Loading...
HomeMy WebLinkAbout2013 12 09 Consent 301 East WRF Liner Repair COMMISSION AGENDA     Informational Consent X ITEM301 Public Hearings Regular       December 09, 2013KSKL Regular MeetingCity ManagerDepartment         REQUEST: The Utility Department requesting authorization to enter into a contract agreement with COMANCO Environmental Corporation of Plant City, Florida for the Repair of the East Water Reclamation Facility (EWRF) Reject Pond Liner at a cost of $97,915.00 plus a 10% contingency.   SYNOPSIS: The reject pond liner at the EWRF is in need of repair and COMANCO Environmental Corporation submitted the lowest cost proposal to perform the work at a cost of $97,915.00.  Work is scheduled to commence in January 2014. CONSIDERATIONS: This work is needed to repair tears in the pond liner and stabilize berm erosion at the East Water Reclamation Facility reject pond.  The reject pond holds treated wastewater that has not met rigid final effluent standards and needs to be retreated.   CPH engineers, Inc. solicited proposals from six firms qualified to perform this type of work and three submitted proposals.  The cost breakdown of the proposals is included in the attached recommendation letter from CPH.   COMANCO Environmental Corporation submitted the lowest cost proposal to perform the work at a cost of $97,915.00.  Terry Zaudtke, P.E. of CPH Engineers, Inc. has reviewed the proposals and provided a recommendation letter for COMANCO which is attached. A 10% contingency is recommended to address any additional unforeseen issues that are discovered when the pond is drained. Consent 301 PAGE 1 OF 2 - December 09, 2013   COMANCO is anticipated to start work in January 2014 with a 90 day completion period.    FISCAL IMPACT: The project cost is $97,915.00 plus a 10% contingency for a total authorization of $107,706.50.  The budgeted funding sources are the Utility Enterprise Fund (line code 3600- 62100). COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City’s Website, LaserFiche, and the City’s Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City’s Website, LaserFiche, and the City’s Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner’s Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals.     RECOMMENDATION: Staff recommends that the City Commission authorize entering into a contract agreement with COMANCO Environmental Corporation of Plant City, Florida for the Repair of the East Water Reclamation Facility (EWRF) Reject Pond Liner at a cost of $97,915.00 plus a 10% contingency payable from the Utility Enterprise Fund (line code 3600-62100) and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents.  ATTACHMENTS:   1. Exhibit A – CPH engineers, Inc. recommendation letter (2 pages) 2. Exhibit B - Agreement Form (10 pages) Consent 301 PAGE 2 OF 2 - December 09, 2013 ExhibitA ExhibitB CITYOFWINTERSPRINGS,FLORIDA 1126EASTSTATEROAD434 WINTERSPRINGS,FLORIDA327082799 Telephone(407)3271800 Utility/PublicWorks Department THISAGREEMENTMADETHISDAYOF,2013 betweenthe CITY OFWINTERSPRINGS,aFloridamunicipalcorporation(hereinreferredtoasOWNER)andCOMANCO EnvironmentalCorporationauthorizedanddulylicensedtodobusinessintheStateofFlorida(hereinreferred toasCONTRACTOR),asfollows: 1.DESCRIPTIONOFWORK CONTRACTORshallperformthework,inaccordancewiththeContract DocumentsfortheconstructionoftheEASTWRFPondLinerRepair. 