Loading...
HomeMy WebLinkAbout2017 03 13 Consent 302 Sam Smith Park - Playground EquipmentCOMMISSION AGENDA ITEM 302 REQUEST: Informational Consent X Public Hearings Regular March 13, 2017 KS CC Regular Meeting City Manager Department The Parks and Recreation Department requests Commission approval to enter into a contractual agreement with REP Services, Inc. for purchase of playground equipment for Sam Smith Park in the amount of $134,428.71, plus a 15% contingency, piggybacking off of Clay County Board of County Commissioners RFP #13/14 -8. SYNOPSIS: The Sam Smith Park playground has reached its useful life expectancy and is in need of replacement. In keeping with our systematic playground equipment replacement/expansion schedule, we plan to both relocate and expand the park's playground facilities and will include equipment, shade covers, surfacing, borders, certified playground mulch and accessibility issues involved for safety. Relocation was recommended by the Police Department for safety reasons. Restrooms & new entry walkway will be added in Phase II of the project. Staff requests City Commission approval for the purchase of playground equipment from REP Services Inc. in the amount of $134,428.71 plus a 15% contingency. Work is scheduled to begin in March 2017. CONSIDERATIONS: • Sam Smith playground equipment has reached its useful life expectancy. • New footprint for playground has larger capacity to include unique play features as well as traditional elements such as swings & slides for an increased play value similar to Moss Park. • Risk Management and Parks & Recreation have recommended replacement of Sam Smith Park playground. • WS Police has recommended relocation of playground for more visibility & safety. Consent 302 PAGE 1 OF 2 - March 13, 2017 New location will provide a common play area for both 2 -5 yr old & 5 -12 yr old playgrounds. • Replacement/expansion will include new equipment, shade covers, surfacing, borders, certified playground mulch and all accessibility issues involved for safety. • New parts on old equipment are not covered by any manufacturer's warranty, therefore, replacement is best option. • Pictures of proposed Sam Smith Park playground equipment attached herein (Exhibit A). • Pictures of proposed Sam Smith Park restroom building (phase II)attached herein (Exhibit A). • After Sam Smith Park is completed, our prioritized replacement schedule for all parks will be continued until all playgrounds are replaced or satisfactorily repaired. FISCAL IMPACT: Project cost is $134,428.71, plus a 15% contingency, which will be funded from the Park Impact Fee Fund ($100,000) and the General Fund ($54,593). COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends that the City Commission approve the authorization to enter into a contract agreement with REP Services Inc. for purchase of playground equipment for Sam Smith Park in the amount of $150,000 plus a 15% contingency, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: A. Pictures of Proposed Sam Smith Park Playground Equipment & Restroom Consent 302 PAGE 2 OF 2 - March 13, 2017 INC. REP SERVICES, C fwg!'-A� Experts at Play & Outdoor Spaces Site Amenities ■ Playground Equipment ■ Safety Surfacing ■ Shade Phonic: 40783 L 9658 f :866.232.8532 r_ -,err: Pagel of 3 Please mail POs, contracts and checks to: Rep Services, Inc. 581 Technology Park, STE 1009 Lake Mary, FL 32746 -7127 Proposed City of Winter Springs To: Parks and Recreation 1000 Central Winds Drive Winter Springs, FL 32708 -2799 Attn: Chris Caldwell Project No: 11873 Project Name: Proposal No: 11873.07 Proposal Proposal Date: 3/7/2017 Proposal For Questions Contact: Jacqui Rohrborn Sales Consultant: Nathan Almon Ship