HomeMy WebLinkAbout2012 01 23 Consent 202 CPH East Force Main Design COMMISSION AGENDA     Informational Consent X ITEM202 Public Hearings Regular       January 23, 2012KSKL Regular MeetingCity ManagerDepartment         REQUEST: The Utility Department requests the City Commission approve Task Order #4 to the Engineering Agreement with CPH Engineers, Inc. to provide professional engineering services for force main improvements to the East wastewater collection system in the amount of $68,230.   SYNOPSIS: This agenda item is for the design and permitting services necessary to construct 7,200 feet of new wastewater force main needed to improve operational capabilities and provide for future growth in the Greeneway Interchange District. CONSIDERATIONS: Wastewater is conveyed to the wastewater treatment through a combination of gravity sewer mains, pump stations and force mains.  Force mains are the pressurized wastewater piping systems from the pump stations to a discharge point.  This can be another pump station, gravity sewer main or ultimately the wastewater treatment plant.  The capacity of a force main is much greater than the same sized gravity main. The East wastewater collection system was not sized to provide sufficient wastewater conveyance capacity for future growth in the northeast service area being mostly comprised of the Greenway Interchange District.  In addition, there is a confluence of force mains that discharge to a gravity main on Vistawilla Drive which can create operational challenges if flows are elevated. This project would provide for a new force main from the Vistawilla Drive and Seneca Boulevard area to the East Water Reclamation Facility as shown in the attachment.  A 2nd phase will be proposed in the future to extend the line to SR 434.  this can be done Consent 202 PAGE 1 OF 2 - January 23, 2012 when the development plans are more than conceptual.  In addition, this same route is planned for a reclaimed water distribution main which will be included in the design and permitting to avoid duplication of the surveying costs in the future.        FISCAL IMPACT: The engineering design and permitting fee is $68,230 which is budgeted in the Utility 2000 Construction fund (3640-65000-30151). COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City’s Website, LaserFiche, and the City’s Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City’s Website, LaserFiche, and the City’s Server; has been sent to applicable City Staff, eAlert/eCitizen Recipients, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner’s Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals.   RECOMMENDATION: Staff recommends that the City Commission approve Task Order #4 to the Engineering Services Agreement with CPH Engineers, Inc. in the amount of $68,230 funded from the Utility 2000 Construction Fund (#3640-65000-30151) and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1.Project Location Map (1 page) 2.CPH Engineering, Inc. Task 4 Proposal (12 pages) Consent 202 PAGE 2 OF 2 - January 23, 2012 14E 104 ÿ LIFT ÿ EAGLES 107 ÿ STA. 103 ÿ 13E 108 ÿ HOWELL CREEK RESERVE ÿ 109 106 112 ELECTRONIC 105 ÿ ÿ WATCH GATE 110 ÿ ÿ 111 ÿ 112 113 PHASE 2 107 ÿÿ 109 110 108 PHASE 1 670 671 Î 672 1711 1709 TUSCAWILLA 1713 1707 671 677 675 672 687 ÿ 688 679 681 683 685 1705 687 675675 674 ÿ 689 ÿ UNIT 11 691 ÿ 689 ÿ ÿ 690 1712674 ÿ ÿ 679 ÿ 1703 676 1704 680 ÿ 684 679 693 ÿ ÿ 1714676 ÿ 691 692 692 1700 681 1716 ÿ 681 695 693 694 1721 683 1718 696 ÿ 697 ÿ 685 695 683 696 682 ÿ 684 1720 687 ÿÿ 684 695 697 699 693 689 1722 1520 698 686 697 1725 ÿ ÿ 691 694 699688 ÿ 1724 ÿ ÿ 696 699 1727 693 690 ÿ 1726 ELECTRONIC 698 695 ÿ GATE 692 1728 ÿ 1501697 694 1503 1730 779 ÿ 777 699 1505 ÿ 696 775 1502 1507 ÿÿ 1504 698 778 773 1506 776 ÿ 695 ÿ ÿ 1508 771 772 711 ÿ 696 ÿ 769 712 770 ÿ 698 767 ÿ 715 768 ÿ ÿ 714 765 1513 719 ÿ 721763 716 1606 ÿÿ 1604 718 1605 ÿ 720 761 760 722 ÿ 1602 752 ÿ 750 759 1603 