Loading...
HomeMy WebLinkAbout2018 10 08 Consent 301 Asphalt Resurfacing of City Hall Parking LotCOMMISSION AGENDA ITEM 301 REQUEST: Informational Consent X Public Hearings Regular October 08, 2018 KS BF Regular Meeting City Manager Department The Community Development Department requesting the City Commission's authorization to issue a purchase order to The Middlesex Corporation for the asphalt resurfacing of the City Hall parking lot in the amount of $87,235.00 plus a 10% contingency, piggybacking off Seminole County Contract #IFB-602096-14BJC. SYNOPSIS: This item provides for the milling and resurfacing of the entire City Hall parking lot. CONSIDERATIONS: . The City Hall parking lot was recently evaluated for signs of pavement deterioration, age, and drainage. Based on Staff s evaluation of the parking lot, along with the additional construction work around City Hall that have recently damaged the asphalt, Staff recommends resurfacing of the asphalt parking lot. The asphalt resurfacing project will include milling and resurfacing of the paved parking areas and installation of a new asphalt drive-thru lane for the utility payment kiosk, which is currently under construction. The City Hall main entrance driveway from SR 434 will be resurfaced during the upcoming construction of the SR 434 westbound turn lane at City Hall. Striping will be completed under a separate purchase order. Work is expected to take place in late October. The work will be performed in phases such that areas of the City Hall parking lot will remain open at all times for customer and employee parking. Consent 301 PAGE 1 OF 2 - October 08, 2018 FISCAL IMPACT: The project cost is $87,235.00 plus a 10% contingency, for a total authorization of $95,958.50, funded by the Infrastructure Surtax Fund (3rd Generation Sales Tax). COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends that the City Commission authorize the issuance of a purchase order to The Middlesex Corporation for the asphalt resurfacing of the City Hall parking lot in the amount of $87,235.00 plus a 10% contingency, piggybacking off Seminole County Contract #IFB-602096-14BJC, funded by the Infrastructure Surtax Fund. ATTACHMENTS: Exhibit A - Middlesex Bid Form (1 page) Consent 301 PAGE 2 OF 2 - October 08, 2018 Exhibit A ASPHALT RESURFACING OF CITY HALL PARKING LOT PRICING FORM ITEM NUMBER DESCRIPTION UNIT QUANTITY UNIT.PRI:CE TOTAL 1 MOBILIZATION LS 2 MAINTENANCE OF TRAFFIC LS 1 �, C:>0 �"' S C) U ' OCD 3 EROSION PROTECTION LS 1 3 C) c> ld 300 . 0 4 MILLING OF EXISTING ASPHALT 11" AVG DEPTH) SY 5,900 1 S� G� !� 1AIS. 0o 5 ISUPERPAVE ASPHALTIC CONCRETE SP -9.5 (TRAFFIC C) TN 345 6 CITY HALL KIOSK AREA LS 1 2 Ove 2-6, UC>0 - 0<3 TOTAL PRICE (SUM OF ITEMS 91 THROUGH #7): PAY ITEM NOTES: 2 Includes the cost of all items needed for traffic control, f barricades, flagmen, temporary variable message signs, etc.) in accordance with FDOT standards 4 Quantity based on 110 lbs per square yard per 1 -inch lift 5 Unit price includes all equipment, labor, and materials including bituminous material (plant mixes, prime coats, and tack coats) and all other incidental costs to complete the work. 6 The lump sum item for the City Hall Kiosk Area includes all preparation costs for the installation of a new vehicle drive thru area. The estimated square yardage for this area is 151 SY. The lump sum item includes mobilization, maintenance of traffic, re -grading, compaction, and rolling of the new asphalt millings plus any miscellaneous work needed for a complete installation, restoration, and cleanup. The asphalt quantity of this lump sum item is included within Bid Item #6.