Loading...
HomeMy WebLinkAbout2018 07 09 Consent 307 Painting of Two Ground Storage TanksCOMMISSION AGENDA ITEM 307 REQUEST: Informational Consent X Public Hearings Regular July 09, 2018 SB LR Regular Meeting City Manager Department The Utility Department requesting City Commission approval to award a contract to Regal Painting of Central Florida in the amount of $37,535.00 plus a 5% contingency for painting two water storage tanks. SYNOPSIS: The purpose of this agenda item is to authorize painting in the amount of $37,535.00 plus a 5% contingency to Regal Painting of Central Florida for the painting of a two million gallon ground storage tank located at the West Wastewater Treatment Facility and a three million gallon ground storage tank located at the East Wastewater Treatment Facility. CONSIDERATIONS: The ground storage tanks were constructed in 1992 by Crom Corporation. This project is needed to preserve the aesthetic and prolong the service life of the reclaimed water ground storage tanks. Staff solicited proposals from three companies and Regal Painting of Central Florida was the lowest bid and qualified painting company at $37,535.00. FISCAL IMPACT: The project cost of $37,535.00 plus a 5% contingency will be funded by the FY 18 Utility Enterprise Fund. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and Consent 307 PAGE 1 OF 2 -July 09, 2018 the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends the City Commission award a contract to Regal Painting of Central Florida in the amount of $37,535.00 plus a 5% contingency to paint the reclaimed water ground storage tanks at the East and West Wastewater Treatment Facilities, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: There are three attachment included: 1) Regal Painting quote (2 pages) 2) Aerials of the East and West WWTF Ground Storage Tanks (2 pages) Consent 307 PAGE 2 OF 2 -July 09, 2018 Rega(Painting e Cmtraf T&Kda 1017 Chesterfield Circle Winter Springs, FL 32708 407-695-8498 Regal Paint ing.com Name / Address City Of Winter Springs attn: Tim Hillery 407-3 W-5810 I Property Location 1000 SR 434 Winter Springs, FL 32708 Estimate Date Estimate # 6/1212018 A7863 Description Total Cost. Exterior Painting: 16.681,00 water storage tank: 2,000,000 gallons- - side walls & top dome - 1) pressure clean with a minimum 3000 PSI using a 20 % bleach/water and TSP solution 2) apply Tnemee # 1026 light color, one coat will be applied at an approximate spread rate of 6.0 we mils using an airless sprayer and backrolled warranty: 4 year limited warranty ( attached ) insurance: certificates of general liability and worker's compensation coverage available upon request contractor will supply materials, labor, tools & equipment Acceptance of proposal date Please sign and return to schedule'start date of job. Payment terms: to be determined material and labor included Total Cost $16,685.00 Pxg a C Tainting Of CMtru(Fla 1017 Chesterfield Circle Winter Springs, FL 32708 407-695-8498 RegalPainting.com Name /Address ('Its Of Winter Springs attn: Tim Hillery. 407-314-5810 Property Location 1560 Winter Springs Blvd. Winter Springs, FL 32708 Estimate Date Estimate # 6/12/2018 1 A7864 Description Total Cost Exterior Painting: 20,850.00 water storage tank: 3,000,040 gallons- - side walls & top dome - 1) pressure clean with a minimum 3000 PSI using a 20 % bleach/water and TSP solution 2) apply Tnemec # 1026 dark color, one coat will be applied at an approximate spread rate of 6.0 wet mils using an airless sprayer and backrolled 3) 6 inch steel pipe- hand tool rusty areas, treat rust using Ospho Rust Treatment, and apply rust inhibitor primer and apply Sherwin Williams Pro Industrial enamel, two coats warranty: 4 year limited warranty ( attached ) insurance:- certificates of general liability and worker's compensation coverage available upon request contractor will supply materials, labor, tools & equipment Acceptance of proposal date Please sign and return to schedule start date of job. Payment terms: to be determined' material and labor included Total Cost $20.850.00 West WWTF j Two Millon Gallont , Ground Storage Tank AWN t ArS vl� 7s'Y L o r �, w -r s _ rs I. tovt do { Al r i