748 7241601 ÿ ÿ ÿ 757 746751 753 ÿ LIFT 755 1606 1600 749 STA. 1604 6E 744 747 ÿ 1607 ÿ ÿ 1602 742 ÿ 745 1605 740 738 736 1603 1621 1619 ÿ 743 1601 ÿ 1623 ÿ 741 1617 ÿ 739 737 735 733 1625 1615 1622 1627 1613 1624 1635 1629 1637 1633 1612 1606 1434 1626 1608 1436 1604 1639 1611 ÿ 1602 1628 ÿ 1432 1610 1438 1640 ÿ 1440 16341607 ÿ 1632 1609 1641 1442 ÿ 741 14351444 1630 742 ÿ 1603 1608 1605 14461601 1437 1448 743 1642 1643 1607 1439 1441 ÿ 744 1606 ÿ 1443 1564 1445 745 1566 1605 1568 1447 ÿ 1570 1604 1449 1572 1574 1603 1563 17071565 1705 1578 1706 1567 1602 1580 1569 1703 ÿ ÿ 1571 1602 1546 1548 1704 1604 1573 1704 ÿ 1606 ÿ 1577 1703 ÿ 1550 1608 17051579 1610 1581 1704 ÿ 1612 1543 ÿ 1706 1702 1583 1555 ÿ ÿ 1705 1587 1601 1705 1707 1707 1545 1603 1706 1706 ÿ 1613 1605 1708 ÿ 1607 1547 1549 1707 1609 1704 1703 1707 1551 ÿ 1611 1708 1708 1553 ÿ ÿ 1555 1596 1702 1557 1705 1701 1597 1706 ÿ ÿ 1559 ÿ 1561 1700 1563 1703 1594 1704 ÿ 1565 1595 ÿ 1567 ÿ 1702 1701 15601569 1592 1602 1593 1571 1604 ÿ 1700 1606 1562 1573 1590 ÿ 1608 SAM 1591 ÿ 1610 1575 SMITH 1588 1577 PARK 1612 1589 989 ÿ ÿ 1656 988 1579 ÿ 1658 1587 1615 1581 1654 ÿ 9911614 1660 ÿ 990 1662 1585 1583 ÿ ÿ ÿ 1664993 1652 1617 ÿ 1618 992 1651 1666 WATER 995 1663 1619 1650 994 RECLAMATION 1668 ÿ ÿ 1649 1665 FACILITY 1602 1670 1600 1621 ÿ 1648 ÿ 996 1667 1604 1672 1647 ÿ ÿ 1669 1623 1601 1670 1646 1607 1674 1603 1672 ÿ 1671 1605 1625 ÿ ÿ ÿ 1674 16761624 1644 1673 1643 1627 1676 ÿ ÿ 1678 1626 1673 1675 1642 1678 1641 1629 ÿ 1680 1675 ÿ 1608 ÿ 1677 ÿ 1606 ÿ 1610 1680 1640 1604 1631 1679 A, , t' �-' ", "1 0 1 t I UU, 10� d 1.1 This Task Order dated ', 2012, by and between the City of Winter Springs (hereinafter called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Task Order based on Agreement for Engineering Services dated September 10, 2008 — RFQ 008/08113F. The appropriate provisions of the Agreement apply as fully as if repeated herein. 2.1.1 The ENGINEER agrees to perform professional services in connection with the project as hereinafter stated. f cl:lilLlo forcemain system. The streets and the estimated lengths of forcemain for the associated streets included in this proposal are as follows: 3.2 Gather and review available data #»°«e existing area. Perform site t to evaluate existing conditions, general utility locations and identify possible line routing in the ROW. Prepare preliminary engineering design for use at City meetings and with the review agencies in accordance with typical engineering guidelines. 302 #sift\ §-Z � 0 re =00 fl U-1 110 f # < 42 10 13 to 10 4 a [No > « # a I a A 4 a Intersection and sped© crossing details (3 sheets) Sanitary and Reclaim System Miscellaneous\ ?d=rd Details sheets) crossing information 3.5 Since the area is already developed, we will not retain the services of a geotechnical • ti per r direction of R ., EM 5.1 9NY.F4 The ENGINEER agrees to prosecute the work in a timely manner until the- Project is completed. The following is our agreed upon schedule: L 1.1 tot I M z Payments for services and expenses of the ENGINEER to be as set forth below: The fee for the engineering design scope • services described herein will be provided for a lump sum fee of $ 71,755.00 inclusive of expenses, for the base services, as shown on the attached manpower breakdown. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day and year first above written. MNER: City of Winter &3rilTas, Florida ATTEST 0 Date: 110f L 1,211 7n FA M Sr. Vice President Date: ------------- Winter Springs Proposal :1 to] r-11 N a] I. I IN 36 A See supporting documentation for breakdown of miscellaneous expenses Project Manager Professional Engineer Senior Cadd Tech Clerical I I Total Raw Labor Cost T L LABOR COS Misc. Expenses 70TAL TASK I RATE HOURS $155.00 $125.00 $80.00 $55.00 16 $2,480.00 45 $5,62500 36 $2,880.00 8 $440.00 is"Mm Senior Professional Senior Task 1 Task Cescri tion Princi al En ineer CAM D Tech Clerical 