Various locations Bill City of Winter Springs To: To: Parks and Recreation 1000 Central Winds Drive Winter Springs, FL 32708 -2799 Attn: Attn: Chris Caldwell City of Winter Springs Sam Smith Memo Project Contact: Chris Caldwell Name: Sam Smith - Playground 6 -2 Revised Project Location: 1562 Winter Springs Blvd Expires: 4/6/2017 Winter Springs, FL 32708 407 - 915 -7860 1Z jacqui@repservices.com 407 - 915 -7838 1Z nathan @repservices.com Opt /Rev: A/2 Printed: 3/7/2017 - NA Vendor: Landscape Structures Proj Drawings: 11873 -6 -2 Revised 556139 Class Part No Qty Description THANK YOU FOR THE OPPORTUNITY TO PRESENT LSI PRODUCTS Unit Price Disc Net Price Ext Price Miscellaneous TY 1 EA 0.00 -2.0% 0.00 0.00 PlayBooster Ages 5 -12 Climbers IP158997A -001 1 EA Pod Climber 10 DB 197.00 -2.0% 193.06 193.06 IP189329A -001 1 EA Eclipse Net Climber DB Only 15,801.00 -2.0% 15,484.98 15,484.98 More Fun PB166809A -001 1 EA E -Pod Seat 213.00 -2.0% 208.74 208.74 Posts PB1 11 404F-001 2 EA 108A1um Post DB 209.00 -2.0% 204.82 409.64 Signage IP182503C -001 1 EA Welcome Sign (LSI Provided)JAges 5 -12 years Direct Bury 0.00 -2.0% 0.00 0.00 Slides & Gliders PB183176A -001 1 EA Rush Slide DB Only 3,141.00 -2.0% 3,078.18 3,078.18 Surfacing IP100626A -001 63 EA 30 Galvanized Stake 10.00 -2.0% 9.80 617.40 I P1 19214A-001 55 EA Tuff - Timber 4' 35.00 -2.0% 34.30 1,886.50 IP130799A -001 1 EA TuffTimbers Access Wedge 594.00 -2.0% 582.12 582.12 Swings IP174018A -001 2 EA Belt SeatlProGuard Chains for 8' Beam Height 90.00 -2.0% 88.20 176.40 IP177332A -001 1 EA Single Post Swing FrameJ8' Beam Height Only 914.00 -2.0% 895.72 895.72 PlayBooster Ages 5 -12 Total: $23,532.74 Weevos Ages 2 -5 Bridges /Ramps WV164178A -001 1 EA Boppity Bridge DB 4,268.00 -2.0% 4,182.64 4,182.64 Climbers WV164171A -001 1 EA Giggle Jiggler DB 2,542.00 -2.0% 2,491.16 2,491.16 WV164172A -001 1 EA Wee Pod Climber DB 881.00 -2.0% 863.38 863.38 CoolToppers IP15988213-001 1 EA 24x24 Shade Pyramid110'Roof Height 60Bury 5,322.00 -2.0% 5,215.56 5,215.56 Kids In Motion IP173591A -001 1 EA OmniSpin Spinner Surface Mount 5,592.00 -2.0% 5,480.16 5,480.16 More Fun WV164173A -001 1 EA Twirly Bar DB 398.00 -2.0% 390.04 390.04 WV173576A -001 1 EA Alphamaze /Labyrinth Panel DB 1,082.00 -2.0% 1,060.36 1,060.36 WV173582A -001 1 EA Imagination Table DB 1,205.00 -2.0% 1,180.90 1,180.90 Signage IP182503A -001 1 EA Welcome Sign (LSI Provided)JAges 2 -5 years Direct Bury 0.00 -2.0% 0.00 0.00 Slides & Gliders WV164174A -003 1 EA Cozy Coaster Slidelw /ASTM Handrail DBJw /Stairs Under Large Arch 4,535.00 -2.0% 4,444.30 4,444.30 Surfacing IP100626A -001 56 EA 30 Galvanized Stake 10.00 -2.0% 9.80 548.80 I P1 19214A-001 48 EA Tuff - Timber 4' 35.00 -2.0% 34.30 1,646.40 IP130799A -001 1 EA TuffTimbers Access Wedge 594.00 -2.0% 582.12 582.12 Swings IP176038A -001 2 EA Full Bucket SeatlProGuard Chains for 8' Beam Height 213.00 -2.0% 208.74 417.48 IP177332A -001 1 EA Single Post Swing FrameJ8' Beam Height Only 914.00 -2.0% 895.72 895.72 Weevos WV16417OA -001 1 EA Weevos 3 Arch Mainstructure DB Only 2,267.00 -2.0% 2,221.66 2,221.66 Weevos Ages 2 Discount per the Clay County Contract #13/14 -8: $19125.58 Product Subtotal: 4 Sets of Signed & Sealed Engineering: Freight: Prepaid Ship Method: Best Way FOB: Destination Weight: 6,198 Ibs Freight Charge: Landscape Structures Total: -5 Total: $31,620.68 $55,153.42 $3,000.00 $5,520.00 $63,673.42 Proposal No: 1 1873.07 Project Name: City of Winter Springs Sam Smith Memorial Proposal Date: 3/7/2017 Page 2 of 3 Vendor: LSI SkyWays Proj Drawings: 11873 -6 -1 554739 Class Part No Qty Description Unit Price Disc Net Price Ext Price Custom TY 1 EA 0.00 -2.0% 0.00 0.00 SkyWays Shade Shade IP215186D -001 1 EA SkyWays