HomeMy WebLinkAbout2017 07 10 Consent 301 Water Reclamation Facilities Sand and Grit RemovalCOMMISSION AGENDA
ITEM 301
REQUEST:
Informational
Consent
X
Public Hearings
Regular
July 10, 2017 KS KL
Regular Meeting City Manager Department
The Utility Department requesting approval to hire US Submergent Technologies to remove
sand and grit from the East and West Water Reclamation Facilities in the
amount of $150,600 plus a 20% contingency and approval to apply for a grant from the
State to fund up to 50% of the cost.
SYNOPSIS:
This project consists of removing accumulated sand and grit from the wastewater treatment
plants at the East and West Water Reclamation Facilities (WRF) without taking the plants
out of service. The west plant has an estimated 663 tons of materials and the east plant has
about 275 tons. These accumulated materials reduce the efficiency and effectiveness of the
wastewater treatment process.
CONSIDERATIONS:
This project is needed to address the accumulation of sand and grit in the treatment tanks at
the East and West Water Reclamation Facilities. Neither facility has a head works that
would typically exist at a wastewater plant to control and remove sand, grit and inorganic
materials that are detrimental to the wastewater treatment process. Each of the East and
West facilities have two treatment plants that were built in 1970's and 1980's in a ring steel
configuration which provides aeration, clarification, and digestion of the wastewater.
Staff solicited proposals from the only two known vendors, US Submergent Technologies
and Hydro International, that can remove the sand and grit while the wastewater treatment
plants remain in operation. The quotes were $150,600 and $147,000 from US Submergent
Tech and Hydro International, respectively, based on an estimated total of 938
Consent 301 PAGE 1 OF 2 - July 10, 2017
tons. However, US Submergent's quote included a crane which should improve removal
efficiency. Removed materials will be stored on site and landfilled when dried. A
20% contingency is requested to ensure adequate funds are available to remove any
additional sand and grit above the estimated amounts while the vendor is on site.
In addition, the State of Florida has a grant program for sand and grit removal. Up to 50%
of out of pocket costs are eligible for reimbursement. Staff is also requesting authority to
apply for the sand and grit removal grant. No disruption of wastewater service to the
customer is anticipated during this project which will be scheduled over the next 90 days.
FISCAL IMPACT:
The project cost is $150,600 plus a 20% contingency funded by a supplemental
appropriation from fund balance of Utility Enterprise Fund to the Wastewater Plant Repair
and Maintenance line code. Grant approval could reduce the net impact by 50 %.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas /Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at six (6) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff recommends the City Commission approve US Submergent Technologies for sand and
grit removal from the East and West Water Reclamation Facilities in the
amount of $150,600 plus a 20% contingency funded by a supplemental appropriation from
fund balance of Utility Enterprise Fund to the Wastewater Plant Repair and Maintenance
line code, approve applying for a grant from the State to fund up to 50% of the cost, and
authorize the City Manager and City Attorney to prepare and execute any and all applicable
documents.
ATTACHMENTS:
1. US Submergent Technologies Quote and comparison (10 pages)
Consent 301 PAGE 2 OF 2 - July 10, 2017
EAST WWTP 1560 WINTER SPRINGS BLVD.
TANK #1 TANK #2
TONS COST TONS COST VENDOR TOTAL
20 $26,200.00 255 $34,800.00 US Submergent Technologies $61,000.00
20 $22,500.00 255 $62,500.00 Hydro International $85,000.00
No other vendor performs cleaning while tanks are in full operation
SUB TOTAL
WEST WWTP 1000 WEST SR 434
TANK #1 TANK #2
TONS COST TONS COST VENDOR
TOTAL
663 $89,600.00 N/A N/A US Submergent Technologies $89,600.00
663 $62,000.00 N/A N/A Hydro International $62,000.00
No other vendor performs cleaning while tanks are in full operation
COMBINED TOTALS
Recommended Vendor US SUBMERGENTTECHNOLOGIES $150,600.00
HYDRO INTERNATIONAL $147,000.00
Recommend US Submergent Technologies because they included a crane for use at the
West WWTP. There are several stationary pieces of equipment and fence preventing
easy access to tanks for cleaning. I believe it would be very difficult if not impossible to
reach all areas of the tank for cleaning without a crane.