11 _ 1 initial m eetin to collect available data° 2' 1 2 Review existing dafia for the project area (water, sewer, etco} 1 21 3 ; Perform site visit to evaluate existing conditions, review utility locations and identify potential conflict situations 2 2 'Evaluate flow and demand requirements for determination of 4 required size for the proposed reclaimed water transmission --- main 8' 24 8 2 5 ; Prepare 30% drawings and layout (11 drawings with cover sheet) 4: 10 22; 2 6 Submit 30% plan sets to City for review (Hard Copies and pdf �files) 1 2� 1 7 Meet with staff to review - 21-- 8 'Prepare written list d an d actions comments 3 +._. -._ I :1 to] r-11 N a] I. I IN 36 A See supporting documentation for breakdown of miscellaneous expenses Project Manager Professional Engineer Senior Cadd Tech Clerical I I Total Raw Labor Cost T L LABOR COS Misc. Expenses 70TAL TASK I RATE HOURS $155.00 $125.00 $80.00 $55.00 16 $2,480.00 45 $5,62500 36 $2,880.00 8 $440.00 is"Mm Winter Spri gs Proposal 'East Side 16 Inch Force Main & Reclaimed Main SUBTOTAL DIRECT LABOR HOURS 8 2 4 2 $13,421.00 TOTAL LABOR COST $1,720.00 Sub Consultant $13,421.00 Misc. Expenses $2.50 $16, 143.50 3. TOTAL TASK 2 $16, 50 �r ' " E RATE HOURS Environmental Science Manager $130.00 8 $1,040.00 Professional Engineer $125.00 2 $250.00 Senior Cadd Tech $80.00 4 $320.00 Clerical 11 $55.00 2 $110.00 Total Raw Labor Cost $1,720.00 �r ' " E Winter Springs Proposal Project Senior -nqlneer Deslan Tech Clerica 69Jll 1 -1 to] W a Q I V*Q I See supporting documentation for breakdown of miscellaneous expenses I "TOTAL LABOR COST Misc. Expenses $57.501" ]TOTAL TASK 3 Preparation of Construction Documents Final Design 'Prepare HOURS Project Manager $155.00 90% dravyings and specifications $6,510.00 Professional Engineer $125.00 120 a! Coversheet Senior Cadd Tech 3: 8! $17,120.00 L6eaiionlkey Map and General Notes 1 6 8 i Total Labor Cost - cl Double Plan sheets (6 anticipated at 1' °=20° scale} $39,510.00 Page T-3 d: Intersection and Specific Crossing Details (3 sheets) 4 12!i e Standard Sanitary Details sheet) 2� 2i f Provide quality assurance and "Constructibility" review g: Prepare technical s pecific at ion s 14i 8 Prepare preliminary opinion of probable construction cost categorized h, by subdivision or phasing J! 81 4 1 Submit electronic sets of the 90% P&S to City for review. Submittal i i package will include plans, specifications and probable opinion of construction cost j i Meet with City staff to review 3 3 Prepare and s ubmit Comment and res pon se list segrega t ad by plan k sheet page 1 4: 2 I Revise d ocuments per 90% review (see 66(6%w) Prepa re 6 1 Drawings and specifications _..re.__ 8! 28� 64' 2 3 Provide quality assurance and TonstructIbllIt--'r'e'-V- 4 pare a signed and sealed Engin�ost ----- ------ 6 :1 4 [ 5 ; Submit electonic sets of 100% construction drawings, technical specifications and probable opinion of construction cost to the City 1 21 69Jll 1 -1 to] W a Q I V*Q I See supporting documentation for breakdown of miscellaneous expenses I "TOTAL LABOR COST Misc. Expenses $57.501" ]TOTAL TASK 3 RATE HOURS Project Manager $155.00 42 $6,510.00 Professional Engineer $125.00 120 $15,000.00 Senior Cadd Tech $80.00 214 $17,120.00 Clerical 11 $55.00 16 $880.00 Total Labor Cost $39,510.00 Page T-3 ; -A92 Project Manager $155.00 2 $310.00 Project Engineer $125.00 6 $750.00 Senior Cadd Tech $80.00 3 $240.00 Clerical 11 $55.00 4 $220.00 Subtotal Raw Labor $1,520.00 Page T -4 Winter Springs Proposal See supporting documentation for breakdown of miscellaneous expenses Project Manager Project Engineer Senior Cadd Tech Clerical II Subtotal Raw Labor SUBTOT LABOR $2,010.00 Subconsultant $0.00 Misc. Expenses $615.00 TOTALT $3,525.00 RATE Project Project Sr. Cadd 7 $1,085.00 Task 6 Task Description Manager Engineer Tech Clerical Subconsultant $55.00 B idding ss istance 6.1 Furnish 15 sets of drawings, CD's and technical specs . ;for bidding purposes ? 