Loading...
HomeMy WebLinkAbout2016 05 09 Consent 308 City Hall Turn Lane - Design Services Task Order for Pegasus Engineering LLCCOMMISSION AGENDA ITEM 308 REQUEST: Informational Consent X Public Hearings Regular May 09, 2016 KS KL Regular Meeting City Manager Department The Public Works Department requests the City Commission's authorization to execute a task order with Pegasus Engineering, LLC in the amount of $48,610.12 for the design of a right -turn deceleration lane on S.R. 434 westbound at the City Hall entrance, funded by Transportation Impact Fees. SYNOPSIS: A right -turn deceleration lane on S.R. 434 westbound at City Hall will improve safety for vehicles turning right into the City Hall parking lot, especially during peak traffic hours on S.R. 434. CONSIDERATIONS: S.R. 434 at City Hall currently has a posted speed limit of 45 MPH. Drivers on westbound S.R. 434 turning right into City Hall have expressed concerns about safely completing the turning movement into City Hall with the high speed and heavy traffic on S.R. 434. . A right -turn deceleration lane will improve the safety of the right -turn movement into the City Hall parking lot. In addition, the volume of turning movements into City Hall from S.R. 434 is expected to increase as the RiZE apartment building adjacent to City Hall becomes fully occupied. . Pegasus Engineering, LLC is a continuing engineering services consultant for the City (RFQ #001 /15BF) who has completed the design for multiple deceleration lane projects in Winter Springs, including turn lanes at Hayes Road, Vistawilla Drive, and Consent 308 PAGE 1 OF 2 - May 09, 2016 Wade Street. The cost to complete the design and obtain the applicable permits from FDOT and SJRWMD is $48,610.12. . The construction cost of the turn lane is estimated to be between $200,000 and $250,000. Staff will be submitting the project for possible state or federal funding, similar to the funding obtained for the recently completed improvements at S.R. 434 and Tuskawilla Road (Market Square). This agenda item is not requesting construction funding (only design). FISCAL IMPACT: The design and permitting cost is $48,610.12, funded by a supplemental appropriation from the Transportation Impact Fee Fund balance in the amount of $48,610.12. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends the City Commission authorize the execution of a task order with Pegasus Engineering, LLC in the amount of $48,610.12 for the design of a right -turn deceleration lane on S.R. 434 westbound at the City Hall entrance and approve a supplemental appropriation of $48,610.12 from Transportation Impact Fee Fund balance to the project line code. ATTACHMENTS: 1. Exhibit A - Pegasus Engineering Proposal (8 pages) Consent 308 PAGE 2 OF 2 - May 09, 2016 *:/:11:31x_1 Pe"[J' c!sus ENGINEERING April 19, 2016 Mr. Brian Fields, P.E. City Engineer City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708 Re: Proposal for Professional Engineering Services State Road 434 and City Hall Access Drive Intersection Improvements Dear Mr. Fields: P- 169402 Pegasus Engineering, LLC (PE) is pleased to provide this proposal for professional engineering design and permitting services for the State Road 434 and City Hall Access Drive Intersection Improvements project. The project consists of the final design and permitting for the addition of a westbound right -turn deceleration lane along State Road 434. The approximate length of this turn lane is 210 feet (see attached exhibit). BASIC ENGINEERING SERVICES Following is a list of Basic Services we anticipate, as necessary to accomplish the work required for the above referenced project. This scope and proposal is based on FDOT and City of Winter Springs Standards. DESIGN SURVEY AND SUBSURFACE UTILITY EXCAVATION (SUE) SERVICES See attached proposal from SSMC. GEOTECHNICAL ENGINEERING SERVICES See attached proposal from PSI. CIVIL ENGINEERING SERVICES 1. Final Engineering: A. Prepare final construction drawings suitable for bidding and construction for the required improvements. Design services will be provided for the following: 1) Roadway typical section. Lf fr,fuaring A Higher Standard" 301 West State Road 434, to 309, Winter Springs, FL 32708 •407- 992 -9160 • Fax 407 - 358 -5155 Mr. Brian Fields, P.E. April 19, 2016 Page 2 2) Roadway paving, grading, and drainage improvements. 3) Pavement analysis and design. 4) Quantity computations. 5) Utility coordination and adjustment sheets. 6) Signing & pavement marking plans. 7) Temporary Traffic Control Plan notes. 1'ai1=11[iya B. Conduct meetings with the City staff to review the construction documents. C. Prepare an opinion of the probable construction costs. D. Coordinate with and respond to FDOT's review comments. 2. Permitting Services: The following permits /approvals are anticipated to be required prior to construction, or in conjunction with the proposed improvements. Applications for these permits /approvals will be completed, submitted to the City for execution, and forwarded to the appropriate regulatory agency for processing. Coordination with the regulatory agencies will be provided during the permit application review process, and requests for additional information as related to the engineering issues will be addressed. Attendance at the required meetings will also be performed. A. SJRWMD ERP permit modification. B. FDOT Driveway Connection Permit. COMPENSATION Final Engineering and Permitting ............... ............................... .....................$48,610.12 Refer to Attachment "A "for a detailed breakdown of the manhours and fees. "Engineering A Higher Standard" 301 West State Road 434, Suite 309, Winter Springs, FL 32708 •407- 992 -9160 • Fax 407 - 358 -5155 Mr. Brian Fields, P.E. April 19, 2016 Page 3 SCHEDULE 1'01 =11[1ya A six (6) month project schedule is anticipated to complete the design of this project. We appreciate the opportunity to provide this proposal and trust that the information provided herein is sufficient for your needs. If you have any questions or require additional information, please contact us. Very truly yours, PEGASUS ENGINEERING, LLC Fursan S. Munjed, P.E. Principal Attachments "Engineering A Higher Standard" 301 West State Road 434, Suite 309, Winter Springs, FL 32708 •407- 992 -9160 • Fax 407 - 358 -5155 ATTACHMENT "A" FINAL DESIGN MANHOUR & FEE ESTIMATE Project Name: SR434 at City Hall Description: Intersection Improvements - Add a Westbound Right -Turn Deceleration Lane Prepared By: Fursan Munjed Date: 4/19/16 P- 169402 No. /Activity Project Manager Project Engineer Designer Administrative TOTAL Man Hours Hourly Rate Man Hours Hourly Rate Man Hours Hourly Rate Man Hours Hourly Rate Manhours By Activity Salary Cost For Activity Average Hourly Rate Roadway Design and Plans 35 $165.92 81 $121.42 104 $79.64 10 $63.35 230 $24,558.28 $106.78 Drainage Plans 16 $165.92 37 $121.42 48 $79.64 6 $63.35 107 $11,350.08 $106.08 Signing/Marking Plans 4 $165.92 8 $121.42 11 $79.64 1 $63.35 24 $2,574.43 $107.27 TOTALS 55 $9,125.60 126 $15,298.92 163 $12,981.32 17 $1,076.95 361 $38,482.79 $106.60 TOTAL CONTRACT FEE COMPUTATION Salary Cost (a) Design Survey (b) Vacuum Excavations (Soft Digs) (c) Geotechnical Engineering (d) Direct Reimbursables (e) SJRWMD Permit Modification Fee TOTAL AMOUNT $38,482.79 $3,376.00 $4,032.00 $1,807.00 $384.83 $527.50 $48,610.12 Q:\PROPOSALS\2016\P- 169402 SR 434 Turn Lane at City Hall4P- 169402.XLSJ I. SUMMARY FINAL DESIGN Project Name: SR434 at City Hall Description: Intersection Improvements - Add a Westbound Right -Turn Deceleration Lane Prepared Bv: Fursan Munied Date: 04/19/16 P- 169402 ITEM SCALE 1" BASIS OF ESTIMATE NO. OF UNITS MANHOURS I PER UNIT TOTAL MANHOURS COMMENTS ROADWAY DESIGN AND PLANS Key Map Sheet 1 2 2 Horizontal Alignment - Turn Lane Design L.S. 1 36 36 Summary of Pay Items L.S. 1 12 12 Typical Section Each 1 16 16 General Notes L.S. 1 2 2 Horizontal and Vertical Control L.S. 1 2 2 Plan Sheets 20' Sheet 1 12 12 Cross Sections and Grading Each 10 4 40 Quantities / Computation Book L.S. 1 12 12 Cost Estimate Each 1 4 4 Temporary Traffic Control Details/Notes L.S. 1 8 8 Utility Coordination L.S. 1 16 16 Utility Adjustment Plans Sheet 1 8 8 Erosion Control Details Sheet 3 2 6 Coordination with FDOT & Addressing Comments L.S. 1 24 24 SUBTOTAL 200 QA/QC & Coordination 24 Field Reviews EA 2 1 2 Meetings EA 2 2 4 TOTAL 230 Q: \PROPOSALS \2016 \P - 169402 SR 434 Turn Lane at City Hal l \[P- 169402.XLS]1.SUMMARY FINAL DESIGN Project Name: SR434 at City Hall Description: Intersection Improvements - Add a Westbound Right -Turn Deceleration Lane Prepared Bv: Fursan Munied Date: 01/24/13 P- 129229 ITEM SCALE 1"= I BASIS OF ESTIMATE I NO. OF UNITS MANHOURS PER UNIT TOTAL MANHOURS COMMENTS DRAINAGE PLANS Drainage Data - Ea 4 2 8 Design of Storm Drains Ea 4 4 16 Drain e Analysis & Design L.S. 1 40 40 Permitting L.S. 1 24 24 Coordination with FDOT I I L.S. 1 1 1 8 8 SUBTOTAL 96 QA/QC 8 Field Reviews EA 1 1 1 Meetings EA 1 2 2 TOTAL 107 FINAL DESIGN Project Name: SR434 at City Hall Description: Intersection Improvements - Add a Westbound Right -Turn Deceleration Lane Prepared By: Fursan Munied Date: 04/19/16 P- 169402 ITEM SCALE 1"= BASIS OF ESTIMATE I NO. OF UNITS MANHOURS PER UNIT TOTAL MANHOURS COMMENTS SIGNING AND MARKING PLANS Key Sheet Sheet 1 1 1 Tabulation of Quantities Sheet 1 4 4 General Notes L.S. 1 1 1 Plan Sheets 20' Sheet 1 16 16 SUBTOTAL 22 QA/QC & Coordination 2 TOTAL 24