Loading...
HomeMy WebLinkAbout2013 03 25 Consent 200 CDBG - North Village Sidewalks ProjectCOMMISSION AGENDA ITEM 200 March 25, 2013 Regular Meeting Informational Consent X Public Hearings Regular KS KL City Manager Department REQUEST: The Public Works Department requesting authorization to enter into a contract agreement with CM Engineering Services Florida, PLLC for construction of the North Village Walk Sidewalk Improvements (ITB #001/13/BF) in the amount of $239,145.89 plus a contingency of $10,854.11, for a total authorization of $250,000. SYNOPSIS: The North Village Walk Sidewalk Improvements Project consists of the installation of approximately two miles of new 5 -foot wide sidewalks along existing City streets generally located north of S.R. 434, east of Sheoah Blvd., and west of Moss Road. The construction is funded entirely by a Community Development Block Grant administered through Seminole County. This agenda item is for the award of the construction contract to CM Engineering Services. Construction is expected to begin in April and be complete in July. CONSIDERATIONS: The North Village Walk Sidewalk Improvements consists of the installation of approximately two miles of new 5 -foot wide sidewalks along existing City streets generally located north of S.R. 434, east of Sheoah Blvd., and west of Moss Road (see Exhibit A for the project map). At the January 14, 2013 City Commission meeting, the Commission approved entering into an agreement with Seminole County for Community Development Block Grant (CDBG) funding of up to $250,000 for construction of the North Village Walk Sidewalk Improvements. The Seminole County Board of County Commissioners approved the Consent 200 PAGE 1 OF 4 - March 25, 2013 agreement at their February 26, 2013 meeting. The North Village Walk Sidewalk Project is in the 5 -year Capital Improvements Plan (CIP) that was adopted by the City Commission at the September 24, 2012 City Commission meeting. At the February 28, 2011 City Commission meeting, Staff informed the Commission (Informational Agenda Item #103) of the intent to apply for a Community Development Block Grant (CDBG) for the North Village Walk Sidewalk Project. The project location is within Census Tract 214.01 Block Group 2, which is eligible for CDBG funding. In addition to being in the approved CIP, the project was recommended by the Bicycle and Pedestrian Advisory Committee (BPAC) in February 2011 as a high priority project in BPAC's adopted Inventory of Sidewalk Gaps with Priority Project Ranking. In March 2011, the Planning and Zoning Board adopted a City -wide Pedestrian Plan which included the North Village Walk Sidewalk Project as priority #1B, with #1A being a sidewalk project in the Winter Springs Town Center. The North Village Walk Sidewalk Project is also on the current Metroplan Orlando Prioritized Project List for Bicycle and Pedestrian Projects. The project divides the new sidewalks into three priority areas, with the first priority area (Base Bid) being the installation of sidewalks along one side of the streets that currently have no sidewalks (see Exhibit A). These streets include: • North Cortez Avenue • North 1st Street (north side) • Algiers Avenue • North 1st Court • North 2nd Street • North Devon Avenue • North Fairfax Avenue • North 3rd Street from Edgemon to Fairfax The second priority (Alternate Bid Item #1) is the installation of new sidewalks along Moss Road, a collector road, to provide sidewalks on both sides where there is currently a sidewalk only on one side. The third priority (Alternate Bid Item #2) is the installation of sidewalks along the south side of 1st Street to provide sidewalks along both sides of this east -west corridor. Based on the bid prices of the lowest bidder, CM Engineering Services, Staff is recommending awarding a contract for the completion of all three priority areas in the total amount of $239,145.89, which is below the total CDBG construction grant amount of $250,000. A Public Meeting was conducted on February 4, 2013 at City Hall. All property owners in the immediate vicinity of the project (including all abutting properties) were mailed a meeting notice. The purpose of the meeting was to introduce the project, collect input, answer questions, and establish lines of communication. The presentation from the Public Meeting is posted on the City's website, along with a project informational flyer. Written construction notices will be issued to all residents in the construction areas approximately one week before construction is scheduled to begin, and regular project updates will be posted on the City website. The North Village Walk Sidewalk Improvements project was advertised for bidding Consent 200 PAGE 2 OF 4 - March 25, 2013 on February 17, 2013 (see Exhibit B). Bids were received and publicly opened on March 14, 2013 with results as follows: Invitation to Bid #001 /13 /BF Bid Results: Bidder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. CM Engineering Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2. Sparks Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. AJC Construction ......................................................................................................................................... ............................... 4. LAS Contracting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5. Triple Crown Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6. Stage Door II ......................................................................................................................................... ............................... 7. MVB & Associates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8. APEC Total Bid Amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $239,145.89 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $311,275.26 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $318,246.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $327,868.50 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $348,000.50 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $351,798.30 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $384,239.50 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $428,463.00 A copy of the complete Bid Tabulation is attached as Exhibit C. Staffs estimated cost of construction was $250,000. Staff met with the president of CM Engineering Services on March 14, 2013 to review several items related to the bid, including the proposed schedule, available manpower and equipment, approach to the project, and recent experience with similar projects. Based on Staffs review of CM Engineering Services' bid and follow -up research, Staff is recommending award of this construction contract to CM Engineering Services. Construction is expected to begin in early April 2013 and be completed in July 2013. FISCAL IMPACT: The project cost is $239,145.89 plus a contingency in the amount of $10,854.11, for a total of $250,000, funded by a Community Development Block Grant (CDBG) with Seminole County. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations /Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. Written construction notices will be issued to all residents in the affected construction areas Consent 200 PAGE 3 OF 4 - March 25, 2013 approximately one week before construction is scheduled to begin. RECOMMENDATION: Staff recommends the City Commission approve the award of the North Village Walk Sidewalk Improvements project to the low bidder, CM Engineering Services, in the amount of $239,145.89 plus a $10,854.11 contingency, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1. Exhibit A - Project Map (1 page) 2. Exhibit B - Legal Advertisement (1 page) 3. Exhibit C - Bid Tabulation (1 page) Consent 200 PAGE 4 OF 4 - March 25, 2013 EXHIBIT A Proposed Sidewalk Map Proposed Sidewalk One Side - Priority 1 (6,916 LF) Proposed Sidewalk Second Side - Priority 2 (1,640 LF) Proposed Sidewalk Second Side - Priority 3 (1,153 LF) Existing Sidewalk on One or Both Sides 0 150 300 600 900 1,200 Feet EXHIBIT B Orlando Sentinel City Of Winter Springs 1126 E STATE ROAD 434 WINTER SPRINGS, FL 32708-2715 Before the undersigned authority personally appeared Pam L. Davis/Tamela Vargas/Deborah M. Toney, who on oath says that s/he is the Legal Advertising Representative of Orlando Sentinel, a daily newspaper published in Seminole County, Florida; that the attached copy of advertisement, being a Advertisement for Bid in the matter of Bid No. ITB 001/13/BF in the Seminole County , was published in said newspaper in the issue(s); of 02/17/13 Affiant further says that the said Orlando Sentinel is a newspaper published in said Seminole County, Florida, and that the said newspaper has heretofore been continuously published in said Seminole County, Florida, each week day and has been entered as second-class mail matter at the post office in said Seminole County, Florida, for a period of one year next preceding the first publication of the attached copy of advertisement; and affiant further says that s/he has neither paid nor promised any person, firm or corporation any discount, rebate, commission or refund for the purpose of securing this advertisement for publication in the said newspaper. foregoing was acknowledged before me this day of February, 2013, • Pam L. Davis/Tamela Vargas/Deborah M. Toney, who is personally known to me and who did take an oath. 1224688 t,lcDTAF,',Y PUBUQ. OF FLOPa-V: INVITATION TO BID Bid Proposals. are hereby solicited by the City NaliTVIIIH1ftltriallfilksAlr°ii11111111174.11( IMPROVEMENTS Bid No. ITB 001/13/BF Sealed Bids must be received by March 14, 2013 at 10:00 A.M. at the City of Winter Springs, City Hall, 1126 East S.R. 434,-Wintet Springs, FL 32708 The Bidding Documents may be down- loaded in pdf format from the City's website at the following link: http://www.winterseringsfl.org/EN/ webigov/bids_purcliasing.htm This construction project consists of the installation of approximately 10,000 LF, of new 5-foot wide sidewalks in the North Village',Walk- area -of-Winter Springs, north of S.R. 434+between She- oah Blvd and Moss Road. Work in- cludes clearing, grading, sidewalk con- struction, curb ramps, concrete drive- . way aprons, and restoration,. The esti mated total construction cost is $250;000. -A mandatory pre-bid meeting will be held on March 5, 2013 at 10:00 AM at the City of Winter Springs, 1126 East S.R. 434, Winter Springs, FL 32708, _Contractors must have a representa- tive at the pre-bid meeting to be eligi ble to bid the project. All questions regordind the bid should be directed to Brian Fields, P.E., City Engineer, at 407:327;7597 or by e-mail to bfields@vvinterspringsfl.org. . * ' EXHIBIT C BID TABULATION