3 ..._. 3. 2 6.2 Attend pre -bid conference 3 2: 6.3 Consider written questions and prepare addenda as _ relate to water main design. _ 1 4 2 2' Review and evaluate the three (3) lowest bid packages -- 604 and verify bidder's experience and references and make a recommendation of award to the City - _ _...._- 4 SUBTOTAL DIRECT LABOR 7 7 5 10 $0.00 See supporting documentation for breakdown of miscellaneous expenses Project Manager Project Engineer Senior Cadd Tech Clerical II Subtotal Raw Labor SUBTOT LABOR $2,010.00 Subconsultant $0.00 Misc. Expenses $615.00 TOTALT $3,525.00 RATE $155.00 7 $1,085.00 $125.00 7 $875.00 $80.00 5 $400.00 $55.00 10 $550.00 R �', FKfatlo" N 10 ATEM DESCRIPTION TASK 3 TASK 4 0.05lSheet V 150' $7.50' 75 375.00 .20 20 $4.0011" 1.25) heet 20i $25.No" 25.00,,! 1501 87.50 0.00:EaGh i io . 001 igital Camera Uo 1 $10.00 J iskette $3.50 • 5 1 iscellaneous fh Proposal Winter Springs TASK ORDER NUMBER 4 FOR EAST SIDE FORCEMAIN DESIGN This Task Order dated , 2012, by and between the City of Winter Springs (hereinafter called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Task Order based on Agreement for Engineering Services - dated September 10, 2008 — RFQ 008/08/BF. The appropriate provisions of the Agreement apply as fully as if repeated herein. SECTION 1 GENERAL 1.1 The purpose of this Amendment is to provide for Engineering Services, more specifically itemized herein, in the preparation of contract documents for a new 16 inch forcemain and a new reclaimed water main from the intersection of Seneca Blvd. and Vistawilla Drive to Northern Way; then east and south on Northern Way to Winter Springs Blvd.; then west on Winter Springs Blvd to the East WRF entrance and on into the WRF connecting to the surge tank. Provisions shall be provided to extend the forcemain to the north of Seneca Blvd. along Vistawilla Drive for future service capability of areas north of SR 434. The forcemain will provide for re- direction and connection of other lift stations and forcemains into the new system. SECTION 2 BASIC SERVICES OF THE ENGINEER 2.1 GENERAL 2.1.1 The ENGINEER agrees to perform professional services in connection with the project as hereinafter stated. 2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative in those phases of the project to which this Amendment applies, and will give consultation and advice to the OWNER during the performance of his services. The ENGINEER will perform the services for the City Commission under the general supervision of the City Manager and Public Works /Utilities Director and will submit interim plans and or reports to them for their review, input, decision, etc. as appropriate. SECTION 3 SCOPE OF SERVICES 3.1 GENERAL The OWNER hereby authorizes the ENGINEER to proceed with the preparation of the plans and specifications to enable a contractor to perform construction of both mains. We will provide engineering services for the design of a new sixteen inch forcemain system as well as a new reclaimed water main along Vistawilla Drive, Northern Way and Winter Springs Blvd. All new forcemains will be placed within the existing roadway Right of Way (ROW). The size of the new reclaimed water main will be determined as a part of this scope of services. The new forcemain e orcemain will be connected at various locations to the existing forcemain system. The streets and the estimated lengths of forcemain for the associated streets included in this proposal are as follows: • Vistawilla Drive ( 1,565 LF) • Northern Way ( 3,500 LF) • Winter Springs Blvd. ( 1,530 LF) • East WRF ( 560 LF) • Approximate total length 7,200 LF 3.2 Gather and review available data on the existing area. Perform site visit to evaluate existing conditions, general utility locations and identify possible line routing in the ROW. Prepare preliminary engineering design for use at City meetings and with the review agencies in accordance with typical engineering guidelines. 3.3 Based on preliminary engineering, determine the necessary reclaimed water main sizing and prepare 30% design layout/drawings and submit electronic files for review (Task 1). The 30% drawings will be in the half size format for submittal and review. Submittals will be in electronic .pdf format. Originals will be set up on 22 inch by 34 inch drawing paper size. This allows production of scalable half size drawings to be printed on 11 inch by 17 inch paper. Sheets to include the following: • Cover Sheet • General Notes Sheet/Key Sheet • Plan sheets (double plan format) 1 inch equals 20 foot scale (6 sheets). No profile view will be provided for the design drawings. • Intersection and specific crossing details (3 sheets) • Sanitary and Reclaim System Miscellaneous Standard Details (2 sheets) 3.4 Perform topographic survey of the proposed force main corridor approximately 7,200 LF starting approximately 150 feet north of the Seneca Blvd and Vistawilla Blvd intersection, then south along Vistawilla Blvd to Northern Way; then southeast along Northern Way to Winter Springs Blvd; then west along Winter Springs Blvd to the entrance to the East WRF; then south into the plant site to the headworks structure. The survey will provide the apparent ROW line and pick up pertinent features along the route for half (1/2) of the ROW. Existing underground utilities that have been flagged by the respective utility owners shall be located by the survey. In addition, the surveyor will also pick -up specific information on five gravity sanitary manholes, a portion of the Lift Station 6E site, the bear Creek crossing and bridge information and the culvert crossing information on Vistawilla. (Task 2). 3.5 Since the area is already developed, we will not retain the services of a geotechnical engineer per the direction of the OWNER. 3.6 CPH scientists shall need to perform a Wetland Delineation at the Bear Creek Crossing to provide documentation to the permitting agencies that the proposed force main construction will not encroach upon nor adversely impact the wetlands or creek. The approximate wetland limits shall be delineated in the field with flagging tape and /or stakes in accordance with methodologies outlined in the U.S. Army Corps of Engineers (ACOE) Wetland Delineation Manual (1987), the 2008 Corps Interim Regional Supplement to the Corps Wetland Delineation Manual: Atlantic & Gulf Coastal Plain Region and the Florida Unified Wetland Delineation Methodology (Chapter 62 -340, F.A.C.). The wetland delineation shall be performed on both sides of the creek and extended out approximately 20 feet on each side of the existing bridge structure. CPH scientists shall prepare a memorandum discussing the wetland delineation and coordinate with the project surveyor and /or engineer to provide wetland delineation information such as a map showing the approximate location of the delineated wetland line and flag numbers. Including the approximate coordinates of each delineation point as recorded by a Garmin handheld GPS unit. 3.7 CPH will obtain the services of a structural engineer to evaluate the existing bridge and pipe supports currently supporting the 6 -inch force main at the Bear Creek crossing for their suitability of supporting the proposed 16 -inch force main and the new reclaimed main. The support system will either be modified to accommodate the larger force main and the new reclaimed main or be replaced with a new support system. 3.8 Prepare 90% and 100% plans and specifications for the pipe improvements for bidding purposes (Task 3). The plans will be plan view only with no profile view. Specific intersection and critical crossing profiles will be provided in addition to the plan views. Submittals will be in electronic .pdf format. The 90% and 100% drawings will be in the half size format for submittal and review. Originals will be set up on 22 inch by 34 inch drawing paper size. This allows production of scalable half size drawings to be printed on 11 inch by 17 inch paper. 3.7 CPH will prepare and submit the required FDEP Wastewater Project related permit application and supporting documentation necessary to obtain required permit for construction and operation of the Project. Respond to all requests for additional information from permitting agencies. Pay fee for all permits. Winter Springs will reimburse fees paid by the Engineer. The reclaimed water main is within the City's existing service area and therefore is not required to be permitted. SECTION 4 SCHEDULE 4.1 The ENGINEER agrees to prosecute the work in a timely manner until the Project is completed. The following is our agreed upon schedule: NTP approximately January 24, 2012 Submit 30% plans — May 4, 2012 City review /comments — May 18, 2011 Revise plans to 90% - June 22, 2012 City 90% review process — July 9, 2012 Submit Final Plans — July 30, 2012 SECTION 5 PAYMENT 5.1 PAYMENT Payments for services and expenses of the ENGINEER to be as set forth below: The fee for the engineering design scope of services described herein will be provided for a lump sum fee of $ 71,755.00 inclusive of expenses, for the base services, as shown on the attached manpower breakdown. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day and year first above written. OWNER: City of Winter Springs, Florida By: ATT`.� Date: i/zs/ 2. ENGINEER: CPH En eer , n . A S : A ` 8►47;11M David E. Mahler, P. . Sr. Vice President Date: /—/1-11 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Senior Professional Senior Task 1 Task Description Principal Engineer CADD Tech Clerical II Preliminary Engineering 1 Conduct initial meeting to collect available data. 2 2 1 2 Review existing data for the project area (water, sewer, etc.) 1 2 3 Perform site visit to evaluate existing conditions, review utility locations and identify potential conflict situations 2 2 Evaluate flow and demand requirements for determination of 4 required size for the proposed reclaimed water transmission main 8 24 8 2 5 Prepare 30% drawings and layout (12 drawings with cover sheet) 4 10 22 2 6 Submit 30% plan sets to City for review (Hard Copies and pdf files) 1 2 1 7 Meet with staff to review 2 2 8 Prepare written list of comments and actions 3 2 SUBTOTAL DIRECT LABOR 16 45 36 8 See supporting documentation for breakdown of miscellaneous expenses TOTAL LABOR COST $11,425.00 Misc. Expenses $46.50 TOTAL TASK 1 $11,471.50 RATE HOURS Project Manager $155.00 16 $2,480.00 Professional Engineer $125.00 45 $5,625.00 Senior Cadd Tech $80.00 36 $2,880.00 Clerical II $55.00 8 $440.00 Total Raw Labor Cost $11,425.00 Page T -1 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Env Sc Project Senior Sub Task 2 Task Description Manager Engineer Cadd Tech Clerical consultant Survey, Environmental and Structural Topographic information of route of the project area. Use City maps /aerials for base. City to provide. CPH to 1 transfer, coordinate and set -up for the project. 1 2 1 $9,621.00 2 Wetland determination at Bear Creek 8 Structural evaluation and design for force main supports 3 on Bridge 1 2 1 $3,800.00 SUBTOTAL DIRECT LABOR HOURS 8 2 4 2 $13,421.00 TOTAL LABOR COST $1,720.00 Sub Consultant $13,421.00 Misc. Expenses $2.50 TOTAL TASK 2 $15,143.50 RATE HOURS Environmental Science Manager $130.00 8 $1,040.00 Professional Engineer $125.00 2 $250.00 Senior Cadd Tech $80.00 4 $320.00 Clerical II $55.00 2 $110.00 Total Raw Labor Cost $1,720.00 Page T -2 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main • Project Project Senior Task 3 Task Description Manager Engineer Design Tech Clerical Preparation of Construction Documents Final Design 1 Prepare 90% drawings and specifications a Cover sheet 1 3 8 b Location /Key Map and General Notes 1 6 8 c Double Plan sheets (6 anticipated at 1 " =20' scale) 8 32 