2.CONTRACTDOCUMENTS TheContractDocumentsconsistofthisAgreement;allTechnical,General andSupplementaryConditions;SitePlansheetC1byCPHEngineers,Inc.dated6/14/2013,all AddendaissuedpriortoandallChangeOrdersissuedafterexecutionofthisAgreement.Theseform theContractandareincorporatedintothisContractbythisreference. 3.ORDEROFPRECEDENCE Incaseofanyinconsistencyinanyofthedocumentsbearingonthe AgreementbetweentheOWNERandtheCONTRACTOR,theinconsistencyshallberesolvedbygiving precedenceinthefollowingorder: a.Contractor'sBid(Proposal),Agreement,andAddenda b.ChangeOrders c.SpecialConditions d.GeneralConditions AnyinconsistencyintheworkdescriptionshallbeclarifiedbytheOWNERandperformedbythe CONTRACTOR. 4.AGREEMENTINTERPRETATION Atitsdiscretion,duringthecourseofthework,shouldanyerrors, ambiguities,ordiscrepanciesbefoundintheAgreementorspecifications,theOWNERatitssole discretionwillinterprettheintentoftheAgreementandworkdescriptionsandtheCONTRACTOR herebyagreestoabidebytheh‘b9w͸ƭinterpretationandagreestocarryouttheworkin accordancewiththedecisionoftheOWNER.Whenthematerial,article,orequipmentisdesignated byabrandnameandmorethanonebrandnameislisted,itwillbeunderstoodthattheworkisbased ononebrandnameonly.TheCONTRACTORwillberesponsibleforallcoordinationnecessaryto accommodatethematerial,article,orequipmentbeingprovidedwithoutadditionalcosttothe OWNER.Asubstitutematerial,article,orequipmentisallowedifitisreasonablyequivalenttothe brandnamespecified.TheOWNERhasfulldiscretiontodecidewhetherasubstituteisreasonably equivalent.CONTRACTORmustnotifytheOWNERpriortouseofthesubstituteforaspecifiedbrand nameandallowtheOWNERtomakeadeterminationbeforeCONTRACTORusesthesubstitute. Page2 EastWRFPondLinerRepair 5.CONTRACTTIME TheCONTRACTORshallbeginworkwithin 10 daysaftertheissuanceofawritten NoticetoProceedandshallsubstantiallycompletetheworkwithin 90 calendardaysfromthedateof theNoticetoProceed. 6.LIQUIDATEDDAMAGES OWNERandCONTRACTORrecognizethattimeisoftheessenceofthis AgreementandthatOWNERwillsufferfinanciallossiftheWorkisnotsubstantiallycompletewithin thetimespecifiedinParagraph5above,plusanyextensionsthereofallowedinaccordancewiththe GeneralConditions.Theyalsorecognizethedelays,expense,anddifficultiesinvolvedinprovingina legalorarbitrationprecedingtheactuallosssufferedbyOWNERiftheWorkisnotsubstantially completeontime.Accordingly,insteadofrequiringanysuchproof,OWNERandCONTRACTORagree thatasliquidateddamagesfordelay(butnotasapenalty)CONTRACTORshallpayOWNER$500.00 foreachdaythatexpiresafterthetimespecifiedinParagraph5forsubstantialcompletionuntilthe workisfinallycomplete,andthatOWNERhaspaidtoCONTRACTORtheconsiderationofTen($10.00) Dollarsasconsiderationforthisprovision. 7.CONTRACTPRICE,UNITPRICECONTRACT TheOWNERwillpaytheCONTRACTORincurrentfunds fortheperformanceofthework,subjecttoadditionsanddeductionsbyChangeOrder,theTotal ContractPriceof$97,915.00(NinetySevenThousandNineHundredFifteenDollarsandZeroCents. PaymentswillbemadetotheCONTRACTORforactualquantitiesinstalledonthebasisofthe ScheduleofUnitPricesincludedasapartoftheBid,whichshallbeasfullyapartoftheContractasif attachedorrepeatedherein. 