Hip 35'x35' Shadel14' Roof Height 11,389.50 -2.0% 11,161.71 11,161.71 Discount per the Clay County Contract #13/14 -8: $227.79 Product Subtotal: 4 Sets of Signed & Sealed Engineering: Freight: Prepaid Ship Method: Best Way FOB: Destination Weight: 2,393 Ibs Freight Charge: LSI SkyWays Total: $11,161.71 $800.00 $2,060.00 $14,021.71 Vendor: Irvine Wood Recovery Proj Drawings: 11873 -6 -2 556142 Class Part No Qty Description Unit Price Disc Net Price Ext Price Surfacing RSI -EWF -C 260 Engineered Wood Fiber for Playground, per cubic yard 27.50 -5.0% 26.13 6,792.50 Discount per the Clay County Contract #13/14 -8: $357.50 Product Subtotal: Freight: Prepaid Ship Method: Best Way FOB: Destination Freight Charge: Irvine Wood Recovery Total: Vendor: RSI Certified Installer Item Qty Description PERMIT FILING 1 EA Labor charge for Licensed Contractor to file for building permit from the appropriate jurisdiction. NOTE: Permit Fees charged by the jurisdiction will be prepaid and invoiced separately and may require a change order to your Purchase Order or Contract. $6,792.50 $1,166.08 $7,958.58 556049 Unit Price Ext Price 750.00 750.00 OTHER 1 EA Fine Grading, 5190sf 1,965.00 1,965.00 INS -CON SIDEWALK 1 LT 60 If of 4" concrete sidewalk 2,050.00 2,050.00 INS -LSI 1 LT Installation Drawing No. 11873 -6 -2 Revised Landscape Structures Play Equipment 19,350.00 19,350.00 INS -IRV 1 LT Installation - Engineered Wood Fiber Surfacing by Irvine Wood Recovery 4,400.00 4,400.00 OTHER 1 EA Provide and install fabric 1,895.00 1,895.00 OTHER 1 EA Haul off excavated material from Play Equipment and CoolTopper installation 1,015.00 1,015.00 OTHER 1 EA Sod replacement 1,270.00 1,270.00 INS -SKY 1 LT Equipment Installation - LSI SkyWays 2,560.00 2,560.00 INS -CON FT 4 LT Install Concrete Footing(s) 2,455.00 9,820.00 RELOCATE 1 EA Relocate Existing Oodle Swing 1,200.00 1,200.00 ESTIMATED PERMIT FEE PERMIT FEE 1 EA ESTIMATED Permit fees charged by the Building Department for the building permit and by the Clerk of the Circuit Court for the Notice of Commencement have been prepaid. The receipts are attached. RSI Certified Installer Total: General Terms of Sale and Proposal Summary 2,500.00 2,500.00 $48,775.00 Gov't: N30; Resellers, 100% w /order. Others: 50% down, balance prior to ship. Product: Note: Orders less than $5,000 require full payment for product with the order. Installation: Freight: A 2% convenience fee will be added to credit card payments. Proposal Total: $76,907.63 $48,775.00 $8,746.08 $134,428.71 Notes The Clay County Contract #13/14 -8 provides a 5% discount on Irvine product. The maximum price for installation is 99% of the product price. (Installation does not include site prep, slabs, footings or engineering). The Clay County Contract #13/14 -8 provides a 2% discount on LSI product. The maximum price for installation is 45% of the product price. (Installation does not include site prep, slabs, footings or engineering). Basis of Proposal Our proposal is based upon your email request. Estimated project completion schedule Your order will take approximately 15 weeks from receipt to completion of installation. This includes a 4 week allowance for permitting which may take longer. RSI will respond in a timely fashion after receipt of order /contract /letter of intent /notice to proceed. Landscape Structures: When placing an order, please select colors from those shown on pages 236 -238 of the catalog. Proposal No: 1 1873.07 Project Name: City of Winter Springs Sam Smith Memorial Proposal Date: 3/7/2017 Page 3 of 3 SkyWays Shade by LSI: SkyWays Shadesure® high- density polyethylene fabric is breathable, weather - resistant, flame- resistant and blocks up to 90% of the sun's