HomeMy WebLinkAbout2018 01 03 Regular 502 Preliminary Engineering Plan for Winter Springs Townhomes
PLANNING & ZONING BOARD
AGENDA
ITEM 502
Consent
Information
Public Hearing
Regular X
January 3, 2018
Meeting
REQUEST:
The Community Development Department requests that the Local Planning
Agency/Planning & Zoning Board consider a Preliminary Engineering Plan for Winter Springs
Townhomes, a proposed 114-unit townhome subdivision by Dream Finders Homes located in the Town
Center at the northeast corner of Michael Blake Boulevard and Tree Swallow Drive.
SYNOPSIS:
Winter Springs Townhomes is a proposed 114-unit townhome development by Dream
Finders Homes located in the Town Center at the northeast corner of Michael Blake Boulevard and
Tree Swallow Drive.
CONSIDERATIONS:
APPLICANT AND PROPERTY INFORMATION:
Applicant: Dream Finders Homes
Property Owner: Winter Springs Holdings, Inc.
Property Location: NE corner of Michael Blake Blvd and Tree Swallow Dr.
Property Parcel ID numbers: 26-20-30-5AR-0A00-007K
Current FLUM Designation: Town Center District
Current Zoning Designations: T-C (Town Center)
January 3, 2018
Planning & Zoning Board Agenda, Item 502
24
Page of
APPLICABLE LAW, PUBLIC POLICY, AND EVENTS:
Home Rule Powers
Winter Springs Code of Ordinances
Town Center District Code
City of Winter Springs Comprehensive Plan
DISCUSSION:
Overview:
Dream Finders Homes is proposing a 114-unit townhome subdivision in the Town Center. The 8-acre
parcel is located at the northeast corner of Michael Blake Boulevard and Tree Swallow Drive (see
Exhibit 1). The site is bordered on the north and east by the Cross-Seminole Trail, on the west by
Michael Blake Boulevard, and on the south by Tree Swallow Drive. The property is in the T-5 transect
of the Town Center, which includes single-family attached units (townhomes) as a permitted use.
Site Background:
The 8-acre site is part of a larger parcel of approximately 46-acres that was previously owned in its
entirety by Winter Springs Holdings, Inc. (IBEW). Winter Springs Holdings sold portions of the
property to other entities, including Catalyst Development Partners, who is currently building an
apartment project on the west side of Michael Blake Boulevard. The 8-acre property is subject to a
Developer’s Agreement that includes the following applicable provisions:
After the Catalyst Apartment Project (currently under construction), no additional apartment
units are permitted anywhere on the 46-acre property
Parcels fronting SR 434 and Tuskawilla Road must be developed with a commercial use
The property is served by a master stormwater treatment facility that is currently under
construction as part of the Catalyst Apartment Project
Proposed Layout / Unit Type:
The proposed townhomes are all two-stories and are located in 20-buildings ranging in size from 3 to
10 units per building. Please see Exhibit 2 for the Preliminary Engineering Plan and Exhibit 3 for
photos of existing townhomes that are similar to what Dream Finders is proposing. The subdivision
features a grid of public streets and private alleys, consistent with the Town Center Code. Townhome
units along the perimeter of the development will front Tree Swallow Drive, Michael Blake Boulevard,
and the Cross-Seminole Trail. The internal buildings will all face public streets. All units have two-car
garages accessed from alleys at the back of the buildings.
Site Amenities:
The central area of the subdivision includes a pool, cabana, and green space / park area. A main feature
of the subdivision will be the immediate access to the Cross-Seminole Trail, with the ability for residents
to use the trail for access to nearby shopping, schools, parks, and other community destinations.
Water and Sewer:
Water and sewer facilities are available to the site in Michael Blake Boulevard. A lift station is being
built at the northwest corner of the property that will serve both the Catalyst Apartment project and the
proposed Dream Finders townhome subdivision. The City has water and sewer plant capacity to serve
the 114-unit townhome development.
January 3, 2018
Planning & Zoning Board Agenda, Item 502
34
Page of
Transportation:
Winter Springs Townhomes will be accessed from both Michael Blake Boulevard and Tree Swallow
Drive. The existing and future Town Center street network provides multiple options for residents to
reach their desired destinations. At the SR 434 / Michael Blake Boulevard intersection, a traffic signal
will be constructed by the City when it meets the applicable traffic warrants.
Stormwater:
Winter Springs Townhomes will be served by a master stormwater pond currently being constructed as
part of the Catalyst Apartments project. No additional onsite stormwater treatment is required. Onsite
stormwater collection and piping facilities will route stormwater to the pond located on the east side of
the Trail Bridge.
Parking:
All townhome units will have two-car garages. In addition, the subdivision will have approximately 95
on-street parking spaces. The proposed overall parking ratio of approximately 2.8 parking spaces per
unit is consistent with other townhome projects in the Town Center, but this will be verified by a more
detailed parking analysis to be submitted as part of the final engineering plans.
Reports:
The Final Engineering submittal is required to include the following reports (or updates of previously
prepared reports for the same property):
Geotechnical Engineering
Traffic Study
Ecological Study (listed species)
Water and Sewer Analysis
Parking Analysis
Stormwater Report
Fiscal Analysis
In addition, the applicant is required to obtain a SCALD letter from SCPS verifying there is adequate
school capacity for the new students.
Open Staff Comments:
Exhibit 4 includes the open Staff comments on the Preliminary Engineering plans, and shall be
considered conditions of approval.
Preliminary Plan Approval:
Pursuant to Section 9-49 of the City Code, the approval of a Preliminary Plan shall only be construed
only as authority for submitting a Final Plan.
Exhibit 4 lists the open staff comments that are to be addressed by the applicant as part of the final
engineering plans.
FISCAL IMPACT:
January 3, 2018
Planning & Zoning Board Agenda, Item 502
44
Page of
Development of the subject property as a 114-unit townhome project is anticipated to provide an
increase to the City’s taxable value. The potential tax revenue of the proposed subdivision at buildout
is estimated to be $50,000/year.
:
COMMUNICATION EFFORTS
The Meeting Agenda and this Agenda Item have been forwarded to the Planning and Zoning Board
members and are available on the City’s Website, LaserFiche, and the City’s Server. The Agenda has
been forwarded to the Mayor and City Commission; City Manager; and City Attorney/Staff.
Additionally, the Meeting Agenda has been sent to media/press representatives, all Homeowner’s
Associations on file with the City, all individuals who have requested Agenda information, Department
Directors; and also posted outside City Hall; posted inside City Hall with additional copies available for
the general public.
STAFF RECOMMENDATION:
Staff recommends that the Local Planning Agency/Planning & Zoning Board forward a
recommendation of approval to the City Commission for the Preliminary Engineering Plans for Winter
Springs Townhomes.
ATTACHMENTS:
1.Exhibit 1 – Vicinity Map
2.Exhibit 2 – Preliminary Engineering Plan
3.Exhibit 3 – Townhome Photos
4.Exhibit 4 – Open Staff Comments