROPOSED
PLAYGROUND
INSTALLATION
SITE LOCATION MAPNOTTOSCALE
'SEE SHEET PI FOR
36911SF SOD REPLAGEMENT $ITE LOCATION MAP
(SEE SHEET P-2 FOR ENLARGEMENT
SOD REPIACEM€NT LOCATICNSI
SURFACING 1942 AREA]
216D SF
ENGINEERED WOOD FIBER
8MAXIMUM PALL HEIGH7
SURFACING (2-5 AREA)
1010 SF
ENGINEERED WOOD PIBER
3' MAXIMUM FALL HEIGHT
SURFACING [PATH] (SEE SHEET R2 FOR LAYOUT
25D SF
ENGINEERED WOOD FIBER
NO FALL HEIGHT
TOTAL PLAY COMPONENTS: 2-5 AGE AREA- 15
`r12AGE AREA- 1U
TOT/19FVhTFBVLI.R mNPOND1Ts 10
s■q�•{III{ TO D2VATFD CM4^0!ffirtS AGCEGSBIZHY 9AA0' 0 ,!M!Em
lrnG
µLtEvh1E6 CGAp0ekT'TS wCCE89�ESS TSNKEP 10 $C P`
!
Salµ nc FS�IEGRowID1E1 Wm 48a1SS 5 RIZIM 3
Trnµ OEfpigfiivaEsaF GRGImG1FVE1 GOWq�l19 5 1
�� Trnµ 6EVhTFD R,1Y 0aNNMBISs 5 -
faTupDlhlPpCgsCND11sI�ssBIElrRhuP o PEWRD) o
S iS rTIA uA. ESSMUEG OrW✓ET'LTfSACSmEsv&£9Y Txsu✓36Sp+ 5
5 him=
1
TOTµ 11FFEFEYTTYT4bd GRg9N LEYEL mAP011EM6 I �� 1
WELCOME MGN
Iro
w,y�.a.R.�m�.I �N -,--a Pec --y eaa., T.hle 3433.1 a
b
EXISTING CONCRETE
WALK TO BE REMOVED
GN.FLffiI1NtfJI IF]IGTI15
AWAWIING
AND REPLACED WITH
1. EQUIPMENT LOCATION TO BE FIELD VFRIFIrD PRIOR TO
1 *351 Fw FaO:,Ir lin SURFACING PND
NEW CONCRETE WALK
CONSTRUCTION
4 9 IC& I Pw m
(ACCESSIBLE ROUTE}
PAPER SRE
2.ACCEGSIBLE ROUTE OF TRAVELTO THE PLAYGROUND TO
C1314.Pm98
D I'FAi-,.
CHECKFOT AND FOR AUSCBURNS
CHECK FOR HOT SURFACES
22
BE PROVIDED BY OTHERS
1 De�OB
E Ugah... wo89S
EXISTING TUFFTIMBERS
5 LF NEW
3. BASE MUST EXHIBIT POSITIVE DRNNAGE IN ALL AREAS
TO BE REUSED EXCEPT
CONCRETE
J'. 11871
WHERE NOTED
WALK
MNG t 18]1-171
SCALE I"=1°'
City of Winter Springs Winding Hollow Park
(1) NEW
(Ut
7m
TUFFTI MBER
Winter Springs, FL
5' BORDER
r �
1
36
PROPOSED
PLAYGROUND
INSTALLATION
SITE LOCATION MAPNOTTOSCALE
'SEE SHEET PI FOR
36911SF SOD REPLAGEMENT $ITE LOCATION MAP
(SEE SHEET P-2 FOR ENLARGEMENT
SOD REPIACEM€NT LOCATICNSI
SURFACING 1942 AREA]
216D SF
ENGINEERED WOOD FIBER
8MAXIMUM PALL HEIGH7
SURFACING (2-5 AREA)
1010 SF
ENGINEERED WOOD PIBER
3' MAXIMUM FALL HEIGHT
SURFACING [PATH] (SEE SHEET R2 FOR LAYOUT
25D SF
ENGINEERED WOOD FIBER
NO FALL HEIGHT
TOTAL PLAY COMPONENTS: 2-5 AGE AREA- 15
`r12AGE AREA- 1U
TOT/19FVhTFBVLI.R mNPOND1Ts 10
s■q�•{III{ TO D2VATFD CM4^0!ffirtS AGCEGSBIZHY 9AA0' 0 ,!M!Em
lrnG
µLtEvh1E6 CGAp0ekT'TS wCCE89�ESS TSNKEP 10 $C P`
!