TOTAL (BASE BID PLUS ALTERNATE 1 AND ALTERNATE 2): $239,145.89 $311,275.26 $318,246.00 $327,868.50 $348,000.50 $351,798.30 $384,239.50 $428,463.00 CM Engineering Services Inc. Sparks Concrete AJC Construction LAS Contracting Triple Crown Construction Stage Door II MVB and Associates APEC Pay Item Description Unit Unit Price Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Base Bid 1 Mobilization LS 1 $9,000.00 $9,000.00 $1,200.00 $1,200.00 $9,238.00 $9,238.00 $11,000.00 $11,000.00 $1,000.00 $1,000.00 $5,000.00 $5,000.00 $10,397.00 $10,397.00 $23,650.00 $23,650.00 2 Erosion Control LS 1 $800.00 $800.00 $1,000.00 $1,000.00 $2,400.00 $2,400.00 $2,500.00 $2,500.00 $4,000.00 $4,000.00 $5,000.00 $5,000.00 $2,431.00 $2,431.00 $5,000.00 $5,000.00 3 Clearing and Grubbing LS 1 $7,500.00 $7,500.00 $1,200.00 $1,200.00 $6,000.00 $6,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $1,186.00 $1,186.00 $25,000.00 $25,000.00 4 Earthwork LS 1 $6,300.00 $6,300.00 $1,150.00 $1,150.00 $6,000.00 $6,000.00 $12,000.00 $12,000.00 $21,075.00 $21,075.00 $5,000.00 $5,000.00 $47,203.00 $47,203.00 $25,000.00 $25,000.00 5 Concrete Sidewalk - 5 -feet wide, 4- inches thick SY 4215 $21.50 $90,622.50 $27.42 $115,575.30 $27.00 $113,805.00 $27.50 $115,912.50 $24.00 $101,160.00 $31.00 $130,665.00 $28.50 $120,127.50 $29.00 $122,235.00 6 6" Thick Concrete Sidewalk and Driveway Aprons SY 1254 $26.00 $32,604.00 $28.00 $35,112.00 $30.00 $37,620.00 $33.00 $41,382.00 $28.50 $35,739.00 $34.00 $42,636.00 $35.50 $44,517.00 $35.00 $43,890.00 7 Replacement of Miami Curb at Sidewalk Connections EA 44 $20.00 $880.00 $40.00 $1,760.00 $120.00 $5,280.00 $250.00 $11,000.00 $630.00 $27,720.00 $400.00 $17,600.00 $231.00 $10,164.00 $30.00 $1,320.00 8 ADA Mats at Curb Ramps EA 50 $200.00 $10,000.00 $950.00 $47,500.00 $396.00 $19,800.00 $250.00 $12,500.00 $250.00 $12,500.00 $350.00 $17,500.00 $297.00 $14,850.00 $750.00 $37,500.00 9 12" White Thermoplastic Crosswalk Striping: 6' lines at 3' o.c. LF 1135 $2.09 $2,372.15 $3.00 $3,405.00 $2.00 $2,270.00 $4.00 $4,540.00 $4.00 $4,540.00 $2.10 $2,383.50 $14.50 $16,457.50 $4.00 $4,540.00 10 24" White Thermoplastic Striping - Stop Bars LF 152 $5.34 $811.68 $16.00 $2,432.00 $6.00 $912.00 $7.00 $1,064.00 $10.00 $1,520.00 $5.50 $836.00 $18.00 $2,736.00 $8.00 $1,216.00 11 Tree Removal EA 2 $200.00 $400.00 $200.00 $400.00 $1,500.00 $3,000.00 $400.00 $800.00 $800.00 $1,600.00 $1,500.00 $3,000.00 $1,190.00 $2,380.00 $150.00 $300.00 12A Bahia Sod SY 6210 $1.50 $9,315.00 $2.50 $15,525.00 $3.50 $21,735.00 $3.00 $18,630.00 $3.25 $20,182.50 $2.50 $15,525.00 $2.15 $13,351.50 $3.00 $18,630.00 12B St. Augustine Sod SY 200 $2.32 $464.00 $4.00 $800.00 $4.00 $800.00 $4.50 $900.00 $4.25 $850.00 $3.00 $600.00 $5.00 $1,000.00 $7.00 $1,400.00 13 Install Pedestrian Warning Signs EA 20 $226.00 $4,520.00 $65.00 $1,300.00 $300.00 $6,000.00 $275.00 $5,500.00 $250.00 $5,000.00 $250.00 $5,000.00 $145.00 $2,900.00 $250.00 $5,000.00 14 Relocate Sign Post EA 2 $75.00 $150.00 $50.00 $100.00 $120.00 $240.00 $100.00 $200.00 $300.00 $600.00 $100.00 $200.00 $180.00 $360.00 $110.00 $220.00 15 Install Miami Curb - Bombay Ave at 1st St LF 75 $28.00 $2,100.00 $25.00 $1,875.00 $24.00 $1,800.00 $18.00 $1,350.00 $20.00 $1,500.00 $20.00 $1,500.00 $24.00 $1,800.00 $18.00 $1,350.00 16 Testing Allowance LS 1 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 1 $319,251.001 TOTAL BASE BID (Subtotal Items 1 -16): 1 $180,839.33 1 $233,334.30 1 $239,900.00 1 $247,278.50 1 $251,986.50 1 $265,445.50 1 $294,860.50 Alternate Bid #1 (North Moss Road - Fill Gaps on West Side) 17 Erosion Control LS 1 $300.00 $300.