8.TERMINATION;DEFAULTBYCONTRACTORANDh‘b9w͸{REMEDIES TheOWNERreservestheright torevokeandterminatethisAgreementandrescindallrightsandprivilegesassociatedwiththis Agreement,withoutpenalty,inthefollowingcircumstances,eachofwhichshallrepresentadefault andbreachofthisAgreement: a.CONTRACTORdefaultsintheperformanceofanymaterialcovenantorconditionofthis Agreementanddoesnotcuresuchotherdefaultwithinseven(7)calendardaysafterwritten noticefromtheOWNERspecifyingthedefaultcomplainedof,unless,however,thenatureofthe defaultissuchthatitcannot,intheexerciseofreasonablediligence,beremediedwithinseven(7) calendardays,inwhichcasetheCONTRACTORshallhavesuchtimeasisreasonablynecessaryto remedythedefault,providedtheCONTRACTORpromptlytakesanddiligentlypursuessuch actionsasarenecessarytherefore;or b.CONTRACTORisadjudicatedbankruptormakesanyassignmentforthebenefitofcreditors orCONTRACTORbecomesinsolvent,orisunableorunwillingtopayitsdebts;or c.CONTRACTORhasactednegligently,asdefinedbygeneralandapplicablelaw,inperforming theWorkhereunder;or d.CONTRACTORhascommittedanyactoffraudupontheOWNER;or e.CONTRACTORhasmadeamaterialmisrepresentationoffacttotheOWNERwhile performingitsobligationsunderthisAgreement;or Page3 EastWRFPondLinerRepair f.CONTRACTORisexperiencingalabordispute,whichthreatenstohaveasubstantial,adverse impactuponperformanceofthisAgreementwithoutprejudicetoanyotherright,orremedy OWNERmayhaveunderthisAgreement. Notwithstandingtheaforementioned,intheeventofadefaultbyCONTRACTOR,theOWNERshall havetherighttoexerciseanyotherremedytheOWNERmayhavebyoperationoflaw,without limitation,andwithoutanyfurtherdemandornotice.Intheeventofsuchtermination,OWNERshall beliableonlyforthepaymentofallunpaidcharges,determinedinaccordancewiththeprovisionsof thisAgreement,forWorkproperlyperformedpriortotheeffectivedateoftermination. 9.FORCEMAJEURE Anydelayorfailureofeitherpartyintheperformanceofitsrequiredobligations hereundershallbeexcusedifandtotheextentcausedbyactsofGod;fire;flood;windstorm; explosion;riot;war;sabotage;strikes(exceptinvolvingCONTRACTOR'slaborforce);extraordinary breakdownofordamagetoOWNER'saffiliates'generatingplants,theirequipment,orfacilities;court injunctionororder;federaland/orstatelaworregulation;orderbyanyregulatoryagency;orcauseor causesbeyondthereasonablecontrolofthepartyaffected;providedthatpromptnoticeofsuch delayisgivenbysuchpartytotheotherandeachofthepartieshereuntoshallbediligentin attemptingtoremovesuchcauseorcauses.IfanycircumstanceofForceMajeureremainsineffect forsixtydays,eitherpartymayterminatethisAgreement. 10.SEVERABILITY IntheeventanyportionorpartthereofofthisAgreementisdeemedinvalid,against publicpolicy,void,orotherwiseunenforceablebyacourtoflaw,theparties,atthesolediscretion andoptionoftheOWNER,shallnegotiateanequitableadjustmentintheaffectedprovisionofthis Agreement.ThevalidityandenforceabilityoftheremainingpartsofthisAgreementshallotherwise befullyenforceable 11.PROGRESSPAYMENTS OWNERshallmakeprogresspaymentsonaccountofthecontractpriceto CONTRACTOR,onthebasisofapplicationforpaymentssubmittedtotheOWNERorh‘b9w͸ƭProject Manager,byCONTRACTORastheworkprogresses,andinaccordancewiththeContractDocuments. Progresspaymentsmaybewithheldif: a.Workisfounddefectiveandnotremedied; b.Contractordoesnotmakepromptandproperpaymentstosubcontractors; c.Contractordoesnotmakepromptandproperpaymentsforlabor,materials,orequipment furnishedhim; d.AnotherContractorisdamagedbyanactforwhichContractorisresponsible; e.Claimsorliensarefiledonthejob;or f.IntheopinionoftheCityofWinterSprings,Contractor'sworkisnotprogressingsatisfactorily. 