HomeMy WebLinkAbout2017 03 27 Consent 300 Dunmar Estates Water Main ReimbursementCOMMISSION AGENDA
ITEM 300
REQUEST:
Informational
Consent
X
Public Hearings
Regular
March 27, 2017 KS KL
Regular Meeting City Manager Department
Utility Department requests approval to reimburse the developer of the Enclave at Dunmar
Estates for a portion of the offsite water main improvements requested by the City to
improve water distribution system circulation and reliability.
SYNOPSIS:
The developer of the Enclave at Dunmar Estates has completed the installation of the
water main interconnect, as requested by the City to construct a more direct water
distribution system connection between WTP #1 and WTP #3 through Dunmar Estates.
Reimbursement of $58,521.76 and $3,360 for construction and engineering,
respectively, for a total of $61,881.76 is consistent with the approvals granted with the
final engineering on August 8, 2016.
CONSIDERATIONS:
This agenda item is needed reimburse the developer of the Enclave at Dunmar Estates for
the installation of additional water main requested by the City which will improve water
distribution circulation, reliability and pressure for customers in the Seville
Chase/Ranchlands areas and the southern half of Oak Forest.
The final engineering for the Enclave at Dunmar Estates was approved on August 8, 2016
which included a recommendation for reimbursement to the developer for the installation of
a water main extension requested by the City to complete a more direct interconnection
between Oak Forest and Seville Chase. The City has been desirous of having this
interconnection in place which will result in improved water circulation, reliability and
pressure. The attached exhibit shows the location of the new water main. The developer is
Consent 300 PAGE 1 OF 2 - March 27, 2017
funding 100% of the costs to extend the water main 2,400 feet to serve the Enclave at
Dunmar Estates. The City is funding the remaining 1,500 foot water main extension needed
to complete the loop which represents approximately 40% of the total water main
construction costs.
The water main has been constructed and cleared by the State for use. Once the city
receives all necessary documents (as- builts, bill of sale, 2 year warranty /surety, easements,
etc.) then the payment will be released.
FISCAL IMPACT:
The water main reimbursement was budgeted in the Utility Enterprise Fund at $60,000.
Funds will be transferred from other capital projects to cover the total cost of $61,881.76.
Payment is expected to be made in 30 days.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas /Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at six (6) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff recommends the City Commission approve the reimbursement of $61,881.76 to
Michael D. Jones and Associates for the installation of water main improvements needed to
improve customer service, payable from the Utility Enterprise Fund Capital Improvements
line code, and authorize the City Manager and City Attorney to execute any and all
applicable documents.
ATTACHMENTS:
1. Location Exhibit (1 page)
2. Cost Breakdown (1 page)
Consent 300 PAGE 2 OF 2 - March 27, 2017
410 III4 // EFFLUENT DISPOSAL
SITE 17
1115III4�
1115
111
Attachment No. 1
'12,
1127
-
763 765 767 Q� \
769 P
\ E ECTRO
768 791 v
GATE 1 �- _
1002 - 773
I
1000 772 775
1 1
1
�
774 777
998 997 776 77
i1I74 I76 I78
170 172
I 1
� �
996 778
SETA 177
171 173 I75
1
1
994 995 703 780
70I
169
�
� � �
992- 70 784
706 T 0
990 704 702 986
706
X167
Enclave a t
988 987 788
702 704
708-
I
986 �
985 751 753
701 703 709
1
1
D u n m a r
755
984
983 752 IG 79
705
� 982
' °'
1
� _ 795
^^
98I 754 756
`
Estates
980 v.. 797
978 979
7999
I
9770
1
976 975 S
- -
�
974 973
97I
972970
600
602 604 606 608
-
O
9
968
966
964962
601 61
1
530 96(
603 605 6 0' 609
Z 53 City Funded
10502504
w 010
Water Main 01 X011016
m 506
508
560
� 00 9
510
503 505
IW 507
552 011
I 013
/
Interconnect 101 101
509 511
545
SW
11
566
_ 982
- 985 980
02 404 406 1
557
983 978
��1� ]000 002 981 979 9769,
408 i
1
405
11 I
650 004 977 975 973 s
549 11 ]OOI 006 •..