SUBMERGENT Formed y
TECW OLOGIES
Paul Morrison
Utility Superintendent
City of Miami Springs
1000 W State Rd 434
Winter Springs, Fl, 32708
RE: and and Grit Removal from the West Facility — Tank #1- Aeration #1, #2, #3 and Tank #2-Digester #2, Aeration
#1 and #2
Please find attached an estimate to provide a complete operation of removing, hauling, and dumping at a designated area
on-site.
Benefits of US Submergent Technologies for your Removal:
• Material can be removed in submerged environment.
• High production rate removing material in large structures,
• Closed loop system, clean operation.
• Limited exposure to confined spaces.
• Minimize overhead loads that are typical of a clam shell operation
Based on our understanding, the scope of the project includes:
and and Grit Removal — Tank #1 and Tank #2
June 14, 2017
Page 2
....... ..... ....
.. .. I ... ...
Tank Description: Tank #1 and Tank #2-West Facility
Mobilization to project
1
Ea
$1,200.00
$1,200.0
All labor, supervision, material, and equipment for the
removal of sand and grit from the Tank #1 and Tank #2
10
Days
$8,000.00
$80,000.00
at the West Facility
Third Party rental crane equipment
1
week
$2,50000_
Transportation — On-site Disposal
51
PerLoad $1100.00
$5,100.00
Material Testing (RCRA ***if required'
1 t
Ea
$80000
$800.00
Disposal Cost — On-site Material Management
663
PerTon
NA
NA
tons
This project is being presented as a unit price proposal. All line items are billed at unit price provided in the pricing
schedule for the project.
MMZZM■
• Proper access for the equipment in and around the facility
• Sufficient suitable water supply for the high pressure jetting operation (reclaimed is sufficient) as needet
• Proper access for the pump/vacuum heads of the US Submergent process
• Access for tankers and/or roll off trucks
• Client warrants that the material will be non-hazardous
(786) 4i 9-6991.
am=
L
Randy Cordrey
Zt-
Ns��
Paul Morrison
Utility Superintendent
City of Miami Springs
1000 W State Rd 434
Winter Springs, Fl. 32708
I.J
TECHN, ULU GIES
Formerly
RE: Sand and Grit Removal from the East Facility — Tank #1 -Digester #1, Aeration Tank #1, #2 and #3
Mr. Morrison,
Please find attached an estimate to provide a complete operation of removing, hauling, and dumping at a designated area
on-site.
• Material can be removed in submerged environment,
• High production rate removing material in large structures.
• Closed loop system, clean operation.
• Limited exposure to confined spaces.
• Minimize overhead loads that are typical of a clam shell operation
Based on our unde tandlan- the
235 N. Orange Ave, Suite 201 1 Sarasota, Florida 34236 1 Call Toil -Free - 765 -7866
Sand and Grit Removal — Tank #1 -Digester #1, Aeration Tank #1, #2 and #3-East CAATP
June 14, 2017
Page 2
2
Loads Per Load $100.00
1 —M 1—
Ea $800
20 Per Ton NA
tons
$1,200.00
$24,000.00
$200.00
$800.00
NA
This project is being presented as a unit price proposal. All line items are billed at unit price provided in the pricing
schedule for the project.
Our estimate assumes the Owner will supply:
• Proper access for the equipment in and around the facility
• Sufficient suitable water supply for the high pressure jetting operation (reclaimed is sufficient) as needed
• Proper access for the pump/vacuum heads of the US Submergent process
• Access for tankers and/or roll off trucks
• Client warrants that the material will be non-hazardous
Should you have any questions, or need clarification on this proposal, please do not hesitate to contact me directly at
(786) 449-6991
t!= Mo
Randy Cordrey
US Submergent Technologies
z4 E
235 N. Orange Ave, Suite 201 1 Sarasota, Florida 34236 1 Call Toll-Free 844-765-7866
TECH F'O LO GIES
Paul Morrison
Utility Superintendent
City of Miami Springs
1000 W State Rd 434
Winter Springs, Fl, 32708
RE: Sand and Grit Removal from the East Facility — Tank #2-Grit Chambers #1 and #2
Please find attached an estimate to provide a complete operation of removing, hauling, and dumping at a designated area
on-site.
• Material can be removed in submerged environment.