12.FINALPAYMENT OWNERshallwithholdupto10%oftheContractPriceuntil50%completion.After 50%completion,OWNERshallreduceto5%theamountofretainagewithheldfromeachsubsequent progresspaymentmadetotheContractor.Forpurposesofthissection,theterm"50percent Page4 EastWRFPondLinerRepair completion"shallbethepointatwhichtheOWNERhasexpended50%ofthetotalcostofthe constructionservicespurchasedasidentifiedintheAgreementtogetherwithallcostsassociatedwith existingchangeordersandotheradditionsormodificationstotheAgreement.After50%completion, theContractormaypresenttotheOWNERapaymentrequestforuptoonehalfoftheretainageheld bytheOWNER.OWNERshallpromptlymakepaymenttotheContractor,unlessOWNERhasgrounds forwithholdingthepaymentofretainage. OWNERshallmakefinalpaymenttoCONTRACTORwithinthirty(30)daysaftertheworkisfullyand properlycompleted,ifthecontracthasbeenfullyandtimelyperformed,butsubjecttothecondition thatfinalpaymentshallnotbedueuntilCONTRACTORhasdeliveredtoOWNERacompletereleaseof liensarisingoutthecontract,orreceiptreleasesoflienfullycoveringalllabor,materialsand equipmentforwhichaliencouldbefiled,orinthealternativeabondsatisfactorytoOWNER indemnifyinghimagainstsuchclaims. BymakingpaymentsOWNERdoesnotwaiveclaimsincludingbutnotlimitedtothoserelatingto: a.Faultyworkappearingaftersubstantialcompletionhasbeengranted; b.WorkthatdoesnotcomplywiththeContractDocuments: c.Outstandingclaimsofliens;or d.FailureofContractortocomplywithanyspecialguaranteesrequiredbytheContract Documents. 13.DESIGNATIONOFPROJECTMANAGERORARCHITECTORLANDSCAPEARCHITECT:DUTIESAND AUTHORITY ThedutiesandauthorityoftheOWNERareasfollows: a.GeneralAdministrationofContract.TheprimaryfunctionoftheOWNERistoprovidethe generaladministrationofthecontract.Inperformanceoftheseduties,BrianFields,P.E.,orhis authorizedrepresentativeistheh‘b9w͸ƭProjectManagerduringtheentireperiodof construction.TheOWNER(CITY)maychangetheProjectManagerduringthetermofthis contract. b.Inspections,Opinions,andProgressReports.TheOWNERshallbekeptfamiliarwiththe progressandqualityoftheworkbyCONTRACTORandmaymakeperiodicvisitstotheworksite. TheOWNERwillnotberesponsibleforthemeansofconstruction,orforthesequences, methods,andproceduresusedtherein,orfortheCONTRACTOR'sfailuretoperformtheworkin accordancewiththeContractDocuments. c.AccesstoWorksiteforInspections.TheOWNERshallbegivenfreeaccesstotheworksiteat alltimesduringworkpreparationandprogress.TheProjectManagerisnotobligatedtomake exhaustiveorcontinuousonsiteinspectionstoperformhisdutiesofcheckingandreportingon workprogress,andanysuchinspectionsshallnotwaiveOwner'sclaimregardingdefectivework byContractor. Page5 EastWRFPondLinerRepair d.InterpretationofContractDocuments:DecisionsonDisputes.TheOWNERwillbetheinitial interpreterofthecontractdocumentrequirements,andmakedecisionsonclaimsanddisputes betweenCONTRACTORandOWNER. e.RejectionandStoppageofWork.TheOWNERshallhaveauthoritytorejectworkwhichin itsopiniondoesnotconformtotheContractDocuments,andinthisconnectionmaystopthe workoraportionthereof,whennecessary. f.PaymentCertificates.TheOWNERwilldeterminetheamountsowingtoCONTRACTORas theworkprogresses,basedonCONTRACTOR'sapplicationsandOWNER'sinspectionsand observations,andwillissuecertificatesforprogresspaymentsandfinalpaymentsinaccordance withthetermsoftheContractDocuments. 