410
1
1 (I
572 gC
00
�1 1003 010
407 409 I
1
J
II 1005 007 012 �q
OQ
I
I
ELECTRONIC 009 8
580 GA E \ ti 011
11013
/
11
1004 006 890
- - 015
04 1
DUNMAR WAY 1008101 892 1
'5
578 575
Developer
012 1
1
585 901 01
I 894 I
\
' Funded
Water
02 1016
586 905 904 1013 896 / 7
905 898
06
204
1
098
906
1
202 207 I
Main E n s i o n 590
907
589 587 909 908 10946 1097 �
7 205 1
/Ate
1
593
]023
911 9I0 1
1093
03
20I ��
1092
913 912 ]09I 1025
I
1090
914 1089 102,
_
1086
111
087
100
/
- - 10.
09
07
108 /i ^
I
-
� 951 1080 7085,1
� 1
953
105
/103 \11
;_
600
1083
606 955 / 020
106
V
957 ]O8I � �I022
104/ 101
it 102
i 1 1
TINALN
959 1076
956 10791 1024
]00
I
620 621
961 1074 1 '1026 101,
]077
6I0 963 962 ]072 1075 11028 1027
1
- E
1 /
L�TRIONIC
GATE
965 964 1070
- 10731 11030
11 /
�
I
967 � 966 ]068 029
1032 1
265
268
626 / J
/ 625
968 1071 1
969
-- _ 1066 1 1034
]069
�
�
971 970 1064
I 0360
1
630
/ / i '
/
973 972 1062 065 I
266
I
/ /
992 994 996
975 1060
/
063 990
802
681
ar D N _ - -
_ _
061 988
1054 ^ / i
991 5
_
986
1055
° _ \ELECTRONIC
GATE
645
1052 ]053
/ i 983
989
985 987
� 1 655
I
10491 1�
-
- "'
00;
w 1009
/
I
I �
901
911 921
931 �
- -
10461
101bo
1014 012
01 100
1p1a
1041 ,1022 017 015 013 011,
Attachment No. 2
I I �.4
Clearing • Demolition • Utilities - Site Development
25 Windsormere Way • Suite 301 • Oviedo, FL 32765 • (407) 971 -6948 • Fax: (407) 971 -6949
Dunmar Estates Water Main Proposal
Shared Costs Breakdown
Friday, July 15, 2016 Revised Per City Comments
SCOPE OF WORK
DESCRIPTION QTY UNIT PRICE. TOTALS
M DJ Costs
Connect To Existing
8" PVC WM
8" Gate Valves
Fire Hydrant Assemblies
Stubout and Blow Off Assy to Enclave at Dunmar
Stubout and Blow Off Assy to Dunmar Circle
Sin-le Water Services
Fittings and Testing
Survey, Layout and Asbuilts
Traffic Control
Mobilization
City Of Winter Springs Cost
Connect To Existing
Temporary Jumper
8" PVC WM
8" Gate Valves
2" Stubout and Blow Off Assy to Julie Lane
Fire Hydrant Assemblies
Single Water Services
Fittings and Testing
Survey, Layout and Asbuilts
Traffic Control
Mobilization
No Dewatering is inlcuded. If needed Extra Costs Would Apply
No Permits are Included in the Proposal.
No Geotechnincal Testing is Included.
Inspection Fees By Others
1 EA
$968.62
$968.62
2360 LF
$18.72
$44,185.25
1 EA
$1,583.07
$1,583.07
3 EA
$4,011.70
$12,035.10
1 LS
$2,780.93
$2,780.93
1 LS
$2,780.93
$2,780.93
11 EA
$604.44
$6,648.88
1 LS
$4,834.00
$4,834.00
1 LS
$6,000.00
$6,000.00
1 LS
$2,233.40
$2,233.40
1 LS
$1,200.00
$1,200.00
MDJ Costs Subtotal
$85,250.19
1 EA
$968.62
$968.62
1 EA
$1,848.80
$1,848.80
1540 LF
$18.72
$28,832.75
1 EA
$1,583.07
$1,583.07
1 LS
$1,882.13
$1,882.13
2 EA
$4,011.70
$8,023.40
4 EA
$604.44
$2,417.78
1 LS
$6,188.62
$6,188.62
1 LS
$4,200.00
$4,200.00
1 LS
$1,976.60
$1,976.60
1 LS
0.00
$600.00
City Of Winter Springs Subtotal
$58,521.76
TOTAL
$143,771.95
Approved By: