HomeMy WebLinkAbout2017 08 14 Consent 301 Contract Award for Construction of Sidewalk and Curb Replacement at Various LocationsCOMMISSION AGENDA
ITEM 301
REQUEST:
Informational
Consent
X
Public Hearings
Regular
August 14, 2017 KS BF
Regular Meeting City Manager Department
The Community Development Department requesting City Commission authorization to
enter into an agreement with Accu - Krete, Inc. for the Concrete Sidewalk and Curb
Replacement project in the amount of $79,585.00 plus a 20% contingency.
SYNOPSIS:
This construction project consists of concrete sidewalk and curb replacement at various
locations in advance of asphalt resurfacing scheduled in the fall of 2017, plus additional
locations based on necessary sidewalk and curb repairs. This agenda item is to award
the construction contract to the lowest responsive bidder, Accu - Krete, Inc., in the amount of
$79,585 plus a 20% contingency.
CONSIDERATIONS:
. The City's annual asphalt resurfacing program is scheduled for construction in the
fall of 2017. In advance of asphalt resurfacing, Staff performs a detailed
inspection of all sidewalks and curbs along the roadway segments to be resurfaced
and identifies any sidewalk and /or curb locations needing repair or replacement.
In addition, Staff also identifies sidewalk and curb replacements at other locations
based on routine preventative maintenance inspections and resident input.
. This construction project consists of approximately 2,400 linear feet of concrete
sidewalk replacement and 425 linear feet of curb replacement at the following
locations:
Consent 301 PAGE 1 OF 3 - August 14, 2017
• Sherry Avenue
• Wade Street [SR 434 to SR 419]
• S. Hawthorne Circle
• Northern Way — East [Winter Springs Blvd to 1217 Northern Way]
• Wood Duck Drive
• White Cloud Court
• Northern Way — West [Vistawilla Drive to Tuscora Drive]
• Carrington Avenue
• Carrington Court
• Kentstown Court
• Tiverton Street
• Sybilwood Circle
• Clubwood Court
• Albert Street
• Burgos Street
• N. Hawthorne Circle
• Evergreen Avenue
• Gumtree Court
• Night Owl Lane
• Night Owl Court
e Bid Results:
1. Accu - Krete, Inc
$79,585.00
2. MCG Services, LLC
$84,355.50
3. NuWave Concrete
$88,987.16
4. Barracuda Building Corp
$92,744.60
. Based on Staff s review of the bids, Staff is recommending award of the
construction contract to Accu - Krete, Inc. Staff met with the representatives of
Accu - Krete, Inc. on July 14, 2017 to discuss Accu - Krete's experience, resources,
approach to the work, and their ability to complete the work on schedule. Accu-
Krete has successfully completed similar work for the City in the past.
. Construction is expected to begin in August 2017 and be completed in October
2017.
FISCAL IMPACT:
The project cost is $79,585.00 plus a 20% contingency, for a total authorization of
$95,502.00, funded by the Transportation Improvement Fund (Local Option Gas Tax), line
code 4120 -41- 0000 - 545420.
Consent 301 PAGE 2 OF 3 - August 14, 2017
&20081,&$7,21())2576
7KLV$JHQGD,WHPKDVEHHQHOHFWURQLFDOO\IRUZDUGHGWRWKH0D\RUDQG&LW\&RPPLVVLRQ
&LW\0DQDJHU&LW\$WWRUQH\6WDIIDQGLVDYDLODEOHRQWKH&LW\¶V:HEVLWH/DVHU)LFKHDQG
WKH&LW\¶V6HUYHU$GGLWLRQDOO\SRUWLRQVRIWKLV$JHQGD,WHPDUHW\SHGYHUEDWLPRQWKH
UHVSHFWLYH0HHWLQJ$JHQGDZKLFKKDVDOVREHHQHOHFWURQLFDOO\IRUZDUGHGWRWKHLQGLYLGXDOV
QRWHGDERYHDQGZKLFKLVDOVRDYDLODEOHRQWKH&LW\¶V:HEVLWH/DVHU)LFKHDQGWKH&LW\¶V
6HUYHUKDVEHHQVHQWWRDSSOLFDEOH&LW\6WDII0HGLD3UHVV5HSUHVHQWDWLYHVZKRKDYH
UHTXHVWHG$JHQGDV$JHQGD,WHPLQIRUPDWLRQ+RPHRZQHU¶V$VVRFLDWLRQV5HSUHVHQWDWLYHV
RQILOHZLWKWKH&LW\DQGDOOLQGLYLGXDOVZKRKDYHUHTXHVWHGVXFKLQIRUPDWLRQ7KLV
LQIRUPDWLRQKDVDOVREHHQSRVWHGRXWVLGH&LW\+DOOSRVWHGLQVLGH&LW\+DOOZLWKDGGLWLRQDO
FRSLHVDYDLODEOHIRUWKH*HQHUDO3XEOLFDQGSRVWHGDWVL[
GLIIHUHQWORFDWLRQVDURXQGWKH
&LW\)XUWKHUPRUHWKLVLQIRUPDWLRQLVDOVRDYDLODEOHWRDQ\LQGLYLGXDOUHTXHVWRUV&LW\6WDII
LVDOZD\VZLOOLQJWRGLVFXVVWKLV$JHQGD,WHPRUDQ\$JHQGD,WHPZLWKDQ\LQWHUHVWHG
LQGLYLGXDOV
5(&200(1'$7,21
6WDIIUHFRPPHQGVWKH&LW\&RPPLVVLRQDSSURYHHQWHULQJLQWRDQDJUHHPHQWZLWK$FFX
.UHWH,QFIRUWKH&RQFUHWH6LGHZDONDQG&XUE5HSODFHPHQWSURMHFWLQWKHDPRXQW
RI
Item Unit Quanti
1 Remove and Replace 4" Concrete Sidewalk SF 8783
2 Remove and Replace 6" Concrete Sidewalk SF 1107
3 Remove and Replace Miami Curb LF 429
4 Sod Restoration SY 490
5 Remove and Replace Valley Gutter LF
6 Detectable Warnings EA
7 Root Removal [Greater than 4" diameter] HR
EXHIBIT A
Bid Tabulation
July 6, 2017
Accu - Krete, Inc.
Unit Price Total
MCG Services, LLC
Unit Price Total
NuWave
Unit Price Total
Barracuda Building Corp
Unit Price Total
$7.00
$61,481.00
$7.00
$61,481.00
$7.33
$64,379.39
$7.17
$62,974.11
$7.00
$7,749.00
$12.00
$13,284.00
$9.11
$10,084.77
$9.32
$10,317.24
$15.00
$6,435.00
$19.50
$8,365.50
$27.00
$11,583.00
$32.85
$14,092.65
$8.00
$3,920.00
$2.50
$1,225.00
$6.00
$2,940.00
$10.94
$5,360.60
$15.00
- --
$38.00
- --
$42.00
- --
$59.00
- --
$200.00
- --
$250.00
- --
$250.00
- --
$550.00
- --
$60.00
- --
$22.00
- --
$150.00
- --
$240.00
- --
$79,585.00
$84,355.50
$88,987.16
$92,744.60