14.PROGRESSMEETINGΑ h‘b9w͸{ProjectManagermayholdperiodicprogressmeetingsonamonthly basis,ormorefrequentlyifrequiredbytheOWNER,duringthetermofworkenteredintounderthis Agreement.CONTRACTOR'sProjectManagerandallotherappropriatepersonnelshallattendsuch meetingsasdesignatedbytheh‘b9w͸{ProjectManager. 15.RESPONSIBILITIESOFCONTRACTOR CONTRACTOR'sdutiesandrightsinconnectionwiththeproject hereinareasfollows: a.ResponsibilityforSupervisionandConstruction.CONTRACTORshallbesolelyresponsible forallconstructionunderthiscontract,includingthetechniques,sequences,proceduresand means,forthecoordinationofallwork.CONTRACTORshallsuperviseanddirectthework,and giveitallattentionnecessaryforsuchpropersupervisionanddirection. b.DisciplineandEmployment.CONTRACTORshallmaintainatalltimesstrictdisciplineamong hisemployees,andheagreesnottoemployforworkontheprojectanypersonunfitorwithout sufficientskilltoperformthejobforwhichhewasemployed. c.FurnishingofLabor,Materials,etc.CONTRACTORshallprovideandpayforalllabor, materialsandequipment,includingtools,constructionequipmentandmachinery,utilities, includingwater,transportation,andallotherfacilitiesandworknecessaryfortheproper completionofworkontheprojectinaccordancewiththeContractDocuments. d.PaymentofTaxes:ProcurementofLicensesandPermits.CONTRACTORshallsecureall licensesandpermitsnecessaryforpropercompletionofthework,payingthefeesthereof. CONTRACTORwarrantsthatit(andsubcontractorsortradesmen,ifauthorizedintheContract Documents)holdorwillsecurealltradeorprofessionallicensesrequiredbylawforCONTRACTOR toundertakethecontractwork. e.CONTRACTORwillprovidewrittenguaranteeforworkandmaterialsforone(1)calendaryear afteracceptancebyOWNER. 16.ASSIGNMENT CONTRACTORshallnotassignorsubcontractthisAgreement,oranyrightsorany moniesdueortobecomeduehereunderwithouttheprior,writtenconsentoftheOWNER. Page6 EastWRFPondLinerRepair a.IfuponreceivingwrittenapprovalfromOWNER,anypartofthisAgreementissubcontracted byCONTRACTOR,CONTRACTORshallbefullyresponsibletoOWNERforallactsand/or omissionsperformedbythesubcontractorasifnosubcontracthadbeenmade. b.IfOWNERdeterminesthatanysubcontractorisnotperforminginaccordancewiththis Agreement,OWNERshallsonotifyCONTRACTORwhoshalltakeimmediatestepstoremedy thesituation. c.IfCONTRACTOR,priortothecommencementofanyWorksubcontractsanypartofthis Agreementbythesubcontractor,CONTRACTORshallrequirethesubcontractortoprovide OWNERanditsaffiliateswithinsurancecoverageassetforthbytheOWNER. 17.THIRDPARTYRIGHTS NothinginthisAgreementshallbeconstruedtogiveanyrightsorbenefitsto anyoneotherthanOWNERandCONTRACTOR. 18.PROHIBITIONAGAINSTCONTINGENTFEES CONTRACTORwarrantsthatithasnotemployedor retainedanycompanyorperson,otherthanabonafideemployeeworkingsolelyforthe CONTRACTOR,tosolicitorsecurethisAgreement,andthatithasnotpaidoragreedtopayany person,company,corporation,individual,orfirm,otherthanabonafideemployeeworkingsolelyfor theCONTRACTOR,anyfee,commission,percentage,gift,orotherconsiderationcontingentuponor resultingfromtheawardormakingofthisAgreement. 19.NOJOINTVENTURE Nothinghereinshallbedeemedtocreateajointventureorprincipalagent relationshipbetweenthepartiesandneitherpartyisauthorizedto,norshalleitherpartyacttoward thirdpersonsorthepublicinanymannerwhichwouldindicateanysuchrelationshipwiththeother party. 