maintenance for any applicable stationary generator set. The City's generators would not be
required to be retrofitted to the new standards except for the fact that we are participating in
the curtailable power program. We estimate that the payback is less than four years to
upgrade the emissions and remain in the Duke energy program.
Quotes were solicited from Caterpillar ( Ringpower) and Cummins - the two main
generator companies in the US. Cummins quote was $98,130.66 and the Ringpower quote
was $75,203.50. However, Ringpower declined to include the removal, disposal, and
replacement of the current insulation. Staff recommends using Cummins for this work
based on their responsiveness and completeness of the quote.
No disruption of wastewater service is anticipated during this project which should be
completed within two weeks of commencement.
FISCAL IMPACT:
The project cost is $98,130.66 plus a 10% contingency funded by the Utility Enterprise
Fund Capital Improvements line code. This project was budgeted at $80K and available
funds from other projects will be transferred to cover the increased cost.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas /Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at six (6) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff recommends the City Commission authorize Cummins Power Generation to retrofit
the two wastewater plant emergency generators to meet current emission standards at a cost
of $98,130.66 plus a 10% contingency payable from the Utility Enterprise Fund Capital
Improvements line code and authorize the City Manager and City Attorney to prepare and
execute any and all applicable documents.
ATTACHMENTS:
1. Cummins Power Generation Proposal (2 pages)
Consent 302 PAGE 2 OF 2 - February 13, 2017
Quotation
CUMMINS SALES AND SERVICE
5125 Hwy 85
Atlanta GA 30349 United States
Direct: 404 - 765 -5145
December 1, 2016
City of Winter Spring Utilities Dept.
390 Old Sanford Oviedo Road
Winter Spring FL 32708 United States
Main: 407 - 327 -5983
Attention: Paul Morrison
Project Name: City of Winter Spring RICE - NESHAP upgrade
Quotation: 4074000000004092
Thank you for your inquiry. We are pleased to quote as follows:
USD
Catalyst DOC Johnson Matthey Inline DOC Converter for West and East Side 750kw 2
Cummins K38 Gensets
HAPGuard Emission System Monitoring System Johnson Matthey HAP for each genset 1
Insulated Blankets Thermo Blanket wrap for each engine, we will cover from the Turbo outlet 1
elbow to the wall inside the building, this will include covering the new JM DOC.
Emission Testing Emission EPA certification Testing with all required documents to FDEP, RICE- 1
NESHAP 40 CFR Part 63 subpart ZZZZ
Included Freight included on all materials and parts 1
Racor CCV Included adding Closed Crankcase ventilation devices on both West & East 1
Side Genset engines
Mechanical Mechanical Contractor required to install new emission devices, all required
pressure tubing, electrical conduits and wiring to HAPGuard Monitoring
Labor Labor included to install Crankcase system, insulation blankets, run relays for
monitoring system, provide load bank for emission testing on both units
Misc. Chrg. Misc. charges for travel, overnight stay, meals during installation and testing
Load Bank Included charges for Load Bank and cables to use during emission testing
Grand Total $98,130.66
Price breakout per site:
Eastside WTP $ 51,174.33
Westside WTP $ 46,956.33
Florida Sales Tax is not included
Pricing difference is due to the Westside plant genset has some piping insulation installed, we
will reuse this installation and add insulation blankets to the turbo outlet elbow and flex.
(check appropriate action):
RELEASE Hold for Approval
Approval and terms acceptance
Customer Signature Date