harmful UV rays. The frames (without the fabric) are designed for 150 MPH winds. Shadesure® tops are to be removed if winds exceed 80 MPH. Color options are shown on page 237 & 238 of the LSI catalog. Color selections are to accompany all orders. Engineered Wood Fiber: "' IPEMA CERTIFIED ASTM F1292 -13 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment and ASTM F2075 -10a Standard Specification for Engineered Wood Fiber for Use as a Playground Safety Surface Under and Around Playground Equipment. Drainage is extremely important to the long term performance of your playground surfacing. A minimum of a 12" depth of surfacing material must be maintained at all times. "' This is a natural product. Particle size, texture and color may vary from a tan to a dark brown due to the natural conditions of the environment. This proposal is for Engineered Wood Fiber playground surfacing delivered to the site. Freight prices are subject to an energy /fuel surcharge if implemented between the time of quote and placement of order. Installation: Unless otherwise noted, the following items are to be PROVIDED BY CUSTOMER prior to installation: • Site security to prevent theft or vandalism of equipment. • Water and 110 Electric. • Underground Utilities Located and Marked prior to installation. • Storage. • Trash Dumpster to accommodate construction waste. • Does not include soil density or concrete testing THIS PROPOSAL DOES NOT INCLUDE PERMIT FEES ASSESSED BY THE BUILDING DEPT. Those fees will result in additional charges. Installation Charges on this proposal are based on NO UNFORESEEN conditions in the area, above or below the surface. If unforeseen conditions arise, the installation charges will change to reflect additional costs associated with dealing with those circumstances. Examples of this include, but are not limited to: site not ready upon installer's arrival, underground utilities, or difficulties with footers due to coral rock or ground water in the holes. The undersigned warrants that he /she is an authorized representative of the company noted and has the requisite authority to bind said company and /or principal. If any particular billing is not paid when due, all outstanding balances, regardless of prior terms, will become immediately due and owing upon demand. Interest on past due amounts will be assessed at 1 Y2 % per month or the maximum interest rate permitted by applicable law, whichever is less. Should it become necessary for either party to this contract to institute legal action for enforcement of any provisions of this contract, the prevailing party shall be entitled to reimbursement for all court costs and reasonable attorney's fees incident to such legal action. The parties hereto agree that proper venue for any legal action in any way related to this contract shall be in Seminole County, FL. Accepted By: City of Winter Springs Company Name Authorized By Printed Name Date As Its: (Title) / I I I MATCHLINE o i �0 0 00 ay rc¢ PlayBooste� tm years) . /11' —e i' / RELOCATED OODLE SWING / I NOT FOR CONSTRUCTION m'su wog �\ I I (2 -5 years) ) � I V � � I a �M �� A ) 159882 / 24X24- 1O'HEIGHT anon / ' SHADE PYRAMID / PYRAMID POST REQUIRE i 2 -5 AGE AREA TOTAL ELEVATED PLAY COMPONENTS 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY RAMP D RE UIRED 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY TRANSFER 0 REQUIRED 0 TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN 11 RFOUIRFD D TOTAL DIFFERENT TYPES OF GROUND LEVEL COMPONENTS B RE UIRED 0 5 -12 AGE AREA TOTAL ELEVATED PLAY COMPONENTS 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY RAMP D REQUIRE 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY TRANSFER 0 REQUIRED 0 TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN 6 REOUIRED D TOTAL DIFFERENT TYPES OF GROUND LEVEL COMPONENTS 4 REQUIRE 0 60 BURY MINIMUM USE ZONE REQUIRED, 4' TUFFTIMBER BORDER, TYP. i< / u 17— sui V e riu �cswn� / MATCHLINE MATCHLINE TOTAL PLAY COMPONENTS: 2 -5 AGE AREA — 11 5 -12 AGE AREA — 6 SURFACING: 5190 SF ENGINEERED WOOD FIBER T FALL HEIGHT 182503 1825133 WELCOME SIGN WELCOME SIGN (LSI PROVIDED) (LSI PROVIDED) 5 -12 YEARS 2 -5 YEARS WELCOME SIGN TO BE LOCATED IN CONSULTATION WITH OWNER GENERAL NOTES: 1. EQUIPMENT LOCATION TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION 2. ACCESSIBLE ROUTE OF TRAVEL TO THE PLAYGROUND TO BE PROVIDED BY OTHERS 3. BASE MUST EXHIBIT POSITIVE DRAINAGE IN ALL AREAS 'SEE SHEET P -2 FOR SHEET NO. SITE LOCATION MAP L�6 ENLARGEMENT RSI PROJ: 11873 CSCALE: 1/8" = 1' � Sam Smith Memorial Park Playground Winter Springs, FL E REP SERVICES, INC. IeSlib, 0 4 8 16 1, FOR Experts at Pfay & Outdoor Spaces .haemr� mmmmmmmmmmm mm "TCHLINE i' / RELOCATED OODLE SWING / I NOT FOR CONSTRUCTION m'su wog �\ I I (2 -5 years) ) � I V � � I a �M �� A ) 159882 / 24X24- 1O'HEIGHT anon / ' SHADE PYRAMID / PYRAMID POST REQUIRE i 2 -5 AGE AREA TOTAL ELEVATED PLAY COMPONENTS 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY RAMP D RE UIRED 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY TRANSFER 0 REQUIRED 0 TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN 11 RFOUIRFD D TOTAL DIFFERENT TYPES OF GROUND LEVEL COMPONENTS B RE UIRED 0 5 -12 AGE AREA TOTAL ELEVATED PLAY COMPONENTS 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY RAMP D REQUIRE 0 TOTAL ELEVATED COMPONENTS ACCESSIBLE BY TRANSFER 0 REQUIRED 0 TOTAL ACCESSIBLE GROUND LEVEL COMPONENTS SHOWN 6 REOUIRED D TOTAL DIFFERENT TYPES OF GROUND LEVEL COMPONENTS 4 REQUIRE 0 60 BURY MINIMUM USE ZONE REQUIRED, 4' TUFFTIMBER BORDER, TYP. i< / u 17— sui V e riu �cswn� / MATCHLINE MATCHLINE TOTAL PLAY COMPONENTS: 2 -5 AGE AREA — 11 5 -12 AGE AREA — 6 SURFACING: 5190 SF ENGINEERED WOOD FIBER T FALL HEIGHT 182503 1825133 WELCOME SIGN WELCOME SIGN (LSI PROVIDED) (LSI PROVIDED) 5 -12 YEARS 2 -5 YEARS WELCOME SIGN TO BE LOCATED IN CONSULTATION WITH OWNER GENERAL NOTES: 1. EQUIPMENT LOCATION TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION 2. ACCESSIBLE ROUTE OF TRAVEL TO THE PLAYGROUND TO BE PROVIDED BY OTHERS 3. BASE MUST EXHIBIT POSITIVE DRAINAGE IN ALL AREAS 'SEE SHEET P -2 FOR SHEET NO. SITE LOCATION MAP L�6 ENLARGEMENT RSI PROJ: 11873 CSCALE: 1/8" = 1' � Sam Smith Memorial Park Playground Winter Springs, FL E REP SERVICES, INC. IeSlib, 0 4 8 16 1, FOR Experts at Pfay & Outdoor Spaces .haemr� CONCRETE ACCESS WALKS, LENGTH TO BE DETERMINED SURFACING b1W tlI- ENGINEERED WOOD FIBER 8' FALL HEIGHT GENERAL NOTES: 1. EQUIPMENT LOCATION TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION 2. ACCESSIBLE ROUTE OF TRAVEL TO THE PLAYGROUND TO BE PROVIDED BY OTHERS 3. BASE MUST EXHIBIT POSITIVE DRAINAGE IN ALL AREAS NOT FOR CONSTRUCTION SHEET NO P -2 PAPER SIZE B Site Location Map - Sam Smith Memorial Park RSIPROJ: DRAWING: 11873 -6 -2 Revised SCALE: ° =20' Winter Springs, FL !"N REP SERVICES, INC. A 0 10 20 40 j, 9: Experts at Play & Outdoor Spaces I„rm �i t-1 ,� Better playgrounds. st'r, a e _ ` Better world ® structures plaYlsi.com Proudly presented by: Nathan Almon Cam, ul' REP SERVICES, INC. Experts at May b Outdoor Spaces Better playgrounds. landsca e _ Better world." 5 � ~ strUCtUr @s" �' 1 -- playisi.com Proudly presented by: Nathan Almon ,f- 164 REP SERVICES, INC. Experts at May b Outdoor Spaces t7, h Better playgrounds. landsca a Better world ®� structures 1 playlsi.com Proudly presented by: Nathan Almon AF ro"i 164 REP SERVICES, INC. Experts at May b Outdoor Spaces