20.INDEMNIFICATIONΑ CONTRACTORshallindemnifyandholdharmlesstheCity,itsofficers, employees,andcityattorneys(individuallyandintheirofficialcapacity,fromliability,losses,damages, andcosts,including,butnotlimitedto,reasonableğƷƷƚƩƓĻǤ͸ƭfees,totheextentcausedbythe negligence,recklessnessorintentionalwrongfulmisconductofCONTRACTORandpersonsemployed orutilizedbyCONTRACTORintheperformanceofthisAgreement. TheindemnificationprovidedaboveshallobligatetheCONTRACTORtodefendatitsownexpenseor toprovideforsuchdefense,attheoptionoftheOWNER,asthecasemaybe,ofanyandallclaimsof liabilityandallsuitsandactionsofeverynameanddescriptionthatmaybebroughtagainstthe OWNERoritsofficers,employees,andcityattorneyswhichmaybecoveredbythisindemnification. InalleventstheOWNERanditsofficers,employees,andcityattorneysshallbepermittedtochoose legalcounselofitssolechoice,thefeesforwhichshallbereasonableandsubjecttoandincludedwith thisindemnificationprovidedherein. 21.SAFETY CONTRACTORshallbesolelyandabsolutelyresponsibleandassumeallliabilityforthesafety andsupervisionofitsprincipals,employees,contractors,andagentswhileperformingworkprovided hereunder. 22.CORPORATEREPRESENTATIONSBYCONTRACTOR CONTRACTORherebyrepresentsandwarrants totheOWNERthefollowing: Page7 EastWRFPondLinerRepair a.CONTRACTORisdulyregisteredandlicensedtodobusinessintheStateofFloridaandisin goodstandingunderthelawsofFlorida,andisdulyqualifiedandauthorizedtocarryonthe functionsandoperationssetforthinthisAgreement. b.TheundersignedsignatoryforCONTRACTORhasthepower,authority,andthelegalrightto enterintoandperformtheobligationssetforthinthisAgreementandallapplicableexhibits thereto,andtheexecution,delivery,andperformancehereofbyCONTRACTORhasbeenduly authorizedbytheboardofdirectorsand/orpresidentofCONTRACTOR.Insupportofsaid representation,CONTRACTORagreestoprovideacopytotheOWNERofacorporate certificateofgoodstandingprovidedbytheStateofFloridapriortotheexecutionofthis Agreement. c.CONTRACTORisdulylicensedunderalllocal,stateandfederallawstoprovidethework statedinparagraph1.0herein.Insupportofsaidrepresentation,CONTRACTORagreesto provideacopyofallsaidlicensestotheOWNERpriortotheexecutionofthisAgreement. 23.BOND CONTRACTORshallsupplyamaterials,performanceandpaymentbond(s)inaccordancewith FloridalawandtothesatisfactionofOWNER,inanamountspecifiedintheContractDocuments. 24.INSURANCE DuringthetermofthisAgreement,CONTRACTORshallberesponsibleforprovidingthe typesofinsuranceandlimitsofliabilityassetforthbelow. a.TheCONTRACTORshallmaintaincomprehensivegeneralliabilityinsuranceintheminimum amountof$2,000,000asthecombinedsinglelimitforeachoccurrencetoprotectthe CONTRACTORfromclaimsofpropertydamageswhichmayarisefromanyWorkperformed underthisAgreementwhethersuchWorkareperformedbytheCONTRACTORorbyanyone directlyemployedbyorcontractingwiththeCONTRACTOR. b.TheCONTRACTORshallmaintaincomprehensiveautomobileliabilityinsuranceinthe minimumamountof$1,000,000combinedsinglelimitbodilyinjuryandminimum $1,000,000propertydamageasthecombinedsinglelimitforeachoccurrencetoprotectthe CONTRACTORfromclaimsfordamagesforbodilyinjury,includingwrongfuldeath,aswellas fromclaimsfrompropertydamage,whichmayarisefromtheownership,use,or maintenanceofownedandnonownedautomobiles,includingrentedautomobileswhether suchoperationsbebytheCONTRACTORorbyanyonedirectlyorindirectlyemployedbythe