96 d Intersection and Specific Crossing Details (3 sheets) 4 12 24 e Standard Sanitary Details (1 sheet) 2 2 f Provide quality assurance and "Constructibility" review 8 g Prepare technical specifications 2 14 8 Prepare preliminary opinion of probable construction cost categorized h by subdivision or phasing 1 8 4 1 Submit electronic sets of the 90% P &S to City for review. Submittal i package will include plans, specifications and probable opinion of construction cost 1 2 1 j Meet with City staff to review 3 3 k Prepare and submit Comment and response list segregated by plan sheet page 1 4 2 I Revise documents per 90% review (see below) 2 Prepare of 100% Drawings and specifications 8 28 64 2 3 Provide quality assurance and "Constructibility" review 4 4 Prepare a signed and sealed Engineers Cost Estimate 1 6 4 1 5 Submit electonic sets of 100% construction drawings, technical specifications and probable opinion of construction cost to the City 1 2 1 SUBTOTAL DIRECT LABOR 42 120 214 16 See supporting documentation for breakdown of miscellaneous expenses 'TOTAL LABOR COST $39,510.00 Misc. Expenses $57.50 TOTAL TASK 3 $39,567.50 RATE HOURS Project Manager $155.00 42 $6,510.00 Professional Engineer $125.00 120 $15,000.00 Senior Cadd Tech $80.00 214 $17,120.00 Clerical I I $55.00 16 $880.00 Total Labor Cost $39,510.00 Page T -3 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Project Project Senior Task 4 Task Description Manager Engineer Cadd Tech Clerical Subconsultant Permitting Prepare and submit FDEP permit application. (City to 1 provide pertinent information on permit application). 1 3 2 2 3 Respond to RAI from Permitting Agency 1 2 1 1 4 Pay FDEP permit fee $500.00 (wastewater) Reimbursement by City. 1 1 SUBTOTAL DIRECT LABOR 2 6 3 4 $0.00 SUBTOTAL LABOR $1,520.00 Subconsultant $0.00 Misc Exp. $527.50 TOTAL TASK 4 $2,047.50 RATE Project Manager $155.00 2 $310.00 Project Engineer $125.00 6 $750.00 Senior Cadd Tech $80.00 3 $240.00 Clerical II $55.00 4 $220.00 Subtotal Raw Labor $1,520.00 Page T -4 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Project Project Sr. Cadd Task 6 Task Description Manager Engineer Tech Clerical Subconsultant Bidding Assistance 6.1 Furnish 15 sets of drawings, CD's and technical specs for bidding purposes 1 3 3 2 6.2 Attend pre -bid conference 3 2 6.3 Consider written questions and prepare addenda as required related to water main design. 1 4 2 2 Review and evaluate the three (3) lowest bid packages 6.4 and verify bidder's experience and references and make a recommendation of award to the City 2 4 SUBTOTAL DIRECT LABOR 7 7 5 10 $0.00 SUBTOTAL LABOR $2,910.00 See supporting documentation for breakdown Subconsultant $0.00 of miscellaneous expenses Misc. Expenses $615.00 TOTAL TASK 6 $3,525.00 RATE Project Manager $155.00 7 $1,085.00 Project Engineer $125.00 7 $875.00 Senior Cadd Tech $80.00 5 $400.00 Clerical I I $55.00 10 $550.00 Subtotal Raw Labor $2,910.00 Page T -5 MISCELANEOUS EXPENSES Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main 1 ITEM DESCRIPTION TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 COST UNIT Qty I Ext Qty I Ext _ Qty Ext Qty Ext Qty Ext Photocopies 8 1/2 x 11 $0.05 Sheet 150 $7.50 50 $2.50 500 $25.00 50 2.50 7500 $375.00 Photocopies 11 x 17 $0.20 Sheet 20 $4.00 20 $4.00 Blueprinting 24" x 36" (2 -D Color Line Drawings) $1.25 Sheet 20 $25.00 20 $25.00 20 25.00 150 $187.50 FDEP Permit Fee $500.00 Each 1 500.00 1 Digital Camera $10.00 Ea Use 1 $10.00 Diskette $3.50 Disk 1 $3.50 15 $52.50 Miscellaneous TOTALS $46.50 $2.50 $57.50 $527.50 $615.00 Page T -6 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main TASK SUMMARY 'LUMP SUM TASKS TASK 1 PRELIMINARY ENGINEERING $11,471.50 TASK 2 SURVEY & GEOTECHNICAL $15,143.50 TASK 3 PREPARATION OF CONSTRUCTION DOCUMENTS $39,567.50 TASK 4 PERMITTING SERVICES $2,047.50 TASK 5 BIDDING SERVICES $3,525.00 TOTAL LUMP SUM PROJECT DESIGN COST $71,755.00 Page T -7