• High production rate removing material in large structures.
• Closed loop system, clean operation,
• Limited exposure to confined spaces.
• Minimize overhead loads that are typical of a clam shell operation
235 N. Orange Ave, Suite 201 1 Sarasota, Florida 34236 1 it Toll-Free 844-765-7866
Sand and Grit Removal — Tank 42-Grit Chambers #1 and #2
June 14, 2017
Page 2
PRICING SCHEDULE
.................................. . ................
- - - - ------------------------- .........
Mobilization to project
All labor, supervision, material, and equipment for the
removal of sand and grit from the Tank #2-Grit Chambers
#1 and #2-East VVVVTP
Em
W
M
1 20
1 Loads I
255
tons
Ea i NA
!°.�. n
Per Load I 1 $100.00 1
— Ea 1-1800.-0-0 F
Per Ton NA
NA
$32,000.00
$2,00U0
$800,00
NA
ox
This project is being presented as a unit price proposal. All line items are billed at unit price provided in the pricing
schedule for the project.
Our estimate assumes the Owner will supply-
• Proper access for the equipment in and around the facility
• Sufficient suitable water supply for the high pressure jetting operation (reclaimed is sufficient) as needed
• Proper access for the pump/vacuum heads of the US Submergent process
• Access for tankers and/or roll off trucks
• Client warrants that the material will be non-hazardous
Should you have any questions, or need clarification on this proposal, please do not hesitate to contact me directly at
{786)449 -6991.
Randy Cordrey
US Submergent Technologies
235 N. Orange Ave, Suite 201 1 Sarasota, Florida 34236 1 Call Toll-Free g441-765-7866
Tt,
■
LLC .:� POLSTON
TECHNOLOGIES
6450 UNIVERSITY BLVD UNIT I
WINTER PARK, FL 32792
INSURER A: Rockhlll Insurance Cc y _ __..
INSURER B: Auto Owners Insurance 1
INSURER C: i i t l y 10701
i
#T !` #r ULI-IfREl
.
,; ■ # # � . is - � � : - �
I
'
OLICY NUMBER
MMIDO
MIDD YY1 LIMITS
COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
CLAIMS -MADE 1K OCCUR
17 -00
09113/2016
09/13/2017 GAVAG?TaAE0T ='n
50,000
PREMISES I Ea occurrence'
$ 1
ED ESP (Any one person)
$ 5,00C
X EACH L CONDITI
1,000,00(
PERSONAL &ADV INJURY
$
GEN'L AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE
$ 2,
POLICY � PRO- ❑
:
JEGr LOU
PRODUCTS - coMP(oPAGG
$ 2,
OTHER:
$
AUTOMOBILE LIABILITY
COMBINED SINGLE LIMIT
$ 1,000,000
ANYAUTO
27-
09/131201
f Ea accident.
09/1312017 BODILY INJURY (Per person)
$
ALL OWNED X SCHEDULED
AUTOS _ AUTOS
BODILY INJURY Per accident
( }
$
HIRED AUTOS NON -OWNED
AUTOS
PROPERTY DAMAGE
;Per accide l
$
1
$ 10,000
UMBRELLA LIAR X OCCUR
EACH OCCURRENCE
$ 4,000,000
EXCESS LIAR CLAIMS -MADE
. -
V 17 7 -00
09113/2016
09/1312017 AGGREGATE
$ 4,000,OOD
DED RETENTION $ 10,000
$
WORKERS COMPENSATION
x PER TH-
AND EPLOYES'LIAILITY YIN
STATUTE ER
.
ANY PROPRIETORIPARTNERtEXECUTIVE
083056181
01/01/2017
01101/2018 E.L. EACH ACCIDENT
$ 1,
OFFICER(MEMBER EXCLUDED? 1 A
— _
_ '
(Mandatory In H)
E.L. DISEASE - EA EMPLOYE::
$ 1:
If yes, describe under
- -
-
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$ 1,000,001
l!rfx#:t1 ■ I yr.4*S>if �i� k� OR BT 1. Lt
ll " T7 1 -
C � : 1
iiis GI
AUTHORIZED REPRESENTATIVE
@ 1988-2014 ACORD CORPORATION. All rights reserved.
ACORD 25 (2014/01) The ACORD name and logo are registered marks of ACORD