CONTRACTOR. c.TheCONTRACTORshallmaintain,duringthelifeofthisAgreement,adequate‘ƚƩƉĻƩƭ͸ CompensationInsuranceinatleastsuchamountsasarerequiredbylawand9ƒƦƌƚǤĻƩ͸ƭ LiabilityInsuranceintheminimumamountof$2,000,000forallofitsemployeesperforming WorkfortheOWNERpursuanttothisAgreement. SpecialRequirements.Current,validinsurancepoliciesmeetingtherequirementshereinidentified shallbemaintainedduringthetermofthisAgreement.AcopyofacurrentCertificateofInsurance shallbeprovidedtotheOWNERbyCONTRACTORupontheEffectiveDateofthisContractwhich satisfiedtheinsurancerequirementsofthisparagraph24.Renewalcertificatesshallbesenttothe OWNER30dayspriortoanyexpirationdate.Thereshallalsobea30dayadvancewrittennotification totheOWNERintheeventofcancellationormodificationofanystipulatedinsurancecoverage. Page8 EastWRFPondLinerRepair TheOWNERshallbeanadditionalnamedinsuredonallstipulatedinsurancepoliciesasitsinterest mayappear,fromtimetotime. IndependentAssociatesandConsultants.Allindependentcontractorsoragentsemployedby CONTRACTORtoperformanyWorkhereundershallfullycomplywiththeinsuranceprovisions containedinparagraph24. 25.MEDIATION/VENUE Thepartiesagreethatshouldanydisputearisebetweenthemregardingthe termsorperformanceofthisAgreement,bothpartieswillparticipateinmediation.Thepartiesagree toequallysharethecostofthemediator.Shouldthepartiesfailtoresolvetheirdifferencesthrough mediation,thenanycauseofactionfiledhereundershallbefiledintheCircuitorCountyCourtfor SeminoleCounty,Florida. 26.GOVERNINGLAW&VENUE ThisAgreementismadeandshallbeinterpreted,construed,governed, andenforcedinaccordancewiththelawsoftheStateofFlorida.Venueforanystateactionor litigationshallbeSeminoleCounty,Florida.VenueforanyfederalactionorlitigationshallbeOrlando, Florida. 27.!hwb9—͸{FEES ShouldeitherpartybringanactiontoenforceanyofthetermsofthisAgreement, theprevailingpartyshallbeentitled,totheextentpermittedbylaw,torecoverfromthenon prevailingpartythecostsandexpensesofsuchactionincluding,butnotlimitedto,reasonable ğƷƷƚƩƓĻǤ͸ƭfees,whetheratsettlement,trialoronappeal. 28.NOTICES AnynoticeorapprovalunderthisContractshallbesent,postageprepaid,totheapplicable partyattheaddressshownonthefirstpageofthisContract. 29.WORKISAPRIVATEUNDERTAKING WithregardtoanyandallWorkperformedhereunder,itis specificallyunderstoodandagreedtobyandbetweenthepartiesheretothatthecontractual relationshipbetweentheOWNERandCONTRACTORissuchthattheCONTRACTORisanindependent contractorandnotanagentoftheOWNER.TheCONTRACTOR,itscontractors,partners,agents,and theiremployeesareindependentcontractorsandnotemployeesoftheOWNER.Nothinginthis Agreementshallbeinterpretedtoestablishanyrelationshipotherthanthatofanindependent contractor,betweentheOWNER,ononehand,andtheCONTRACTOR,itscontractors,partners, employees,oragents,duringoraftertheperformanceoftheWorkunderthisAgreement. 30.DOCUMENTSPublicRecords:Itisherebyspecificallyagreedthatanyrecord,document, computerizedinformationandprogram,audioorvideotape,photograph,orotherwritingofthe CONTRACTORanditsindependentcontractorsandassociatesrelated,directlyorindirectly,tothis Agreement,maybedeemedtobeaPublicRecordwhetherinthepossessionorcontrolofthe OWNERortheCONTRACTOR.Saidrecord,document,computerizedinformationandprogram,audio orvideotape,photograph,orotherwritingoftheCONTRACTORissubjecttotheprovisionsof