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $500.00 $500.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $490.00 $490.00 $5,000.00 $5,000.00 18 Clearing and Grubbing LS 1 $3,000.00 $3,000.00 $975.00 $975.00 $1,200.00 $1,200.00 $1,500.00 $1,500.00 $3,500.00 $3,500.00 $2,000.00 $2,000.00 $240.00 $240.00 $5,000.00 $5,000.00 19 Earthwork LS 1 $1,800.00 $1,800.00 $950.00 $950.00 $1,800.00 $1,800.00 $3,000.00 $3,000.00 $6,200.00 $6,200.00 $2,000.00 $2,000.00 $9,450.00 $9,450.00 $5,000.00 $5,000.00 20 Concrete Sidewalk - 5 -feet wide, 4- inches thick SY 869 $21.50 $18,683.50 $27.42 $23,827.98 $27.00 $23,463.00 $29.00 $25,201.00 $24.00 $20,856.00 $31.00 $26,939.00 $28.50 $24,766.50 $29.00 $25,201.00 21 6" Thick Concrete Sidewalk and Driveway Aprons SY 245 $26.00 $6,370.00 $28.00 $6,860.00 $30.00 $7,350.00 $34.00 $8,330.00 $30.00 $7,350.00 $34.00 $8,330.00 $35.50 $8,697.50 $40.00 $9,800.00 22 12" White Thermoplastic Crosswalk Striping: 6' lines at 3' o.c. LF 108 $2.09 $225.72 $3.00 $324.00 $2.00 $216.00 $5.00 $540.00 $4.00 $432.00 $2.10 $226.80 $14.50 $1,566.00 $5.00 $540.00 23 24" White Thermoplastic Striping - Stop Bars LF 26 $5.34 $138.84 $16.00 $416.00 $7.00 $182.00 $8.00 $208.00 $10.00 $260.00 $5.50 $143.00 $18.00 $468.00 $10.00 $260.00 24 ADA Mats at Curb Ramps EA 6 $200.00 $1,200.00 $950.00 $5,700.00 $432.00 $2,592.00 $275.00 $1,650.00 $250.00 $1,500.00 $350.00 $2,100.00 $297.00 $1,782.00 $750.00 $4,500.00 25A Bahia Sod SY 1000 $1.50 $1,500.00 $2.50 $2,500.00 $4.00 $4,000.00 $3.00 $3,000.00 $4.50 $4,500.00 $2.50 $2,500.00 $2.15 $2,150.00 $3.00 $3,000.00 25B St. Augustine Sod SY 500 $2.32 $1,160.00 $4.00 $2,000.00 $4.00 $2,000.00 $4.50 $2,250.00 $5.00 $2,500.00 $3.00 $1,500.00 $5.00 $2,500.00 $7.00 $3,500.00 TOTAL ALTERNATE BID #1 (Subtotal Items 17 -25): 1 $34,378.06 I 1 $44,552.98 I 1 $44,003.00 I 1 $46,179.00 I 1 $49,098.00 I 1 $47,738.80 I 1 $52,110.00 I 1 $61,801.00 I Alternate Bid #2 (1st Street, Fill Gaps on South Side) 26 Erosion Control LS 1 $200.00 $200.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $400.00 $400.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $390.00 $390.00 $5,000.00 $5,000.00 27 Clearing and Grubbing LS 1 $1,400.00 $1,400.00 $975.00 $975.00 $1,200.00 $1,200.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00 $2,000.00 $2,000.00 $190.00 $190.00 $5,000.00 $5,000.00 28 Earthwork LS 1 $1,160.00 $1,160.00 $950.00 $950.00 $1,800.00 $1,800.00 $2,500.00 $2,500.00 $7,000.00 $7,000.00 $2,000.00 $2,000.00 $7,510.00 $7,510.00 $5,000.00 $5,000.00 29 Concrete Sidewalk - 5 -feet wide, 4- inches thick SY 869 $21.50 $18,683.50 $27.42 $23,827.98 $27.00 $23,463.00 $29.00 $25,201.00 $29.00 $25,201.00 $31.00 $26,939.00 $28.50 $24,766.50 $29.00 $25,201.00 30 Replacement of Miami Curb at Sidewalk Connections EA 4 $20.00 $80.00 $40.00 $160.00 $120.00 $480.00 $250.00 $1,000.00 $800.00 $3,200.00 $400.00 $1,600.00 $231.00 $924.00 $250.00 $1,000.00 31 ADA Mats at Curb Ramps EA 4 $200.00 $800.00 $950.00 $3,800.00 $480.00 $1,920.00 $275.00 $1,100.00 $300.00 $1,200.00 $350.00 $1,400.00 $297.00 $1,188.00 $750.00 $3,000.00 32 Bahia Sod SY 1070 $1.50 $1,605.00 $2.50 $2,675.00 $4.00 $4,280.00 $3.00 $3,210.00 $4.50 $4,815.00 $2.50 $2,675.00 $2.15 $2,300.50 $3.00 $3,210.00 TOTAL ALTERNATE BID #2 (Subtotal Items 26 -32): 1 $23,928.50 I 1 $33,387.98 I 1 $34,343.00 I 1 $34,411.00 I 1 $46,916.00 I 1 $38,614.00 I 1 $37,269.00 I 1 $47,411.00 I TOTAL (BASE BID PLUS ALTERNATE 1 AND ALTERNATE 2): $239,145.89 $311,275.26 $318,246.00 $327,868.50 $348,000.50 $351,798.30 $384,239.50 $428,463.00