Salµ nc FS�IEGRowID1E1 Wm 48a1SS 5 RIZIM 3
Trnµ OEfpigfiivaEsaF GRGImG1FVE1 GOWq�l19 5 1
�� Trnµ 6EVhTFD R,1Y 0aNNMBISs 5 -
faTupDlhlPpCgsCND11sI�ssBIElrRhuP o PEWRD) o
S iS rTIA uA. ESSMUEG OrW✓ET'LTfSACSmEsv&£9Y Txsu✓36Sp+ 5
5 him=
1
TOTµ 11FFEFEYTTYT4bd GRg9N LEYEL mAP011EM6 I �� 1
WELCOME MGN
Iro
w,y�.a.R.�m�.I �N -,--a Pec --y eaa., T.hle 3433.1 a
TOB LOCATED IN CONSULTATION WTN
OWNER
21SNER/I.L NOTES:
GN.FLffiI1NtfJI IF]IGTI15
AWAWIING
SHEET NO.
P-1
1. EQUIPMENT LOCATION TO BE FIELD VFRIFIrD PRIOR TO
1 *351 Fw FaO:,Ir lin SURFACING PND
r
CONSTRUCTION
4 9 IC& I Pw m
PUIYSURFACEG MAY BECOME
PAPER SRE
2.ACCEGSIBLE ROUTE OF TRAVELTO THE PLAYGROUND TO
C1314.Pm98
D I'FAi-,.
CHECKFOT AND FOR AUSCBURNS
CHECK FOR HOT SURFACES
O
BE PROVIDED BY OTHERS
1 De�OB
E Ugah... wo89S
PRIOR TO PLAYINGON THE
o
3. BASE MUST EXHIBIT POSITIVE DRNNAGE IN ALL AREAS
PLAYGROUND
J'. 11871
NOT FOR CONSTRUCTION
MNG t 18]1-171
SCALE I"=1°'
City of Winter Springs Winding Hollow Park
J SI. REP SERVICES, INC.SP—
i� [.Pa.l! GI Pian s aleaa, SP—
(Ut
7m
—
Winter Springs, FL
3690 SF SOD REPLACEMENT
(SEE SHEET P-2 FOR
500 REPLACEMENT LOCATIONS)
SURFACING (5-12 AREA)
2160 SF
ENGINEERED WOOD FIBER
8' MAXIMUM FALL HEIGHT
SURFACING (2-5 AREA
1010 SF
ENGINEERED WOOD FIBER
3' MAXIMUM FALL HEIGHT
SURFACING (PATH)
SEE SHEET P-2 FOR LAYOUT
250 SF
ENGINEERED WOOD FIBER
NO FALL HEIGHT
GENERAL NOTES:
1. EQUIPMENT LOCATION TO BE FIELD
VERIFIED PRIOR TO CONSTRUCTION
2 ACCESSIBLE ROUTE OF TRAVEL TO
THE PLAYGROUND TO BE PROVIDED BY
OTHERS
3- BASE MUST EXHIBIT POSITIVE
DRAINAGE IN ALL AREAS
NOT FOR CONSTRUCTION
/� scnEe: uIc = r
tl !A
NEW CONCRETE WALK
(ACCESSIBLE ROUTE)
EXISTING CONCRETE
EXISTING CONCRETE WALK WALK TO BE REMOVED
TO BE REMOVED AND AND REPLACED WITH NEW
REPLACED WITH SOD CONCRETE WALK
(ACCESSIBLE ROUTE)
(4) NEW TUFFTIMBER
BORDERS 6'
--------------
17€}pSE�- - g
SOD 15 5 LF NEW
REPLACEMENT 1 NEW
i CONCRETE WALK i )
TUFFTIMBER
BORDER
1775 SF r --
REPLACEMENT
u
L_.,.
215 SF
SOD REPLACEMENT
11) NEW TUFFTIMBERS
AT PATH
EXISTING TUFFTIMBERS SHEET�rNj�O.
TO BE REUSED EXCEPT P—L
WHERE !VOTED nnaEa spE
Site Location Map W GA 1,9T,
oRa 51"nevi-i 1
City of Winter Springs Winding Hollow Park%mREPSERVICES,INC.
E.prlvl PVYY UvIEwSpun
Winter Springs, FL
U� 3
lr� F�
{-� FOR k BETTER TOMORROW Proudly presented tay:
WE 'PLAY TODAY «. mai
landscape#6 it
., shapedbyplay.com REP SERVICES, INC.
structures v , E,pe,tz of Play & 0-t0w, Speak
r t
"
FOR 4 BETTER TOMORROW Proudlpey presented hy.
landscape a R' Es mi
WE PLAY TODAY 4S NothmAd�w n,
r►
structuresshapedbyplayxom REP SERVICES, INC.
pats Pt Play & 0.1door SFwin
{
Wz
structures
FOR k BETTER TOMORROW
WE PLAY TODAY
shapedbyplay.com
P,--,ldl, pl-emerc: !1.
Nathan Nmon
III,
REP SERVICES, INC.
bp"ts of Play 6 ow'l r Spucri
kb
FOR0. BETTER TOMORROW.°`.'.�.ETK� WE PLAY TODAY
landscape
structures. shapedbyplay.cdm
Air `
Cot
Proudly Fwesewe d lay. RM
Nethm Almon Ill)
I�
REP SERVICES, INC.
Lkp"ts of May S 04fcf.- sp—,