Chapter119,FloridaStatutes,andmaynotbedestroyedwithoutthespecificwrittenapprovalofthe OWNER'sCityManager.UponrequestbytheOWNER,theCONTRACTORshallpromptlysupplycopies ofsaidpublicrecordstotheOWNER.Allbooks,cards,registers,receipts,documents,andother papersinconnectionwiththisAgreementshallatanyandallreasonabletimesduringthenormal workinghoursoftheCONTRACTORbeopenandfreelyexhibitedtotheOWNERforthepurposeof examinationand/oraudit. Page9 EastWRFPondLinerRepair TheCONTRACTORacknowledgesthattheOWNERisaFloridamunicipalcorporationandsubjectto theFloridaPublicRecordsLaw.CONTRACTORagreesthattotheextentanydocumentproducedby CONTRACTORunderthisAgreementconstitutesaPublicRecord;CONTRACTORshallcomplywiththe FloridaPublicRecordsLaw. 31.SOVEREIGNIMMUNITY NotwithstandinganyotherprovisionsetforthinthisAgreement, nothingcontainedinthisAgreementshallbeconstruedasawaiverofthe/L—͸{rightto sovereignimmunityunderSection768.28,orotherlimitationsimposedonthe/L—͸{potential liabilityunderstateorfederallaw.Assuch,theCITYshallnotbeliable,underthisAgreementfor punitivedamagesorinterestfortheperiodbeforejudgment.Further,theCITYshallnotbe liableforanyclaimorjudgment,orportionthereof,toanyonepersonformorethanone hundredthousanddollars($100,000.00),oranyclaimorjudgment,orportionthereof,which, whentotaledwithallotherclaimsorjudgmentspaidbytheStateoritsagenciesand subdivisionsarisingoutofthesameincidentoroccurrence,exceedsthesumoftwohundred thousanddollars($200,000.00). 32.HEADINGS Paragraphheadingsarefortheconvenienceofthepartiesonlyandarenottobe construedaspartofthisAgreement. 33.INTEGRATION;MODIFICATION Thedrafting,execution,anddeliveryofthisAgreementbythe Partieshasbeeninducedbynorepresentations,statements,warranties,oragreementsotherthan thoseexpressedherein.ThisAgreementembodiestheentireunderstandingoftheparties,andthere arenofurtherorotheragreementsorunderstandings,writtenororal,ineffectbetweentheparties relatingtothesubjectmatterhereofunlessexpresslyreferredtoherein.Modificationsofthis Agreementshallonlybemadeinwritingsignedbybothparties. 34.WAIVERANDELECTIONOFREMEDIES Waiverbyeitherpartyofanyterms,orprovisionofthis Agreementshallnotbeconsideredawaiverofthatterm,condition,orprovisioninthefuture.No waiver,consent,ormodificationofanyoftheprovisionsofthisAgreementshallbebindingunlessin writingandsignedbyadulyauthorizedrepresentativeofeachpartyhereto.ThisAgreementmaybe executedinanynumberofcounterparts,eachofwhichwhensoexecutedanddeliveredshallbe consideredanoriginalagreement;butsuchcounterpartsshalltogetherconstitutebutoneandthe sameinstrument. 35.DRAFTING OWNERandCONTRACTOReachrepresentthattheyhavebothsharedequallyindrafting thisAgreementandnopartyshallbefavoredordisfavoredregardingtheinterpretationofthis Agreementintheeventofadisputebetweentheparties. 36.NOTICE AnynoticesrequiredtobegivenbythetermsofthisAgreementshallbedeliveredbyhand ormailed,postageprepaidto: Page10 EastWRFPondLinerRepair ForCONTRACTOR: ForOWNER: CityofWinterSprings CityEngineer,PublicWorksDepartment 1126EastStateRoad434 WinterSprings,FL32708 Eitherpartymaychangethenoticeaddressbyprovidingtheotherpartywrittennoticeofthechange. Signed,SealedandDeliveredinthepresenceof: CONTRACTOR: WitnessName Title WitnessBusinessAddress City,StateZip Date OWNER: CITYOFWINTERSPRINGS WitnessBy:KevinL.Smith CityManager Witness1126EastStateRoad434 WinterSprings,FL.32708 4073271800